READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — August 11, 2015 — Agenda Packet — reading text
Part 5 of 19. These parts divide the reading text for browsing; they are not the source document's page numbers.
Agenda Packet — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
providing sanitary sewers for wastewater collection (lift
stations), treatment plants, and effluent disposal. Provide seamless addition of new sewer customers. Repair and
maintain 150 sewage lift stations, 3 water reclamation facilities (WRFs) and all other portions of the
infrastructure. Maintain the highest standard as it relates to all facets of the customer service function including
new service set up, billing and collections. Insure strict compliance with ALL Federal and State requirements
through compliance sample testing and constant monitoring.
Packet Pg. 44
KEY OBJECTIVES:
1. Ensure budgetary, personnel, customer service and purchasing functions comply with County policies and
procedures.
2. Preserve and protect infrastructure to provide quality of service to customers.
3. Maintain and extend the useful life and utility of County facilities.
4. Ensure the preservation and safe operation of all work related equipment.
5. Provide adequate collection lines and treatment facilities to provide capacity for 85 GPD per capita.
6. Meet or exceed State and Federal wastewater treatment standards
7. Protect ground and surface waters through provision of consistent high quality wastewater treatment.
8. Continue to ensure maximum efficiencies by utilizing the best operating practices.
The following projects are planned for FY2016:
Ø Arbennie Pritchett WRF Expansion (design-build construction) – Expand the current facility from 10
million gallons per day (MGD) to 15 MGD because of additional flow from Eglin AFB projects, the East
County Service Area (diversion project mentioned above), and future growth. Project will be funded with
Capacity Expansion Charges that have been received from some of these listed projects and other land
development projects.
Ø Bob Sikes WRF – Install membranes from storage into additional train. Only one train has membranes
installed. Need other membranes installed and new train online to do repairs/maintenance on existing train.
Ø Diversion of East County wastewater from the Niceville-Valparaiso Regional Sewer Board Plant to the
Arbennie Pritchett Water Reclamation Facility (APWRF) (construction) – construct a new force main and
pump station to divert OCWS sewer flow from NVRSB to the Arbennie Pritchett WRF. This will
consolidate flows and reduce overall wastewater treatment cost for the flows from our East County service
area. Project will also eliminate Rocky Bayou Lift Station, Post Office Lift Station, and miles of 14” aging,
sewer force main.
Packet Pg. 45
PERFORMANCE MEASURES:
Actual Estimated Adopted
Performance Measures
FY13/14 FY14/15 FY15/16
Total Wastewater treated (millions of gallons) 2,840.1 2,850.0
2,950.0
Input
Total number of trouble call outs 1,368 1,500 1,700
Dry Tons of Sludge Hauled 1,441.4 1,455.0 1,500.0
Output
Total number of pumps pulled 62 64 66
Total number of wastewater operators (3 plants) 12 12 13
Efficiency
Cost per gallon of wastewater treated 0.0053 0.0053 0.0051
Total square miles of service area 27.6 42 42.1
Effectiveness
Total Public Access reuse water (millions of gals.) 102.4 115.4 116
Interdepartmental project support (Airport, Road ) 16 10 12
Packet Pg. 46
BOARD OF COUNTY COMMISSIONERS
OKALOOSA COUNTY, FLORIDA
SERVICE AREA: PHYSICAL ENVIRONMENT
DEPARTMENT/PROGRAM: WATER & SEWER ENTERPRISE FUND/ENGINEERING
PROGRAM DESCRIPTION: To provide service to the department and public in the area of engineering
services for design, inspection, development review and acceptance, and to offer assistance to the public and
staff relating to information regarding the operation of Okaloosa County Water & Sewer.
REVENUE: The Water & Sewer enterprise fund receives all revenue through monthly customer billings,
capacity expansion charges and related ancillary charges for use of both the Water and Sewer systems within
the Okaloosa County service area. The funds customer base is currently in excess of 37,000 water service and
34,000 sewer service connections both residential and commercial.
MAJOR ACCOMPLISHMENTS LAST YEAR:
Provided engineering, surveying, permitting, inspection, and project management services for the following:
Ø Camp Rudder Force Main & Lift Station (design) – provide sewer service to Camp Rudder via 1 master lift
station and approximately 8.6 miles of piping. This project will divert all wastewater flows from Camp
Rudder to the Arbennie Pritchett WRF.
Ø Del Cerro II Well (construction) – install new potable water well in the Mid-County area to increase potable
water supply and reliability of the system.
Ø Diversion of East County wastewater from the Niceville-Valparaiso Regional Sewer Board Plant to the
Arbennie Pritchett Water Reclamation Facility (APWRF) (design) – construct a new force main and pump
station to divert OCWS sewer flow from NVRSB to the APWRF. This will consolidate flows and reduce
overall wastewater treatment cost for the flows from our East County Service Area (Bluewater Bay area).
Project will also eliminate Rocky Bayou Lift Station, Post Office Lift Station, and miles of 14” aging, sewer
force main. The pump station is under construction, and design of force main is underway.
Ø Eglin Main Force Mains & Lift Stations (construction) – provide sewer service to Eglin Main Base via 2 lift
stations “inside the fence” and approximately 7 miles of piping. This project diverted all wastewater flows
from Eglin proper to the APWRF.
Ø Future Water Supply (planning) – continue with Implementation Plan to ensure the sustainability of a safe,
reliable, and adequate water supply in the future, with efforts focused along the Shoal River for an offline
reservoir. Partnered with the U.S. Army Corps of Engineers and completed a system-wide hydraulic and
water quality model. Completed Shoal River Buffer Land Acquisition – 961 acres of land for watershed
protection and military buffering.
Ø GIS/Mapping - additional subsurface utility engineering was completed in the Garniers Service Area
(unincorporated Fort Walton Beach), specifically portions of the gravity sewer collection system.
Ø Garniers Area Sanitary Sewer Rehab (construction) – install cured-in-place liners on vitrified clay sewer
mains and brick manholes to reduce the inflow and infiltration, which is currently inundating the wastewater
collection system.
Ø Marlowe Area Water System Improvements (design) – provide new, larger water mains to the area and fire
hydrants to provide increased fire protection and ensure the reliability of the system.
Ø Mid County Tank #4 (land acquisition) – a second elevated water tank near the Bob Sikes Industrial Park
would provide for increased storage, reliability, and redundancy for the potable water and fire suppression
systems. This project is partially funded by a Northwest Florida Water Management District grant.
Approximately 1.1 acres of land was acquired for the tank and associated infrastructure.
Packet Pg. 47
Ø Newcastle Area Water System Improvements (construction) – provide new, larger water mains to the area
and fire hydrants to provide increased fire protection and ensure the reliability of the system. This project is
partially funded by a Florida Department of Economic Opportunity Community Development Block Grant.
Ø Poquito Bayou Water Main & Force Main Bores (design) – replace the aging, deteriorated mains under
Poquito Bayou with new directional bores.
PROGRAM GOAL When land development projects are submitted, complete the review and issue comments
within 15 business days. Begin new construction inspections within 48 hours of notification. With regards to
underground utility mapping and as-built drawings, complete the gravity sewer. Continue to support OCWS
projects in the Capital Improvement Plan by surveying, designing, permitting, and inspections as needed.
Ensure accurate as-built construction plans are recorded for each completed project.
KEY OBJECTIVES:
The primary mission of OCWS Engineering is to design, review, permit, and inspect new construction, either
for land development projects or OCWS construction projects for the water and sewer system that benefit our
customers. OCWS Engineering also provides surveying, computer aided-drafting, land/easement acquisition,
and project management services for OCWS in-house construction projects. The primary deliverables of
OCWS Engineering are approved construction plans and as-built construction plans. The following are key
objectives:
1. To assure all development serviced by the system meets accepted standard specifications.
2. Provide engineering support to assure that the system meets its operation and maintenance standards.
3. Advise the director and senior managers regarding engineering and design services.
4. To increase the search for relationships that will result in the consolidation of potable water supply as well
as wastewater treatment and disposal services – to ultimately save the customers and taxpayers money.
The following major projects are planned for FY2016:
Ø Arbennie Pritchett Water Reclamation Facility (APWRF) Expansion (design-build construction) – Expand
the current facility from 10 million gallons per day (MGD) to 15 MGD because of additional flow from
Eglin AFB projects, the East County Service Area (diversion project mentioned above), and future growth.
Project will be funded with Capacity Expansion Charges that have been received from some of these listed
projects and other land development projects.
Ø Camp Rudder Force Main & Lift Station (construction) – provide sewer service to Camp Rudder via a
master lift station and approximately 8.6 miles of piping. This project will divert all wastewater flows from
Camp Rudder to the APWRF.
Ø Brooks Bridge Water Main Bore (alternatives analysis & easement acquisition) – install a second water
supply line to Okaloosa Island (or repair the broken bore, if at all possible), which would then serve as the
primary water source to Okaloosa Island (and main on bridge would serve as backup). This project is
partially funded by a state appropriation administered by a FDEP Grant Agreement.
Ø Diversion of East County wastewater from the Niceville-Valparaiso Regional Sewer Board Plant to the
Arbennie Pritchett Water Reclamation Facility (APWRF) (construction) – construct a new force main and
pump station to divert OCWS sewer flow from NVRSB to the Arbennie Pritchett WRF. This will
consolidate flows and reduce overall wastewater treatment cost for the flows from our East County service
area. Project will also eliminate Rocky Bayou Lift Station, Post Office Lift Station, and miles of 14” aging,
sewer force main.
Ø Future Water Supply (planning) – continue with Implementation Plan to ensure the
