READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — December 18, 2012 — reading text

Part 39 of 223. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

completd coordination for Eglin UP.pdf (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 8.2.b.b Packet Pg. 199 Attachment: completd coordination for Eglin UP.pdf (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 8.2.b.b Packet Pg. 200 Attachment: completd coordination for Eglin UP.pdf (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 8.2.b.b Packet Pg. 201 Attachment: completd coordination for Eglin UP.pdf (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 8.2.b.b Packet Pg. 202 Attachment: completd coordination for Eglin UP.pdf (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 8.2.b.b Packet Pg. 203 Attachment: completd coordination for Eglin UP.pdf (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 8.2.b.c Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) Water and Wastewater System Utility Privatization Proposal Eglin Air Force Base Florida Packet Pg. 204 Eglin AFB Utility Privatization 8.2.b.c Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) Project Overview • Solicitation for Proposals from Utilities and Private Companies • Water and Wastewater Systems Privatization • 50 year Contract Term and Bill of Sale • Defense Logistics Agency (DLA) is Managing the Procurement of Services • Utility Privatization Project DOES NOT include the Wastewater Treatment Facilities. • Wastewater Treatment is Separate Contract Packet Pg. 205 8.2.b.c Eglin AFB Locations Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) • Eglin AFB UP includes the following locations: • Main Base • Santa Rosa Island • Duke Field • Mid-Bay Shores • Camp Rudder Maxwell/Gunter • 7th Special Forces Group Recreation Area (White Point • Navy EOD • Numerous Test Sites • Cape Sand Blas and Ranges • Poquito Bay Housing • Camp Pinchot Area Packet Pg. 206 Eglin AFB Reservation Map 8.2.b.c Packet Pg. 207 Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 8.2.b.c Water System Overview Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) Water assets include water distribution, storage, water supply, and treatment: • 652,305 Lineal feet of various size/type of pipe • 747 Fire hydrants • 1249 Valves, various size/types • 82 Water wells, pumps, etc. Packet Pg. 208 8.2.b.c Water System Overview Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) Water assets include water distribution, storage, water supply, and treatment: • 992 Backflow preventers, various size/types • 17 Elevated Tanks and other ground storage tanks • Associated chemical systems and other ancillary equipment Packet Pg. 209 8.2.b.c Wastewater System Overview Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) Wastewater assets include gravity collection system, force mains, and pump stations : • 398,358 Lineal feet of various size/type of gravity collection piping • 1058 manholes, various sizes/types • 83 Wastewater pumping stations Packet Pg. 210 8.2.b.c Wastewater System Overview Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) Wastewater assets include gravity collection system, force mains, and pump stations : • 62,222 Lineal feet of various size/type of force main piping • Associated buildings, systems, and other ancillary equipment Packet Pg. 211 8.2.b.c Utility Privatization Procurement Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) 1. Submit Proposals 1. Water 2. Wastewater 3. Combined 2. Proposals Due February 19 3. DLA Proposal Review (6-12 mos) 4. If Selected, Negotiations & DLA Audit of County and Subs 5. Transition Period (6-9 mos) 6. Final Negotiation and 50-yr Contract Execution 7. Bill of Sale-Transfer of Ownership Packet Pg. 212 8.2.b.c Attachment: Eglin UP_Agenda PPT (1332 : Eglin AFB Utilities Privatization (UP) Proposal) Water and Wastewater System Utility Privatization Proposal Eglin Air Force Base Florida Packet Pg. 213 8.3.a BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: February 5, 2013 TO: Honorable Chairman and Members of the Board FROM: Greg Donovan SUBJECT: Bob Sikes Airport Taxiway-A Project Closeout/Final Payment DEPARTMENT: Airport BCC DISTRICT: All STATEMENT OF ISSUE: The BCC is requested to approve the following items related to the Taxiway A Rehabilitation project at Bob Sikes Airport: (1) Change Order No. 5-FINAL deleting $27,622.22 from contract amount and adding 97 calendar days to the contract; (2) Release of all retainage in amount of $1,022,265.51; and (3) Final payment to Anderson Columbia Co., Inc. In the amount of $1,127,296.26 (includes retainage). BACKGROUND: The Taxiway A Rehabilitation project began in 2009 with funding to mill-and-overlay the existing 50-foot wide taxiway. The Airport decided to expand the scope of the project to include widening the taxiway from 50 to 75 feet to accommodate existing and future airport tenants which utilize aircraft such as C-130s, B-757s, and DC-10s. On July 7, 2009, design started for the taxiway widening project. During the design phase and early in the coordination process with the Northwest Florida Water Management District (NWFWMD), it became apparent that the majority of the existing pavements at Bob Sikes Airport were constructed prior to stormwater permitting requirements and were not permitted. The stormwater permit application for the improvements included in this project would require a complete stormwater retrofit of the existing impervious improvements along with the proposed improvements. In consideration of the required stormwater permitting and in an effort to plan for and facilitate the future of Bob Sikes Airport, airport staff developed a strategic plan to aggressively petition state and federal aviation leaders for discretionary funding. Ten months later, over $6M in state funds were obtained. A comprehensive airport master stormwater plan was developed which permitted the existing and future airport development. This Environmental Resource Permit remains the second largest permit ever issued by the NWFWMD and reduces the total time required to permit and construct a development on the airport which-considerably increases the Packet Pg. 214 8.3.a marketability of the Bob Sikes Airport to potential tenants. As a testament to the foresight, CEW now has three new based tenants who have constructed facilities and hired employees, this all before the project was even completed on time and under budget. During this project, the Airport worked closely with the Federal Aviation Administration (FAA) and Florida Department of Transportation (FDOT) to add improvements that provide long-term benefits to the Bob Sikes Airport utilizing unencumbered funds in the existing FAA and FDOT grants for this project. Change Order No. 3 (issued January 9, 2012) added a 150 ft by 150 ft concrete apron to protect against pavement damage from certain aircraft activities. Change Order No. 4 (issued May 16, 2012) added two new taxiway connectors on the northwest end of Taxiway A to accommodate future development. Change Order No. 5 (pending) includes tree clearing required along the east side of the runway to facilitate long-term compliance with airspace clearance requirements. The construction contract with Anderson Columbia Co., Inc. For the Taxiway A Rehabilitation project was issued on January 11, 2011. A final completion inspection of the taxiway improvements was conducted on October 3, 2012. All punch-list items have been addressed to the satisfaction of the County airports and engineer. Change Order No. 5 includes additional tree clearing work authorized by the funding agencies, adds 97 calendar days to the contract, and provides a final reconciliation of the construction quantities for this unit price contract per the actual final quantities accepted and measured in the field. Change Order No. 5 represents a $27,622.22 reduction in the contract amount. Upon approval of Change Order No. 5, the final contract amount will be $10,327,685.87. OPTIONS: Approve, Reject or Table RECOMMENDATIONS: Approve Change Order No. 5 with Anderson Columbia Co., Inc. To reduce the total contract amount by $27,622.22 and increase the contract time by 97 calendar days; approve release of retainage in amount of $1,022,265.51; and approve final payment in amount of $1,127,296.26 (includes retainage). RECOMMENDED BY: APPROVED BY: Packet Pg. 215 8.3.a James D. Curry, County Administrator Packet Pg. 216

Download this text file with its original spacing ↓