Okaloosa County BOCC — February 11, 2013 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 97-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: April 16, 2013 TO: Honorable Chairman and Members of the Board FROM: Jeff Littrell SUBJECT: Gator Boring Task Order 61 DEPARTMENT: Water and Sewer BCC DISTRICT: Four STATEMENT OF ISSUE: OCWS has requested the services of Gator Boring under Task Order #61 per the terms of Contract #C05-1117-WS for a total cost of $128,306.15. Task Order #61 is attached for your review. BACKGROUND: OCWS has a 16" water main on the south side of Highway 98 near Hurlburt Field. FDOT is planning to build a new interchange (FDOT project # 415067-2-52-01) at the entrance to Hurlburt (Cody Avenue). As you are aware, this Cody Avenue Interchange is being fast-tracked by the state. In our early stage plan review and coordination with FDOT no utility conflicts with our 16" water main were identified. A few months ago, the design was changed to extend the turn lanes. This then created a conflict with the drainage scheme, resulting in a 1,015 LF portion of the water main that will have to be relocated. The water main will need to be significantly lower in its present location. A new 20" diameter directional bore is needed to relocate the water main - see attached aerial photo, which depicts the approximate location of the proposed bore. The roadway construction is scheduled to start in July, and FDOT has requested that all utilities be completed with relocations by then. OCWS currently has $75,000 in the FY2013 budget for FDOT relocation projects. This Task Order is the largest component of this relocation project, but there are other costs to be accounted for, such as: engineering, permitting, material/labor/equipment for the connections, concrete encasement, etc. This total project could cost up to $300,000. Whatever is spent above $75,000 will come out of OCWS reserves, which are adequate to fund this project. OPTIONS: Approve or deny. RECOMMENDATIONS: OCWS requests BCC approval to authorize the Chairman to execute Gator Boring Task Order 61, for a not to exceed amount of $128,306.15. RECOMMENDED BY: APPROVED BY: James D. Curry, County Administrator

Download this text file with its original spacing ↓