READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — January 7, 2014 — reading text
Part 4 of 37. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
elevate tops of wet wells,
Hurricane & Tropical
valve boxes, relocation of
Flood Proofing Lift Storm; Flood; Land City of Valparaiso - Water & Sewer City of
10 2010 emergency power supplies, yes City of Valparaiso City of Valparaiso $600,000.00 X No Funding 3 months Existing Y 39
Stations Erosion; Severe Storms; Dept. Valparaiso
and storm hardening
and Beach Erosion
controls. To include
bulkheads and/or retaining
walls
E-1 Packet Pg. 71
Okaloosa County
2011 LMS
Appendex E
YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP
PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY
SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE
NEW COMPLETED DELETED DEFERRED Points
Restoration of Restoration of wetlands in
Hurricane & Tropical
wetlands in Glenwood Glenwood Park and Town of Cinco Town of Cinco
11 2010 Storm: Flood; Storm yes Town of Cinco Bayou Town of Cinco Bayou - Public Works $15,000.00 X No Funding 1 year Existing Y 39
Park and upgrade the upgrade the park's drainage Bayou Bayou
Surge
drainage system system
Sewer pump Station Location is unstable and
12 13 protective 2010 susceptible to erosion and Land Erosion yes City of Niceville City of Niceville City of Niceville - Water & Sewer Dept. $ 10,000.00 X No Funding 90 days Existing City of Niceville Y 37
measures washing.
The Coleman Lake outfall
runs under Main Street in
the City of Destin through a
structurally deficient earthen
Dam Safety; Hurricane &
Dunes of Destin Lake dam. Based on increasing
13 2010 Tropical Storm; Flood; yes City of Destin City of Destin City of Destin - Public Works $600,000.00 X 3 months Existing City of Destin Y 36
Drainage Project frequency and depths of
and Severe Storms
potholes at the outfall
location, it is eveident that
the structure is leaking and
could lead to failure
Hurricane and Tropical
Culvert is to small to
14 85-A Culvert Crossing 1999 Storm; Flood; and yes City of Laurel Hill City of Laurel Hill City of Laurel Hill - Public Works Dept. $30,000.00 X No Funding 120 days Existing City of Laurel Hill Y 36
accommodate stormwater
Severe Storms
There are several
properties, including
concrete masonry unit
houses built with slab on
grade, which flood during
Repetitive Loss Flood; Hurricane & Existing Building
storm events. Due to this City of Fort Walton City of Fort Walton City of Fort
15 Relocation and/or 1999 Tropical Storm; Severe Mitigation in Flood- City of Fort Walton Beach $2,000,000.00 + X No Funding 18 months Existing Y 35
type of construction, Beach Beach Walton Beach
Acquisition Storms and Storm Surge prone locations
elevation is not an
alternative. The structures
should be relocated or
acquired by the City to
prevent future losses.
Installation of new high
efficency .2 million
High efficiency .2 gallon/day lift station. Flood; Hurricane &
City of
16 million gal/day lift at 2011 Current lift at ation handles Tropical Storm; Severe yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $700,000.00 X No Funding 1 year Existing Y 34
Valparaiso
ation 50% of all sewage, is Storms and Storm Surge
located in the flood zone,
and is obsolete
Hurricane & Tropical