Water and Sewer
BCC DISTRICT: 3&5
STATEMENT OF ISSUE: OCWS staff requests BCC approval to authorize the Purchasing
Department to solicit quotes by phase in lieu of formal bids for the purchase of pipe and
associated materials for the East County/Eglin Master Sewer Plan, at the appropriate time during
the procurement process of each phase.
BACKGROUND: OCWS has several construction projects scheduled in the East County/Eglin
area in the immediate future and the next few years. For the purposes of construction scheduling
and material procurement, we have put together a 10-phase plan that encompasses all these
projects. All projects are either currently in OCWS' 5-year CIP or are funded by Eglin AFB.
The phases/projects are depicted on the attached aerial photos and listed as follows:
- Phases 1-4 - Rocky Bayou 16" Force Main
- Phase 5 - Eglin Main Base Wastewater (Main Base Lift Station, Plew Lift Station,
approximately 3.6 miles of 24" force main, approximately 3.8 miles of 16" force main, and
conduit/fiber)
- Phase 6 - Replace 10" Force Main at Canal with 16" Force Main
- Phase 7 - Replace Meigs-Seminole Lift Station
- Phase 8 - Hwy 20 12" Force Main (approximately 1 mile, from Lancaster Drive to Range
Road)
- Phase 9 - College Blvd Re-Pump Station
- Phase 10 - NVOC Force Main (approximately 6.7 miles; 16" preliminary diameter)
The above-mentioned projects will achieve 4 primary goals and objectives of the department:
1. Complete the Eglin Main project by the contract date, which is very aggressive
(12/31/2013).
2. Complete Eglin Main project ASAP, because this project will be revenue producing.
3. Abandon the Post Office Lift Station, Rocky Bayou Lift Station, and the aging 14" force
main.
4. Divert all East County flow from NVOC WWTP to the Arbennie Pritchett WRF in order to
save significantly on O&M expenses.
Packet Pg. 153
8.2.a
Construction of Phases 1-4 (Rocky Bayou Force Main) are already substantially complete, and
the BCC has already approved quotes in lieu of bids for the piping/appurtenances for the material
procurement. The other phases are in surveying, design, or permitting. OCWS and Purchasing
staffs have met to discuss procurement strategy for the remaining phases. On the complex items,
such as lift stations, we feel that the formal bid process is absolutely necessary. On more
straightforward items like pipe and miscellaneous appurtenances, we feel the most economical
approach would be to solicit quotes in lieu of bids. Historically, the same vendors will provide
pricing whether it is quotes or a formal bid process. Because quotes are a competitive process,
OCWS and Purchasing believe the prices will come in under the budgeted amounts. In addition,
obtaining quotes instead of bids allows for a quicker, more streamlined process. In many of
these projects, time is of the essence, because of the above-mentioned goals and objectives.
Therefore, OCWS and Purchasing staff request to solicit quotes in lieu of bids for any piping and
miscellaneous appurtenances (valves, manholes, conduit, etc.) for Phases 5-10. We are asking
that quotes be solicited at the appropriate time for each project in the next 2-3 years. In addition,
for any in-house construction projects over $300,000, we will set up Public Meetings per Florida
Statutes to request BCC approval for self performance. This will be done project by project in
the future.
Regarding the budget, Phase 5 is funded by Eglin AFB. In budget years FY2013 & FY2014, a
total of $1,700,000 is budgeted for Phases 6-8. In budget years FY2012 (rollover), FY2013, and
FY2014, a total of $4,500,000 is budgeted for Phases 9-10.
OPTIONS: Approve or Deny.
RECOMMENDATIONS: Staff recommends BCC authorization for the Purchasing Department
to solicit quotes and to then proceed with the (award) purchase from the lowest responsive and
responsible quoter in order to save money and time on the purchase of pipe and miscellaneous
appurtenances for the East County/Eglin Master Sewer Plan.
RECOMMENDED BY:
APPROVED BY:
James D. Curry, County Administrator
Packet Pg. 154
8.2.a.a
Phase 1: Rocky Bayou 16" Force Main (FM) Phase 7: Replace Meigs-Seminole Lift Station
Phase 2: Rocky Bayou 16" FM Phase 8: Hwy 20 12" FM
Phase 3: Rocky Bayou 16" FM Phase 9: New College Blvd Lift Station
Quotes in Lieu of Bids for East County Master Sewer Plan)
LLY
Phase 4: Rocky Bayou 16" FM Phase 10: NVOC 16" FM KE
Phase 5: Eglin Main 20" FM & 2 Lift Stations Phase 10a: NVOC 16" FM Alternate
Phase 6: Replace 10" FM at Canal with 16" FM
WOLVERINE
JACKSO N
E
Y
EG
LA R
LL
JC
CO
ER
ROG
S
STIC
VAL A
Attachment: East County Master Sewer Plan_Page1 (1335 : ANDREW
5
Y8
HW
ND
BO
Arbennie Pritcehtt WRF R TW
O BE
NR
GE Proposed Eglin Main Lift Station
LEWIS TURNER
East County Master Sewer Plan - Page 1
.
MAP PROJECTION:
Lambert Conformal Conic Projection
Stateplane : Flo ida Nor th (0903)
NAD 1983(90), NAVD 1988.
Existing Phase 3 Phase 6 Phase 9 StreetCenterlines PUBLIC RECORD:
This map was created by Okaloosa County GIS
and is in the public domain pur uant
Phase 1 Phase 4 Phase 7 Phase 10
to Chapter 119 , Florida Statutes.