Okaloosa County BOCC — August 24, 2013 — Close-Out Documents - Contract No. C11-1849-WS0002 — reading text
Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 39-Close-Out Documents - Contract No. C11-1849-WS0002.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
NAME OF PROJECT: 2010 - 2011 Paint and Repair
Water Tanks
CONTRACTORS NAME: American Suncraft Construction Co.
ADDRESS: 10836 Schiller Road
Medway, OH 45341
PERIODIC ESTIMATE NO. : 7 For Period: 3/27/2013 To: 6/15/2013
FINAL
SUBSTANTIAL COMPLETION DATE:
FINAL COMPLETION DATE:
Poly JOB NO. 41-445
ITEM COMPLETED TOTAL COST
= EST. QTY. & UN
NO. DESCRIPTION Q IT UNIT PRICE UNITS COMPLETED
{ Furnish and install all materials and labor to paint the Northgate Tank
using OCS-4(modified) and ICS-4(modified) as described in the
specifications complete and in place for the lump sum amount of 1 LS $ 303,900.00 100% | 303,900.00
Furnish and install all materials and labor to install painted logo(fluoro-
urethane paint) on the NorthgateTank complete and in place for 1 EA $ 8,500.00 100% $ 8,500.00
Furnish-and lastall Grounding System-on Nertagate Water Tankard Deleted
agsoclesecell building-asdescribec tn tne speciicasas_complers- before
. ; 4 EA S 9700.00 award-0% $—___—_—
Furnish and install exterior leg ladder to replace existing ladder on
Northgate Water Tank as described in specifications, complete and in
place for 1 EA $ 14,600.00 100% $ 14,600.00
Furnish and install wet interior ladder to replace existing ladder on
Northgate Water Tank as described in specifications, complete and in
place for 1 EA $ 4,850.00 100% $ 4,850.00
Furnish and install stationary exterior bow! ladder to replace existing
ladder on Northgate Water Tank as described in specifications,
complete and in place for 1 EA $ 6,500.00 100% $ 6,500.00
Install 24" pressure vacuum vent ( supplied by owner) on top of
Northgate Water Tank to replace existing as described in the
specifications, complete and in place for i EA $ 1,400.00 100% $ 1,400.00
Furnish and install erection rods at top of dry riser on Northgate Water
Tankas described in the specifications, complete and in place for § EA $ 1,450.00 5 $ 7,250.00
Furnish and Install tower rods on Northgate Water Tank as described
in the specifications, complete and in place for 10 EA $ 2,280.00 10 $ 22,800.00
Furnish and install new 30in roof hatch on Northgate Water Tank as
described in the specifications, complete and in place for 1 EA $ 1,450.00 100% $ 1,450.00
Furnish and Install new 24in manway at base of Northgate Water
Tank (opposite existing) as described in the specifications, complete
and in place for 1 EA $ 5,800.00 100% $ 5,800.00
Furnish and Install new 6in diameter steel overflow pipe on Northgate
Water Tank to ground level of tank with screen and flapper valve as
described in the specifications, complete and in place for 1 EA $ 13,600.00 100% $ 13,600.00
50 LE [a 11's) 0 $ -
Remove and replace painters brackets on Northgate Water Tank
(under belly and top of legs) as described in the specifications,
complete and in place for 1 LS $ 3,250.00 100% $ 3,250.00
Paschel Tank
Furnish and install all materials and labor to paint the exterior of the
Paschel Tank using OCS-4 (modified) as described in the
specifications complete and in place for
LS
$
189,000.00
100%
189,000.00
Furnish and install all materials and labor to complete painting the
interior of the Paschel Tank using ICS-5 as described in the
specifications complete and in place for
LS
21,500.00
100%
21,500.00
7
Furnish and install all material and labor to install painted logo (
Fluoro-urethane paint) on the Paschel tank (20' diameter) complete
and in place for
EA
8,500.00
100%
8,500.00
18
Clean Main Island Water Tank (500,000 gal) in preparation for
inspection by engineer and disinfect to return to service post
inspection complete and in place for
EA
6,500.00
100%
6,500.00
19
Clean Bluewater Water Tank (300,000 gal) in preparation for
inspection by engineer and disinfect to return to service post
inspection complete and in place for
EA
5,800.00
100%
5,800.00
20
Clean 2MG Ground Storage Water Tank in preparation for inspection
by engineer and disinfect to return to service post inspection complete
and in place for
EA
7,500.00
100%
7,500.00
21
Clean Countryview Water Tank (200,000 gal) in preparation for
inspection by engineer and disinfect to return to service post
inspection complete and in place for
5,500.00
100%
5,500.00
22
Clean 1MG Ground Storage Water Tank in preparation for inspection
by engineer and disinfect to return to service post inspection complete
and in place for
EA
6,800.00
100%
6,800.00
23
Complete minor repairs to Countryview Water Tank as described in
the specifications complete and in place for
EA
5,900.00
100%
5,500.00
24
Complete minor repairs to El Matodor Water Tank as described in the
specifications complete and in place for
EA
5,500.00
100%
5,500.00
Total Cost of Original Contract Work Complete
hr
656,000.00
Change Order No. 1
EST. QTY. UNIT COMPLETED TOTAL COST
DESCRIPTION & UNIT PRICE UNITS COMPLETED
Item
‘No. Tank
5 Bluewater Tank - Install new wet
interior ladder
1 LS | $6,200 100% $ 6,200.00
26 Airport Tank - Repair notch safety rail
in dry riser 1 LS $250 100% $ 250.00
97 PaschelTank - Install notch rail on roof ‘
ladder from catwalk to roof finial 1 LS | $ 2,450.00 100% $ 2,450.00
28 Seminole Tank - Repair hinges on wet
interior roof hatch 1 LS $900 100% $ 900.00
Total Cost of Change Order #1 Work Complete $ 9,800.00
Change Order No. 2
EST. QTY. & UNIT COMPLETED TOTAL COST
UNIT PRICE UNITS COMPLETED
Item ;
No. Main Island Tank
29 = |coatof Tnemec Series 700 and install twe- Deleted in CO
newloges for the lump-sum amount of 4 ES $82,445 #3 0% $ .
South Avenue Tank
Furnish and install all materials and labor to
paint the South Avenue Tank using OCS-4
30 = |(modified) and ICS-5 as described in the
specifications complete and in place for the
lump sum amount of 1 LS $211,450 100% $ 211,450.00
Furnish and install all materials and labor to
34 install painted logo(fluoro-urethane paint) on
the South Avenue Tank complete and in
place for 2 EA $7,500 2 $ 15,000.00
39 Remove and replace exterior leg ladder,
including ladder gate 1 LS $12,200 100% $ 12,200.00
33 |Remove and replace exterior roof lader 1 LS $4,800 100% $ 4,800.00
34 Extend exterior balcony handrail to 42" to 5
meet current OSHA code 1 LS $8,700 100% $ 8,700.00
35 Modify balcony rail opening at ladder for safe
access 1 LS $1,200 100% $ 1,200.00
Remove-and replace-windage-rods-as- Deleted in CO
needed 2 EA $3,499 #6 0 $ -
; Deleted in CO
Remove and replace_riserreds as needed 2 EA $4,950 #6 0 $ -
Remove-and replace safety tie-off handles- Deleted in CO
fromieg-colmaas 4, LS $4,850 #6 0% $ -
39 |Remove existing painters clips from roof 1 LS $1,400 100% $ 1,400.00
| 40 |Remove and replace roof vent 1 LS $5,800 100% $ 5,800.00
Remove and replace existing conduit and
41 install conduit brackets at 5' spacing from
ground to roof 1 LS $3,900 100% $ 3,900.00
1) Remove and replace wet access roof hatch
with 30" hatch 1 LS $2,200 100% $ 2,200.00
43 |Remove existing target 1 LS $1,400 100% $ 1,400.00
| 44 |Remove and replace wet interior ladder { LS $4,900 100% $ 4,900.00
45 Install new manway on bottom of wet riser to 5
meet current OSHA codes 1 LS $6,000 100% $ 6,000.00
| 46 [Remove existing wet riser ladder 1 LS $900 100% $ 900.00
47
48
49
50
51
52
53
54
55
56
57
98
59
E!| Matador Tank
Furnish and install all materials and labor to
paint the El Matador Tank using OCS-4
(modified) and ICS-5 as described in the
specifications complete and in place for the
lump sum amount of
LS
$205,200
100%
$ 205,200.00
Remove and replace door and threshold
LS
$1,500
100%
$
1,500.00
Remove and replace interior dry ladder
LS
$12,350
100%
$
12,350.00
Remove and replace 1st floor landing,
including 30" access hole per current OSHA
codes
LS
$4,200
100%
$
4,200.00
Remove and replace 2nd floor landing,
including 30" access hole per current OSHA
codes
LS
$1,800
100%
1,800.00
Brace existing overflow pipe (not to exceed
10' spacing between braces)
LS
$1,100
100%
1,100.00
Remove and replace access tube hatch with
30" hatch to meet current OSHA codes
LS
$2,200
100%
2,200.00
Remove and replace interior wet access roof
hatch with 30" hatch to meet current OSHA
codes
LS
$2,200
100%
2,200.00
Remove and replace interior wet ladder
LS
$4,500
100%
4,500.00
Install brackets throughout interior dry access
for proper mounting of required conduit to
roof of tank
LS
$1,400
100%
1,400.00
Install new 4" flapper valve on existing
overflow pipe to meet current FDEP
regulations
LS
$450
100%
450.00
Furnish and install all materials and labor to
install painted logo(fluoro-urethane paint) on
the El Matador Tank complete and in place
for
EA
$7,500
7,500.00
N. Beal Ext. Tank
Clean interior of tank per FDEP
requirements, disinfect upon completion of
inspection by engineer and return to service
for the lump sum amount of
1
LS
$5,500
100%
$
5,500.00
Total Cost of Change Order #2 Work Complete
$ 529,750.00
Change Order No. 3
EST. QTY. UNIT COMPLETED TOTAL COST
DESCRIP HON & UNIT PRICE UNITS COMPLETED
Item
‘No. Tank
Power wash exterorbowloeHenl—
apply newcoat of Tnemec-Series 700-
29 ;
and install wo-new-logos for the ump Deleted in
sum-amounteH DELETED)
CO #3
LS | $52475 8% # $ :
Power wash exterior bowl of tank,
sand exterior bowl, aply one coat o
Tnemec Series 1075, apply mural
60 |using new coat of Tnemec Series 700
on entire bowl to match picture
attached for the lump sum amount of
(ADDED) LS | $173,000 100% $ 173,000.00
Total Cost of Change Order #3 Work Complete $ 173,000.00
Change Order No. 4
EST. QTY. UNIT COMPLETED TOTAL COST
DESCRIPTION & UNIT PRICE UNITS COMPLETED
Item_
No. Tank
Add additional coat of Tnemec Series
61 135 Primer to entire bowl of tank
(under new mural) to inhibit existing
pin point rust
1 LS | $13,700 100% $ 13,700.00
Power wash remainder of tank and
add additional coat of Tnemec Series
135 Primer, followed by complete
62 __Jintermediate coat of Tnemec Series
73 and complete finish coat of
Tnemec Series 700 to the entire
pedestal (all area not under mural) { LS | $11,900 400% $ 11,900.00
Total Cost of Change Order #4 Work Complete $ 25,600.00
Change Order No. 6
Item EST. QTY.& UNIT COMPLETED Total Cost
13 Seal weld various locations-on Northgate Water Tank Deleted in this
as directed by Engineer 50 $35 change order $ -
South Avenue Tank
36 |Remove-andreplacewindage reds as-needed Celsted in fhis
-2 $3,400 change order $ -
37 . Deleted in this
SERENE BE Espa ee Der (aus ae RESESS 2 $4,950 change order $ -
38 Remove anc resiace sefentic-off handles from_leg- Deleted in this
columns 4 $4850 change order $ -
el MatadertTark
Curni : ; ial .
58 painted logoffluero-urethane-paint)-on the Seuth- Cieleted! in this
Avenue Tank complete andinslace for 4 $7,500 change order $ .
Remove and replace anchor bolts covers with new
ee and paint to match existing exterior coating system
18 $200 18 $ 3,600
East Island Tank
Furnish and install all materials and labor to paint the
64 East Island Tank using OCS-4 (modified) and ICS-5
as described in the specifications complete and in
place for the lump sum amount of 1 $208,200 1 $ 208,200
Furnish and install all materials and labor to install
65 |painted logo (fluoro-urethane paint) on the East Island
Tank complete and in place for 2 $7,500 2 $ 15,000
66 __|Install new door at base of riser 1 $2,800 1 $ 2,800
67 |Increase first landing access to 30" 1 $1,800 1 $ 1,800
68 _|Increase second landing access to 30" 1 $1,800 1 $ 1,800
69 _|Install new roof hatch at exit of dry riser 1 $2,300 1 $ 2,300
70 _|Install new roof hatch into wet interior 1 $2,300 1 $ 2,300
ra Install new brackets in dry riser to properly mount
existing conduit 1 $2,200 1 $ 2,200
72 Install new 4" flapper valve on existing overflow pipe
to meet current FDEP regulations 1 $550 1 $ 550
Remove existing containment lugs from roof of tank
is and grind surface smooth prior to recoating of tank
1 $1,950 1 $ 1,950
74 |Install new 18" roof vent 1 $5,800 1 $ 5 800
Annex Tank