READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — December 18, 2012 — reading text
Part 194 of 223. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 01-Agenda Packet.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
NOTES, KEY MAP, AND
ESTIMATED QUANTITIES SCHEDULE: OPTION 2 OVERVIEW
4" PLANTS SPACED AT 18" O.C. (SEE SPECIFICATIONS FOR PLANT DETAILS)
A A
* ESTIMATED QUANTITY IS LINEAR DISTANCE ALONG DUNE TOE AND PATHWAYS. ESTIMATE DOES NOT INCLUDE ADDITIONAL ROPE NEEDED FOR POST AND
BOARDWALK ATTACHMENTS. CONTRACTOR RESPONSIBLE FOR DETERMINING ACTUAL QUANTITY.
** SPECIES SELECTED BY CONTRACTOR AND APPROVED BY ENGINEER. SEE SPECIFICATIONS.
*** ESTIMATED PLANT QUANTITIES PROVIDED ARE BASED ON PROPOSED PLANTING AREAS SHOWN. IT IS THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE C-2
Packet Pg. 508
EXACT QUANTITIES NEEDED TO ATTAIN THE INTENT OF THESE CONSTRUCTIONS DRAWINGS AND SPECIFICATIONS.
SHEET 2 OF 6
8.5.a.a
1 2 3 4 5 6 7 8
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
1 2 3 4 5 6 7 8
ROPE CONNECTING POSTS (TYP)
GENERAL NOTES
PLANTING RATIOS VARY 10.0'' MAX
A B EXISTING DUNE PATH
C,D (SEE SPECIFICATIONS) TIMBER POSTS (TYP) 1. THE CONTRACTOR SHALL NOT ENCROACH INTO EXISTING
C-3 TIMBER POST (TYP) CONSTRUCTED VEGETATION LANDWARD OF THE BEACH AND DUNE FILL.
C-3 EXISTING BOARDWALK C-3 (SEE DETAIL I, THIS SHEET)
LANDWARD DUNE TOE DUNE 2. PLANTING SHALL BE DONE BY HAND.
ROPE CONNECTING 3. PLANTS SHALL BE PLANTED 12" ON CENTER IN ROWS SPACED
H POSTS
