Okaloosa County BOCC — August 24, 2013 — Task Order No. 23 and Internal Coord. Sheet for Construction Phase Services_West Hangar Public Parking at CEW — reading text
Part 1 of 2. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 16-Task Order No. 23 and Internal Coord. Sheet for Construction Phase Services_West Hangar Public Parking at CEW.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
CONTRACT & LEASE INTERNAL COORDINATION SHEET
Contract/Lease Number: C08-1683-AP Tracking Number: wlh
Contractor/Lessee Name: AVCON, INC. Grant Funded: YES_X_NO_.
Purpose: Task orden oe onstruction Phase Services for West Hangar Public Parking Project
Date/Term: 1. IX] GREATER THAN $50,000
Amount: $139,070.00 2. (.] GREATER THAN $25,000
Department: Bob Sikes CEW 3. [1] $25,000 OR LESS
Dept. Monitor Name: Sunil Harman
Document has been reviewed and includes any attachments or exhibits.
Purchasing Review
U trequirgments are met: vy
wa Date: / 7
| Putéhasing Director or designee
Risk Management Review
Date:
Risk Manager or designee _
nty Attorney Review
Approved as written:
Date:
Counly Atiorney
Following Okaloosa County approval:
Contract & Grant
Document has been received:
Date:
Contracts & Grants Manager
TASK ORDER APPROVAL FORM
CONTRACT #: CO8-1683-AP3
TASK ORDER #:__ 2 J
TASK ORDER AMOUNT: _$139,070.00
OFFERED BY CONSULTANT:
AVCON INC.
FIRM'S NAME
Virgil C. “Lee” Lewis, P.E.
REPRESENTATIVE’S PRINTE ME
SIGNATURE
Regional Manager July 22, 2013
TITLE DATE
RECOMMENDED FOR APPROVAL
(Department Director)
ff
tie
TITLE
B-\-
DATE
COUNTY ADMINISTRATOR (if applicable)
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
e $25,000 or less approved by Purchasing
Director
e Between $25,001 and $50,000 approved by
Purchasing Director and County
Administrator
e In excess of $50,000 approved by the Board.
PURCHASING DIRECTOR
DATE
CHAIRMAN (if applicable)
DATE
TASK ORDER
Construction Phase Services for
West Hangar Area Public Parking Project
Bob Sikes Airport, Crestview, Florida
July 22, 2013
Task Order No. 44
AVCON Project No. 2013.050.02
AVCON, INC., a Florida Corporation (hereinafter “CONSULTANT”) agrees to perform and
complete the following services (hereinafter “Services”) for Okaloosa County Board of County
Commissioners (hereinafter ““CLIENT”), in accordance with the terms and conditions of the
Agreement for Professional Architectural, Engineering, and Aviation Planning Services (Contract
No.: C08-1683-AP3-152), dated September 16, 2008, all of which terms and conditions are
incorporated herein by reference.
1. Task Location: Okaloosa County Airports—Okaloosa County, Florida
2. Task Name: Construction Phase Services for West Hangar Area Public Parking
Project at Bob Sikes Airport.
3. Task Description/Scope of Services; CONSULTANT shall perform professional construction
administration services and inspection services specified in Exhibit A attached
hereto. Construction administration services shall constitute Task B-1.
Construction inspection and subconsultant services—including but not limited to
construction inspection, surveying, aerial photography, and material acceptance
testing—shall constitute Task B-2.
4. Compensation: All construction administration work performed under Task B-1 and
construction inspection and subconsultant services—including surveying, aerial
photography, and material acceptance testing— performed under Task B-2 shall be
compensated for on a Lump Sum basis. The Lump Sum fee shall be One-Hundred
Thirty-Nine Thousand, Seventy and 00/100 dollars ($139,070.00) and shall
include all costs and charges required to perform the work specified. Progress
payments shall be made monthly and shall be by an estimate of the percent
complete in accordance with the project progress.
The fees are based on construction being completed within 240 calendar days of
the Contractor’s NTP for construction. If construction extends beyond this time,
the fees will increase by a rate based on the average monthly cost.
5. Schedule: Construction administration and inspection services shall be performed in
accordance with the construction schedules established by the County.
Task Order No. ___ — Construction Phase Services for WHA Public Parking Project Page | of 2
6. Deliverables: Deliverables shall include those specified in Section C on Exhibit A attached
hereto.
7. Other Considerations: Services of the CONSULTANT shall be under the direction of Mr.
Tracy Stage, A.A.E. of Okaloosa County Airports.
Accepted by:
CLIENT:
1.
CONSULTANT shall not supervise, direct, or have control over the
Contractor’s work nor shall have authority over or responsibility for the means,
methods, techniques, sequences, or procedures of construction selected by the
Contractor, for safety precautions and programs indicate to the work of the
Contractor, or for any failure of the Contractor to comply with laws, rules,
regulations, ordinances, codes or orders applicable to the Contractor furnishing
and performing their work. No reimbursement shall be provided for travel-
related costs.
All applicable permitting and impact fees shall be provided by the Owner.
The hours budgeted for Tasks B-1 and B-2 are based on a construction
schedule (from Notice-to-Proceed to final completion) of 240 days (35
weeks). If construction extends beyond this time, the fees shall increase by a
rate based on the average monthly cost.
This task order shall not include construction administration or inspection
services for the adjacent ECA Terminal (Schedule C) or associated site work
(Schedule B).
CONSULTANT:
Okaloosa County Board of AVCON, INC.
County Commissioners
By:
Printed Name:
Title:
fo
Printed Name: _ Virgil C. “Lee” Lewis, P.E.
Title: Regional Manager
Date:
Task Order No. ___ — Construction Phase Services for WHA Public Parking Project Page 2 of 2
EXHIBIT “A”
SCOPE OF SERVICES - AVCON, INC.
Construction Phase Services for
West Hangar Area Public Parking Project
Bob Sikes Airport, Crestview, Florida
July 22, 2013
SECTION A: PURPOSE
The purpose of this scope of work is to provide construction administration and inspection services for the
work included in Schedule A for the West Hangar Area Parking Lot project at Bob Sikes Airport. This project
generally consists of a parking lot with 65 parking spaces, aircraft apron drainage modifications, security
fencing improvements, removal of existing septic tanks, stormwater and utility improvements, and parking lot
lighting. The scope is divided into two tasks:
Task B-1—Construction Administration Services (Lump Sum)
Task B-2—Inspection, Material Testing, and Subconsultant Services (Lump Sum)
The construction work is anticipated to extend for a period of 240 calendar days from contractor NTP to final
completion.
SECTION B: DESCRIPTION OF TASKS
The following elements describe the individual services to be provided as part of this work effort.
Task B-1: Construction Administration Services (Lump Sum): This task shall include construction
administration services for the work included in Schedule A of the Release for Construction documents.
1. Coordinate with Owner and Contractor During Construction: AVCON shall provide routine
updates and coordination with Owner and Contractor throughout construction.
2. Update 100% Design Drawings from February 2012: AVCON shall review and update the 100%
design drawings prepared in February 2012 with the new limits of construction, additional work items,
and revised existing site conditions. A new QA/QC review shall be performed on these drawings and
an updated set of 100% design drawings shall be provided to the County.
3. Update Bid Manual from February 2012: AVCON shall review and update the Bid Manual
prepared in February 2012 with the new Bid Schedule to include the ECA Terminal, quantities, and
ECA terminal technical specifications provided by others. A new QA/QC review shall be performed
for the Bid Manual and an updated Bid Manual shall be provided to the County.
4. Prepare On-Airport FAA Form 7460: AVCON shall prepare and submit to the FAA an On-Airport
Form 7460 Airspace Study, Notice of Proposed Construction or Alteration, for the proposed parking
lot improvements.
5. Prepare Conformed Construction Documents: AVCON shall prepare and submit conformed plans
and specifications that incorporate addendums to serve as the “Release for Construction” set. A total
of five (5) sets of conformed documents shall be provided to the Owner.
EXHIBIT “A”: SCOPE OF SERVICES - AVCON, INC.
Construction Phase Services for West Hangar Area Public Parking Project
July 22, 2013
6.
10.
11.
12.
13.
14.
Participate in Pre-Award Meeting, Prepare Minutes: AVCON shall coordinate and participate in
a Pre-Award meeting with the County and the apparent low bidder and review the contractor’s bid and
discuss any issues prior to the County making a formal project award. The work shall include
preparation and distribution of meeting minutes from the meeting.
Coordinate Electrical Infrastructure Improvements with Gulf Power: AVCON shall coordinate
electrical infrastructure improvements with Gulf Power and shall coordinate timely construction of the
work.
Coordinate Gulf Power Electrical Easement Survey: AVCON shall coordinate an electrical
easement survey for the Gulf Power electrical improvements. This survey shall be performed by a
qualified surveying subconsultant.
Participate in Pre-Construction Conference; Prepare Minutes: AVCON shall coordinate and
participate in a Pre-Construction Conference to present and discuss specific project issues, specific
construction features, operational phasing, special airfield construction limitations, and other
applicable requirements. The work shall include responding to questions related to AVCON design
features.
Participate in Five (5) On-Site Visits to Review Work: AVCON shall participate in up to five (5)
site visits during construction to observe progress of work. Site visit shall assume two (2) three-hour
visits by Principal and five (5) three-hour visits by Project Manager. Visits shall be intended to enable
observations of the progress to ensure that construction is generally consistent with the design
objectives and with applicable safety and security requirements and to coordinate questions in the
field.
Participate in Thirty-Five (35) Weekly Update Meetings: AVCON shall participate in up to thirty-
five (35) weekly update meetings conducted by the contractor during construction to coordinate day-
to-day issues, address project concerns, and to review scheduled work. Task shall include preparation
of meeting notes from each meeting and shall assume eight (8) meetings at three (3) hours per meeting
by the senior project manager and thirty-five (35) meetings at three (3) hours per meeting by the
Project Manager.
Provide Monthly Update Report: AVCON shall prepare and submit to County on a monthly basis
three (3) copies of a bound project update report that summarizes the progress of the work and
provides photos to clarify the progress.
Review Contractor Shop Drawings: AVCON shall review shop drawings as submitted by the
Contractor and shall evaluate compliance with respect to contract requirements. An owner-specified
review period (approximately two weeks) shall be specified in the project documents for shop drawing
review and response from receipt of the respective shop drawing.
Review Contractor Pay Applications: AVCON shall review pay requests as submitted by the
Contractor on a monthly basis to review and evaluate the requested values versus the actual work
completed and accepted for the payment period. The task shall include review of the work completed
in conjunction with the Construction Inspector and certification by the Inspector and the Project
Manager that the pay application reflects the work performed and stored materials accepted.
EXHIBIT “A”: SCOPE OF SERVICES - AVCON, INC.
Construction Phase Services for West Hangar Area Public Parking Project
July 22, 2013
15.
16.
17.
18.
19.
20.
21.
22.
Coordinate JPA/AIP Grant Eligibility and Reimbursement: AVCON shall prepare a summary of
funding eligibility and recommended reimbursement based on copies of grants provided by County.
Task shall include a summary of anticipated funding prior to construction and updates on a monthly
basis. A summary of eligibility and