vegetation is ready for inspection. The
Contractor shall meet and accompany the Engineer onsite during the inspection.
F. Soil Amendments: The Contractor shall submit the required manufacturer’s information
certifying that soil amendments meet the specifications.
PART 2 - EXECUTION
2.1 GENERAL
A. Schedule
The Contractor shall complete all construction activity (plant, sand fence, signage, and
post and rope installation) and remove all equipment from the beach and work areas
prior to marine turtle nesting season (May 1 – October 31). The Contractor shall not
commence work until receiving a written Notice to Proceed from the Owner or
Engineer. Work is permitted seven (7) days a week during daylight hours only (sunrise to
1 hour after sunset).
B. Notification
The Contractor shall notify the Engineer at least 3 days prior to project mobilization,
commencement of installation, project completion, inspections, and demobilization.
The Contractor shall notify the Engineer at least 10 days before the scheduled 180-day
vegetation inspection. The Contractor shall notify the Engineer at least 48 hours prior to
the suspension of work. The Contractor shall notify the Engineer immediately for any
Last Revised – 01/09/2013 Page 56
Packet Pg. 406
8.5.a.a
work stoppages resulting from environmental impacts (turtle nest impacts, fuel spills,
etc.), permit violations, property owner disputes, safety violations, etc.
C. Work
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
The Contractor shall install the dune vegetation, sand fencing, signage, and post and
rope in accordance with the Drawings. The Contractor shall field-verify the specific
locations of the work and obtain Engineer approval prior to installation of any work
components. The Owner and Engineer reserve the right to suspend the work at any time
when the location, layout, or limits established by the Contractor are not sufficient to
define the work. The Contractor shall utilize the construction baseline and stationing
shown in the Drawings to define features of the work and document completed work
areas.
D. Planting Layout
The Contractor shall lay out the locations of the proposed vegetation areas, for
approval by the Engineer, prior to planting. At a minimum, the layout shall include
markers (e.g., flagging or stakes) at the seaward and landward limits of the planting
area, accesses (paths and dune walkovers), and endpoints of the work. The markers
shall be placed at 100-foot centers maximum and at reduced distances in non-uniform
areas to clearly define the planting area. The Contractor will be responsible for tracking
and removing all stakes and markers from the beach project area. The work shall be
performed in a continuous manner from start to finish without interruption or variation.
2.2 WORK AREAS AND ACCESS
A. Planting Areas
The plant units shall be installed on the existing dune within the planting areas shown in
the Drawings. The Zone I planting area primarily represents the seaward dune face and
dune crest. The Zone II planting area primarily represents the landward dune face.
B. Staging Areas
The Contractor shall utilize the staging areas shown in the Drawings. The Contractor shall
maintain the staging areas in a neat and orderly fashion and minimize the area utilized
for staging and/or equipment storage. The Contractor will be responsible for cleaning
and restoring the staging areas to pre-construction conditions to the satisfaction of the
Owner and Engineer prior to demobilization. The Contractor shall be responsible for any
damage to the existing dunes, dune vegetation, private and public property, and
staging, work, and access areas. The Contractor shall repair any damage resulting from
the Contractor’s operations at no cost to the Owner or Engineer. The Contractor will not
be permitted to stockpile equipment or materials on the beach except those required
for immediate (same day) planting or installation. The Contractor is responsible for the
collection and removal of any debris and litter associated with the work. The Work Plan
submitted by the Contractor shall describe the proposed use (including
equipment/materials to be stored, schedule, etc.) of the staging areas.
Last Revised – 01/09/2013 Page 57
Packet Pg. 407
8.5.a.a
C. Beach Access
The Contractor shall utilize only the beach access corridors shown in the Drawings unless
otherwise approved by the Owner and Engineer. The Contractor shall maintain all
beach accesses in working order and shall not inhibit the general public from accessing
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
the beach. The Contractor shall not enter or place planting units, sand fence,
equipment or materials on private properties outside of the project area defined in the
Drawings. The Contractor shall minimize access and travel along the beach to avoid
disturbance or impacts to the existing beach and dune system. Driving vehicles along
any part of the dune or upland of the dune is prohibited. The Contractor shall repair any
damage resulting from the Contractor’s operations at no cost to the Owner or Engineer.
D. Work Area
The Contractor’s active work area shall not exceed 500 linear feet in a shore-parallel
direction.
PART 3 - PRODUCTS
3.1 PLANTING MATERIALS
A. Plant Source
The source of all planting units delivered under this bid item will be limited to seeds and
propagated plants collected from the South Alabama and Florida Panhandle coasts.
Source material collected from areas other than the South Alabama and the Florida
Panhandle coasts (e.g., Florida east coast or Caribbean) will be rejected. The
Contractor shall provide written documentation as to the source of the planting units in
the bid package. Documentation shall include collection permits or contracts from the
Florida Department of Environmental Protection (FDEP), the U.S. Department of
Agriculture, or other comparable documents. Bids submitted without this
documentation will not be considered.
B. Plant Species
The Contractor shall plant the native dune species listed below in accordance with the
specified percentages of total plants and within the areas shown in the Drawings. The
Contractor shall meet the specified planting percentages over the approximately 1,500
to 2,000-feet long acceptance sections documented in the Drawings. Section 3.1.C
below includes specifications for the diversity species. The Contractor’s Work Plan shall
include a detailed description of the proposed planting scheme.
1. Planting Zone I (Seaward Dune Face and Dune Crest):
a. Sea Oats (Uniola paniculata) – 80%
b. Panic Grass (Panicum amarum) – 10%
c. Diversity Species – 10%
2. Planting Zone II (Landward Dune Face):
Last Revised – 01/09/2013 Page 58
Packet Pg. 408
8.5.a.a
a. Sea Oats (Uniola paniculata) – 70%
b. Panic Grass (Panicum amarum) – 10%
c. Diversity Species – 20%
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
C. Diversity Species
The Contractor shall provide and install a minimum of three additional native species
according to the percentages specified above. The Contractor shall plant the diversity
species intermittently among the sea oats, in even distributions, and within the areas of
greatest survival and function according to standard industry practice. The diverse
species provided shall be in even proportions. Diversity species may include (but not be
limited to):
Beach Elder (Iva imbricata)
Beach Morning Glory (Ipomaea imperati)
Railroad Vine (Ipomoea pes-caprae)
Sea Purslane (Sesuvium portulacastrum)
Coastal Blue Stem (Schizachyrium scoparium)
Dune Sunflower (Helianthus debilis)
Blanket Flower (Gaillardia pulchella)
Coastal Sea Rocket (Cakile lanceolata)
The Contractor may recommend additional diversity species for approval by the
Engineer. The Contractor shall submit appropriate documentation identifying the
advantages of the proposed species and certifying the proposed species are suitable
for the site.
3.2 PROPAGATION METHODS
A. Liners
For 2-inch species, all plant materials shall be grown in multi-well trays (liners) not to
exceed a size of approximately 1.5 inches wide by 1.5 inches long and not less than 2.5
inches in depth. Root ball (container) volumes shall not be less than 5 cubic inches.
For 4-inch species, all plant materials shall be grown in multi-well liners not to exceed a
size of approximately 3.1 inches wide by 3.1 inches long and not less than 3 inches in
depth. Root ball (container) volumes shall not be less than 26 cubic inches.
B. Number of Seeds per Liner
The nursery shall determine, through germination experiments, the number of seeds
placed in each liner such that viable planting units with at least three emergent stems
for 2-inch planting units and at least four emergent stems for 4-inch planting units are