READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 7, 2014 — Resolution and SJPA for Regional Boarding Ramps and Passenger Loading Bridges — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 113-Resolution and SJPA for Regional Boarding Ramps and Passenger Loading Bridges.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
RESOLUTION 14-
A RESOLUTION OF THE BOARD OF COUNTY
COMMISSIONERS; APPROVING THE — FIRST
SUPPPLEMENTAL JOINT PARTICIPATION
AGREEMENT TO CONTRACT NO. AREI5
RENAMING THE PROJECT TO PROVIDE FOR
REPLACING TWO REGIONAL BOARDING
RAMPS WITH TWO PASSENGER LOADING
BRIDGES AND INCLUDING THE FEDERAL
SHARE OF THE PROJECT FUNDING.
WHEREAS, the County previously entered into a Joint Participation Agreement
(ARE15) with the Florida Department of Transportation to Overlay Aircraft Parking Apron at
Bob Sikes Airport, and
WHEREAS, the County has determined that a higher priority project to Replace Two
Regional Boarding Ramps with Two Passenger Loading Bridges at Northwest Florida Regional
Airport should be funded therewith;
NOW THEREFORE, be it resolved by the Board of County Commissioners of Okaloosa
County as follows:
1. The Board approves the SUPPLEMENTAL AGREEMENT NO. ONE, a copy of which
is attached hereto as Exhibit “A”.
2, The Chairman is authorized to execute the Agreement on behalf of the Board.
DULY ADOPTED THIS 7" day of October, 2014.
BOARD OF COUNTY COMMISSIONERS OF
OKALOOSA COUNTY, FLORIDA
Charles K. Windes, Jr.
Chairman
ATTEST:
CLERK OF THE CIRCUIT COURT
OKALOOSA COUNTY, FLORIDA
Gary J. Stanford
Deputy Clerk
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 725-030-07
PUBLIC TRANSPORTATION PUBLIC TRANSPORTATION
SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT Page 1 of 4
Number ONE
Financial Project No.: Fund: 010 FLAIR Category: 088719
42561719401 Function: 637 Object Code: 750004
(item-segment-phase-sequence) Federal No.. N/A Org. Code: 55032020329
Contract No.: ARE15 DUNS No.: 61-327-7649 Vendor No.: F596000765015
Catalog of Federal Domestic Assistance Number: N/A Catalog of State Financial Assistance Number: 55004
THIS AGREEMENT, made and entered into this day of ; ;
by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida,
hereinafter referred to as the Department, and Okaloosa County Board of County Commissioners
1804 Lewis Turner Blvd., Suite 206, Ft Walton Beach, Florida 32547
hereinafter referred to as Agency.
WITNESSETH:
WHEREAS, the Department and the Agency heretofore on the 24th day of April ,2014 ,
entered into a Joint Participation Agreement; and
WHEREAS, the Agency desires to accomplish certain project items as outlined in the Attachment "A" appended
hereto; and
WHEREAS, the Department desires to participate in all eligible items for this project as outlined in Attachment
"A" for a total Department Share of $97,500.00
NOW, THEREFORE THIS INDENTURE WITNESSETH: that for and in consideration of the mutual benefits to flow
from each to the other, the parties hereto agree that the above described Joint Participation Agreement is to be amended
and supplemented as follows:
1.00 Project Description: The project description is amended
to Replace Two Regional Boarding Ramps with Two Passenger Loading Bridges at Northwest Florida Regional Airport.
725-030-07
PUBLIC TRANSPORTATION
06/11
Page 2 of 4
2.00 Project Cost:
Paragraph 3.00 of said Agreement is increased by $1,805,046.00
bringing the revised total cost of the project to $1,926,921.00
Paragraph 4.00 of said Agreement is decreased by $0.00
bringing the Department's revised total cost of the project to $97,500.00
3.00 Amended Exhibits:
Exhibit(s) B of said Agreement is amended by Attachment "A".
4.00 Contract Time:
Paragraph 18.00 of said Agreement June 30,2017
5.00 E-Verify
Vendors/Contractors:
1. shall utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment eligibility
of all new employees hired by the Vendor/Contractor during the term of the contract; and
2. shall expressly require any subcontractors performing work or providing services pursuant to the state contract
to likewise utilize the U.S. Department of Homeland Security's E-Verify system to verify the employment
eligibility of all new employees hired by the subcontractor during the contract term.
Except as hereby modified, amended or changed, all other terms of sald Agreement dated April
725-030-07
PUBLIC TRANSPORTATION
06/11
Page 3 of 4
Financial Project No. 42561719401
ContractNo. ARE15
Agreement Date
24th 2014
and any subsequent supplements shall remain in full force and effect.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed, the day and year first
above written.
AGENCY
Okaloosa County Board of County Commissioners
AGENCY NAME
Charles K. Windes, Jr.
SIGNATORY (PRINTED OR TYPED)
SIGNATURE
Chairman
TITLE
FDOT
See attached Encumbrance Form for date of Funding
Approval by Comptroller
LEGAL REVIEW :
DEPARTMENT OF TRANSPORTATION
Jason Peters, P.E.
DEPARTMENT OF TRANSPORTATION
Director of Transportation Development D-3
TITLE
Financial Project No.
ContractNo. ARE15
725-030-07
PUBLIC TRANSPORTATION
42561719401
06/11
Page 4 of 4
Agreement Date
ATTACHMENT "A"
SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT
This Attachment forms an integral part of that certain Supplemental Joint Participation Agreement between
the State of Florida, Department of Transportation and Okaloosa County Board of County Commissioners
_ 1804 Lewis Turner Blvd., Suite 206, Ft Walton Beach, Florida 32547
dated
DESCRIPTION OF SUPPLEMENT (Include justification for cost change):
No DOT cost change. Amending description to Replace Two Regional Boarding Ramps with Two Passenger Loading
Bridges (PLB) at Northwest Florida Regional Airport.
These PLBs are to replace inadequate, unsupportable and unsafe ground level boarding ramps. Project also includes
ground power units and pre-conditioned air units. The PLBs will accommodate regional jets, narrow body jets and a
small percentage of turboprop aircraft.
Project Cost:
Total Project Cost
I. Fund Participation:
Department:
Agency:
FAA
Total Project Cost
As Approved
$121,875.00
$121,875.00
As Approved
$97,500.00
$24,375.00
$0.00
$121,875.00
As Amended
$1,926,921 .00
$1,926,921.00
As Amended
$97,500.00
$97,500.00
$1,731,921.00
$1,926,921 .00
Net Change
$1,805,046.00
$1,805,046.00
Net Change
$0.00
$73,125.00
$1,731 ,921.00
$1,805,046.00
Comments:
FAA Funding Direct to Airport
