September 1, 2015

Okaloosa County BOCC — September 1, 2015 — Constantine Task Order 11 Revision 1 — agenda request

Constantine Task Order 11 Revision 1 — agenda request in the September 1, 2015 Okaloosa County BOCC meeting materials. Preserved county-portal original with machine-extracted reading text.

FILED WITH

About this source

Preserved among the September 1, 2015 Okaloosa County Board of County Commissioners meeting materials (IQM2 meeting 1277). The date shown is the verified meeting context, not an independently established creation date for every attachment. The download catalog used July 20, 2015; the meeting date was corrected using the agenda/minutes heading and matching source filename.

Original publication
Action Item Printout
Date
September 1, 2015
Publisher
Okaloosa County Board of County Commissioners
Where to find it
2
Reference collection
Okaloosa County Board of County Commissioners (IQM2 public portal)

Source date and document identity checked for this intake. Machine text has not received independent human proofreading.

HOW FAR THIS HAS BEEN CHECKED

File / copy authenticity
Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
Transcription / extraction
Each reading-text file shows its recorded review status below.
Claim corroboration
Not independently verified
View reference catalogue / source ↗

Download this source

Constantine Task Order 11 Revision 1 — agenda request — extracted reading text

Machine extraction of the preserved PDF embedded text using pdftotext -layout. Form-feed page boundaries retained; no words rewritten. Not independently human proofread; consult the original for layout and uncertain characters.

Text · 2.9 KB · 2

Download ↓

Constantine Task Order 11 Revision 1 — agenda request — preserved PDF

Unchanged downloaded original; SHA-256 checked against the capture inventory.

PDF · 288.0 KB · 2

Download ↓

Reading text

Compare reading text with the preserved source. Line breaks and spacing are retained; long lines wrap to fit the screen. A file's role does not establish that its text has been checked.

Constantine Task Order 11 Revision 1 — agenda request — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: September 1, 2015 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Constantine Task Order 11 Revision 1 DEPARTMENT: Water and Sewer BCC DISTRICT: All STATEMENT OF ISSUE: Okaloosa County Water & Sewer (OCWS) has requested the services of Constantine Engineering under Task Order 11 Revision 1 per the terms of Contract #C13-2068-WS. Revision 1 (attached) adds $60,000.00 to the current Task Order amount, for a new Task Order total of $460,000.00 for services performed in FY2015. Task Order 11 Revision 1, for Sunshine State One-Call of Florida (SSOCOF) services (AKA "line locating"), is attached for your review. BACKGROUND: OCWS has maintained a contract with Constantine Engineering for more than 11 years to perform line location services for responding to SSOCOF service location tickets. This contract is necessary to comply with the Underground Facility Damage Prevention and Safety Act, Florida Statute 556, Sunshine State One-Call of Florida Requirements. On 9/2/2014, the Board of County Commissioners (BCC) approved Constantine Engineering Task Order 11 for FY2015 line locating services, with an amount not to exceed $400,000. This revision to the original task order is required to facilitate mandated services performed by Constantine Engineering in accordance with the above-mentioned state statutes. The current budget ceiling of $400,000 has not yet exceeded, but we are on pace to do so through 9/30/2015, due to an increased amount of construction activity in the region, which ultimately results in more line locating. On behalf of OCWS, Constantine responds to dig tickets or calls placed by contractors, builders, engineers, etc. To adequately support the dig tickets through 9/30/2015, additional professional and technical services associated with locating, verifying, ticket management, and line location services will be required. The budget ceiling and ticket volume is tracked by OCWS staff and Constantine Engineering on a monthly and weekly basis, respectively. Staff estimates this additional volume of work will not exceed $60,000. The $400,000 number was budgeted in March of 2014, and staff felt that it was a conservative estimate at that time. It turns out the construction activity increased much more than we anticipated. Please note that the Period of Service on Task Order 11 Revision 1 is 10/1/2014 through 9/30/215; as such, it will include payment of all invoices for any work done in that period. OPTIONS: Approve or deny. RECOMMENDATIONS: OCWS requests BCC approval to authorize the Chairman to execute Revision 1 to Task Order 11, adding $60,000.00, for a total not to exceed fee of $460,000.00 with Constantine Engineering. RECOMMENDED BY: APPROVED BY: John Hofstad, County Administrator

Download this text file with its original spacing ↓

Citation & reuse

Okaloosa County Board of County Commissioners. “Okaloosa County BOCC — September 1, 2015 — Constantine Task Order 11 Revision 1 — agenda request.” September 1, 2015. Action Item Printout. Crypt of Echoes evidence ID LED-2026-4a2a6896fecb491eb2da089ce3ef9d37. http://127.0.0.1:58097/evidence/LED-2026-4a2a6896fecb491eb2da089ce3ef9d37. Accessed [date].

Catalogue citation: Okaloosa County Board of County Commissioners, Constantine Task Order 11 Revision 1 — agenda request, meeting materials for September 1, 2015. https://okaloosacountyfl.iqm2.com/Citizens/FileOpen.aspx?Type=30&ID=15602&MeetingID=1277

Preserved county public-record source. Third-party attachments may retain their original rights.

Technical archive record ↓