READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — May 20, 2014 — East County Master Sewer Paln - Page 1 — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 13-East County Master Sewer Paln - Page 1.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station
Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM
Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station
LLY
Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE
Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate
Phase 6: Replace 10" FM at Canal with 16" FM
WOLVERINE
JACKSO N
E
Y
EG
LA R
LL
JC
CO
ER
ROG
S
STIC
VAL A
ANDREW
5
Y8
HW
ND
BO
Arbennie Pritcehtt WRF R TW
O BE
NR
GE Proposed Eglin Main Lift Station
LEWIS TURNER
East County Master Sewer Plan - Page 1
.
MAP PROJECTION:
Lambert Conformal Conic Projection
Stateplane : Flo ida Nor th (0903)
NAD 1983(90), NAVD 1988.
Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD:
This map was created by Okaloosa County GIS
and is in the public domain pur uant
Phase 1 Phase 4 Phase 7 Phase 10
to Chapter 119 , Florida Statutes.
DISCLAIMER:
Phase 2 Phase 5 Phase 10a 1 inch = 2,500 feet
Okaloosa County h reby expressly disclaims
Phase 8 any liability for errors or omissions in
these maps, indexes or legends.
