READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — December 18, 2012 — reading text

Part 194 of 223. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 01-Agenda Packet.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

NOTES, KEY MAP, AND ESTIMATED QUANTITIES SCHEDULE: OPTION 2 OVERVIEW 4" PLANTS SPACED AT 18" O.C. (SEE SPECIFICATIONS FOR PLANT DETAILS) A A * ESTIMATED QUANTITY IS LINEAR DISTANCE ALONG DUNE TOE AND PATHWAYS. ESTIMATE DOES NOT INCLUDE ADDITIONAL ROPE NEEDED FOR POST AND BOARDWALK ATTACHMENTS. CONTRACTOR RESPONSIBLE FOR DETERMINING ACTUAL QUANTITY. ** SPECIES SELECTED BY CONTRACTOR AND APPROVED BY ENGINEER. SEE SPECIFICATIONS. *** ESTIMATED PLANT QUANTITIES PROVIDED ARE BASED ON PROPOSED PLANTING AREAS SHOWN. IT IS THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE C-2 Packet Pg. 508 EXACT QUANTITIES NEEDED TO ATTAIN THE INTENT OF THESE CONSTRUCTIONS DRAWINGS AND SPECIFICATIONS. SHEET 2 OF 6 8.5.a.a 1 2 3 4 5 6 7 8 Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin)) 1 2 3 4 5 6 7 8 ROPE CONNECTING POSTS (TYP) GENERAL NOTES PLANTING RATIOS VARY 10.0'' MAX A B EXISTING DUNE PATH C,D (SEE SPECIFICATIONS) TIMBER POSTS (TYP) 1. THE CONTRACTOR SHALL NOT ENCROACH INTO EXISTING C-3 TIMBER POST (TYP) CONSTRUCTED VEGETATION LANDWARD OF THE BEACH AND DUNE FILL. C-3 EXISTING BOARDWALK C-3 (SEE DETAIL I, THIS SHEET) LANDWARD DUNE TOE DUNE 2. PLANTING SHALL BE DONE BY HAND. ROPE CONNECTING 3. PLANTS SHALL BE PLANTED 12" ON CENTER IN ROWS SPACED H POSTS

Download this text file with its original spacing ↓