Okaloosa County BOCC — August 24, 2013 — Close-Out Documents - Contract No. C11-1849-WS0002 — reading text

Part 1 of 3. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 39-Close-Out Documents - Contract No. C11-1849-WS0002.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

NAME OF PROJECT: 2010 - 2011 Paint and Repair Water Tanks CONTRACTORS NAME: American Suncraft Construction Co. ADDRESS: 10836 Schiller Road Medway, OH 45341 PERIODIC ESTIMATE NO. : 7 For Period: 3/27/2013 To: 6/15/2013 FINAL SUBSTANTIAL COMPLETION DATE: FINAL COMPLETION DATE: Poly JOB NO. 41-445 ITEM COMPLETED TOTAL COST = EST. QTY. & UN NO. DESCRIPTION Q IT UNIT PRICE UNITS COMPLETED { Furnish and install all materials and labor to paint the Northgate Tank using OCS-4(modified) and ICS-4(modified) as described in the specifications complete and in place for the lump sum amount of 1 LS $ 303,900.00 100% | 303,900.00 Furnish and install all materials and labor to install painted logo(fluoro- urethane paint) on the NorthgateTank complete and in place for 1 EA $ 8,500.00 100% $ 8,500.00 Furnish-and lastall Grounding System-on Nertagate Water Tankard Deleted agsoclesecell building-asdescribec tn tne speciicasas_complers- before . ; 4 EA S 9700.00 award-0% $—___—_— Furnish and install exterior leg ladder to replace existing ladder on Northgate Water Tank as described in specifications, complete and in place for 1 EA $ 14,600.00 100% $ 14,600.00 Furnish and install wet interior ladder to replace existing ladder on Northgate Water Tank as described in specifications, complete and in place for 1 EA $ 4,850.00 100% $ 4,850.00 Furnish and install stationary exterior bow! ladder to replace existing ladder on Northgate Water Tank as described in specifications, complete and in place for 1 EA $ 6,500.00 100% $ 6,500.00 Install 24" pressure vacuum vent ( supplied by owner) on top of Northgate Water Tank to replace existing as described in the specifications, complete and in place for i EA $ 1,400.00 100% $ 1,400.00 Furnish and install erection rods at top of dry riser on Northgate Water Tankas described in the specifications, complete and in place for § EA $ 1,450.00 5 $ 7,250.00 Furnish and Install tower rods on Northgate Water Tank as described in the specifications, complete and in place for 10 EA $ 2,280.00 10 $ 22,800.00 Furnish and install new 30in roof hatch on Northgate Water Tank as described in the specifications, complete and in place for 1 EA $ 1,450.00 100% $ 1,450.00 Furnish and Install new 24in manway at base of Northgate Water Tank (opposite existing) as described in the specifications, complete and in place for 1 EA $ 5,800.00 100% $ 5,800.00 Furnish and Install new 6in diameter steel overflow pipe on Northgate Water Tank to ground level of tank with screen and flapper valve as described in the specifications, complete and in place for 1 EA $ 13,600.00 100% $ 13,600.00 50 LE [a 11's) 0 $ - Remove and replace painters brackets on Northgate Water Tank (under belly and top of legs) as described in the specifications, complete and in place for 1 LS $ 3,250.00 100% $ 3,250.00 Paschel Tank Furnish and install all materials and labor to paint the exterior of the Paschel Tank using OCS-4 (modified) as described in the specifications complete and in place for LS $ 189,000.00 100% 189,000.00 Furnish and install all materials and labor to complete painting the interior of the Paschel Tank using ICS-5 as described in the specifications complete and in place for LS 21,500.00 100% 21,500.00 7 Furnish and install all material and labor to install painted logo ( Fluoro-urethane paint) on the Paschel tank (20' diameter) complete and in place for EA 8,500.00 100% 8,500.00 18 Clean Main Island Water Tank (500,000 gal) in preparation for inspection by engineer and disinfect to return to service post inspection complete and in place for EA 6,500.00 100% 6,500.00 19 Clean Bluewater Water Tank (300,000 gal) in preparation for inspection by engineer and disinfect to return to service post inspection complete and in place for EA 5,800.00 100% 5,800.00 20 Clean 2MG Ground Storage Water Tank in preparation for inspection by engineer and disinfect to return to service post inspection complete and in place for EA 7,500.00 100% 7,500.00 21 Clean Countryview Water Tank (200,000 gal) in preparation for inspection by engineer and disinfect to return to service post inspection complete and in place for 5,500.00 100% 5,500.00 22 Clean 1MG Ground Storage Water Tank in preparation for inspection by engineer and disinfect to return to service post inspection complete and in place for EA 6,800.00 100% 6,800.00 23 Complete minor repairs to Countryview Water Tank as described in the specifications complete and in place for EA 5,900.00 100% 5,500.00 24 Complete minor repairs to El Matodor Water Tank as described in the specifications complete and in place for EA 5,500.00 100% 5,500.00 Total Cost of Original Contract Work Complete hr 656,000.00 Change Order No. 1 EST. QTY. UNIT COMPLETED TOTAL COST DESCRIPTION & UNIT PRICE UNITS COMPLETED Item ‘No. Tank 5 Bluewater Tank - Install new wet interior ladder 1 LS | $6,200 100% $ 6,200.00 26 Airport Tank - Repair notch safety rail in dry riser 1 LS $250 100% $ 250.00 97 PaschelTank - Install notch rail on roof ‘ ladder from catwalk to roof finial 1 LS | $ 2,450.00 100% $ 2,450.00 28 Seminole Tank - Repair hinges on wet interior roof hatch 1 LS $900 100% $ 900.00 Total Cost of Change Order #1 Work Complete $ 9,800.00 Change Order No. 2 EST. QTY. & UNIT COMPLETED TOTAL COST UNIT PRICE UNITS COMPLETED Item ; No. Main Island Tank 29 = |coatof Tnemec Series 700 and install twe- Deleted in CO newloges for the lump-sum amount of 4 ES $82,445 #3 0% $ . South Avenue Tank Furnish and install all materials and labor to paint the South Avenue Tank using OCS-4 30 = |(modified) and ICS-5 as described in the specifications complete and in place for the lump sum amount of 1 LS $211,450 100% $ 211,450.00 Furnish and install all materials and labor to 34 install painted logo(fluoro-urethane paint) on the South Avenue Tank complete and in place for 2 EA $7,500 2 $ 15,000.00 39 Remove and replace exterior leg ladder, including ladder gate 1 LS $12,200 100% $ 12,200.00 33 |Remove and replace exterior roof lader 1 LS $4,800 100% $ 4,800.00 34 Extend exterior balcony handrail to 42" to 5 meet current OSHA code 1 LS $8,700 100% $ 8,700.00 35 Modify balcony rail opening at ladder for safe access 1 LS $1,200 100% $ 1,200.00 Remove-and replace-windage-rods-as- Deleted in CO needed 2 EA $3,499 #6 0 $ - ; Deleted in CO Remove and replace_riserreds as needed 2 EA $4,950 #6 0 $ - Remove-and replace safety tie-off handles- Deleted in CO fromieg-colmaas 4, LS $4,850 #6 0% $ - 39 |Remove existing painters clips from roof 1 LS $1,400 100% $ 1,400.00 | 40 |Remove and replace roof vent 1 LS $5,800 100% $ 5,800.00 Remove and replace existing conduit and 41 install conduit brackets at 5' spacing from ground to roof 1 LS $3,900 100% $ 3,900.00 1) Remove and replace wet access roof hatch with 30" hatch 1 LS $2,200 100% $ 2,200.00 43 |Remove existing target 1 LS $1,400 100% $ 1,400.00 | 44 |Remove and replace wet interior ladder { LS $4,900 100% $ 4,900.00 45 Install new manway on bottom of wet riser to 5 meet current OSHA codes 1 LS $6,000 100% $ 6,000.00 | 46 [Remove existing wet riser ladder 1 LS $900 100% $ 900.00 47 48 49 50 51 52 53 54 55 56 57 98 59 E!| Matador Tank Furnish and install all materials and labor to paint the El Matador Tank using OCS-4 (modified) and ICS-5 as described in the specifications complete and in place for the lump sum amount of LS $205,200 100% $ 205,200.00 Remove and replace door and threshold LS $1,500 100% $ 1,500.00 Remove and replace interior dry ladder LS $12,350 100% $ 12,350.00 Remove and replace 1st floor landing, including 30" access hole per current OSHA codes LS $4,200 100% $ 4,200.00 Remove and replace 2nd floor landing, including 30" access hole per current OSHA codes LS $1,800 100% 1,800.00 Brace existing overflow pipe (not to exceed 10' spacing between braces) LS $1,100 100% 1,100.00 Remove and replace access tube hatch with 30" hatch to meet current OSHA codes LS $2,200 100% 2,200.00 Remove and replace interior wet access roof hatch with 30" hatch to meet current OSHA codes LS $2,200 100% 2,200.00 Remove and replace interior wet ladder LS $4,500 100% 4,500.00 Install brackets throughout interior dry access for proper mounting of required conduit to roof of tank LS $1,400 100% 1,400.00 Install new 4" flapper valve on existing overflow pipe to meet current FDEP regulations LS $450 100% 450.00 Furnish and install all materials and labor to install painted logo(fluoro-urethane paint) on the El Matador Tank complete and in place for EA $7,500 7,500.00 N. Beal Ext. Tank Clean interior of tank per FDEP requirements, disinfect upon completion of inspection by engineer and return to service for the lump sum amount of 1 LS $5,500 100% $ 5,500.00 Total Cost of Change Order #2 Work Complete $ 529,750.00 Change Order No. 3 EST. QTY. UNIT COMPLETED TOTAL COST DESCRIP HON & UNIT PRICE UNITS COMPLETED Item ‘No. Tank Power wash exterorbowloeHenl— apply newcoat of Tnemec-Series 700- 29 ; and install wo-new-logos for the ump Deleted in sum-amounteH DELETED) CO #3 LS | $52475 8% # $ : Power wash exterior bowl of tank, sand exterior bowl, aply one coat o Tnemec Series 1075, apply mural 60 |using new coat of Tnemec Series 700 on entire bowl to match picture attached for the lump sum amount of (ADDED) LS | $173,000 100% $ 173,000.00 Total Cost of Change Order #3 Work Complete $ 173,000.00 Change Order No. 4 EST. QTY. UNIT COMPLETED TOTAL COST DESCRIPTION & UNIT PRICE UNITS COMPLETED Item_ No. Tank Add additional coat of Tnemec Series 61 135 Primer to entire bowl of tank (under new mural) to inhibit existing pin point rust 1 LS | $13,700 100% $ 13,700.00 Power wash remainder of tank and add additional coat of Tnemec Series 135 Primer, followed by complete 62 __Jintermediate coat of Tnemec Series 73 and complete finish coat of Tnemec Series 700 to the entire pedestal (all area not under mural) { LS | $11,900 400% $ 11,900.00 Total Cost of Change Order #4 Work Complete $ 25,600.00 Change Order No. 6 Item EST. QTY.& UNIT COMPLETED Total Cost 13 Seal weld various locations-on Northgate Water Tank Deleted in this as directed by Engineer 50 $35 change order $ - South Avenue Tank 36 |Remove-andreplacewindage reds as-needed Celsted in fhis -2 $3,400 change order $ - 37 . Deleted in this SERENE BE Espa ee Der (aus ae RESESS 2 $4,950 change order $ - 38 Remove anc resiace sefentic-off handles from_leg- Deleted in this columns 4 $4850 change order $ - el MatadertTark Curni : ; ial . 58 painted logoffluero-urethane-paint)-on the Seuth- Cieleted! in this Avenue Tank complete andinslace for 4 $7,500 change order $ . Remove and replace anchor bolts covers with new ee and paint to match existing exterior coating system 18 $200 18 $ 3,600 East Island Tank Furnish and install all materials and labor to paint the 64 East Island Tank using OCS-4 (modified) and ICS-5 as described in the specifications complete and in place for the lump sum amount of 1 $208,200 1 $ 208,200 Furnish and install all materials and labor to install 65 |painted logo (fluoro-urethane paint) on the East Island Tank complete and in place for 2 $7,500 2 $ 15,000 66 __|Install new door at base of riser 1 $2,800 1 $ 2,800 67 |Increase first landing access to 30" 1 $1,800 1 $ 1,800 68 _|Increase second landing access to 30" 1 $1,800 1 $ 1,800 69 _|Install new roof hatch at exit of dry riser 1 $2,300 1 $ 2,300 70 _|Install new roof hatch into wet interior 1 $2,300 1 $ 2,300 ra Install new brackets in dry riser to properly mount existing conduit 1 $2,200 1 $ 2,200 72 Install new 4" flapper valve on existing overflow pipe to meet current FDEP regulations 1 $550 1 $ 550 Remove existing containment lugs from roof of tank is and grind surface smooth prior to recoating of tank 1 $1,950 1 $ 1,950 74 |Install new 18" roof vent 1 $5,800 1 $ 5 800 Annex Tank