READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — October 13, 2015 — Agenda Packet — reading text
Part 4 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Agenda Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
the current Engineering, Aerospace, and
Science Department’s capabilities to produce workforce and
college ready through the upgrade of programs while building
community partnerships
∗ Increasing and upgrading program assets with the grant will
allow for the increased participation in various programs,
leading to increased opportunities to earn college credit and
industry certifications while at CHS
Packet Pg. 36
16
Okaloosa Lane Bridge Conversion
∗ Amount Requested: $90,000
∗ Proposer: Okaloosa County Board of Commissioners
∗ Project Summary:
∗ Okaloosa Lane (between Aplin Rd and Serenity Dr) is a dirt roadway with
significant relief; two culverts serve as a creek crossing. Heavy rainfall
commonly overwhelms the culverts and causes damage to the roadway
(usually resulting in closures) and sediment deposit into the creek
∗ The County's current capital improvement plan has $1.5M to make
improvements to this segment of Okaloosa Lane; project scope includes
acquisition of right of way to accommodate sidewalks (for school
access), paving the roadway, and a stormwater management system
∗ In conjunction with this work, County forces will replace the existing
culverts in favor of a new, single-span, concrete bridge; permits have
been obtained from the NWFWMD and the Army Corps of Engineers
∗ Installation of the single span bridge will allow the existing creek to be
reestablished to conditions similar to what would exist if the culverts had
never been placed there
Packet Pg. 37
17
Preservation Trail
∗ Amount Requested: $90,000
∗ Proposer: Ruckel Properties (partnering with City of Niceville)
∗ Project Summary:
∗ The Preservation Trail (Phases 1 & 2) is the first 1.6 mile section of a trail
system that will be built in phases in conjunction with the development of
approx. 1,100 acres
∗ The trail system will provide healthy, recreational, and educational activities
in the natural setting of a native Xeric Hammock forest area within the
Niceville city limits
∗ The trail system will include exercise stops, flora and fauna educational
information, and peaceful vistas; the general public will be able to experience
nature whether walking, jogging, biking, pushing a stroller or by wheel chair
∗ Project cost is $343,000 ($90,000 direct component funds and $253,000
developer funds) for clearing, grading, paving, wayfinding/signage, benches,
art, etc. Continuing maintenance will be partnership w/ City of Niceville
∗ The project does not have any risks to implementation and will provide short
term jobs for construction and landscape workers
∗ The trail system amenity will draw retail tenants and other businesses to
planned town center and commercial/light industrial area, thereby creating
jobs
Packet Pg. 38
Environmental/Ecological 18
Science Fair Projects
∗ Amount Requested: $36,862
∗ Proposer: Northwood Art and Science Academy Team
∗ Project Summary:
∗ Northwood Arts and Science Academy is seeking to expand the current
science curriculum by means of a school-wide, ongoing science fair
project focusing on the environment and ecology. This real-life project
enables teachers to better prepare and motivate students to pursue
careers in science, technology, engineering and mathematics (STEM
subjects)
∗ With proper funding, students will be able to conduct studies involving:
growing food; composting; adverse situations that threaten our local
aquatic life; inorganic waste management; hydroponics; our fragile
ecosystem
∗ Grant will impact entire student body in a School-Wide Science Fair, thus
motivating and involving students from Kindergarten through 5th grade
∗ Project expenditures will include the following: digital cameras;
experiment-specific materials; science kits; hydroponic/greenhouse
system; professional development via NSTA virtual conference;
participation award kits; and recognition certificates
Packet Pg. 39
19
Bringing Up the Trades
∗ Amount Requested: $67,321
∗ Proposer: Baker School
∗ Project Summary:
∗ The requested funding is to purchase materials required for a basic construction
course for the foundation of the NCCER program. The supplies consumed
annually are purchased through the Carl Perkins Vocational Grant
∗ Funds will be used for: general shop tool locker with tools; building trades tool
locker with tools; woodworking tool locker with tools; station workbenches;
simulators from RealityWorks; and steel stools
∗ Specific Objectives: 1. To focus on a clear curriculum aimed at achieving the goal
of foundational math skills for all students. 2. To meet the needs of construction
and safety at the middle school level with the concepts taught in an application
method. 3. To incorporate the relationship of math and tools application. 4. To
create and conceptualize designs for production. 5. To increase the analytical
component required for construction 6. To develop communication skills and
leadership of a superintendent role in teamwork to reach a common goal
∗ The topics are the foundational necessities to succeed in the high school career
academies that lead to high wage, high demand occupations in our region as well
as the State of Florida. This course will set the foundation of the math standards
required for construction.
Packet Pg. 40
Way Ahead
∗ Finalize integrated project list
∗ Submit draft MYIP to BCC
∗ BCC approves draft MYIP; start 45-day comment period
∗ BCC submits final MYIP to Treasury for approval
∗ Treasury approves MYIP; applicants complete Part C
Packet Pg. 41
