project-associated discharge other than dredging, disposing, or nourishing the beach (e.g., scow leakage or runoff from temporary containment area) should be monitored as close to the source as possible every hour until background turbidity levels return or until otherwise directed by the Department. The Permittee shall notify the Department by separate email or telephone to the Permit Processor, or the JCP Compliance Officer, of such an event within 24 hours of the time the Permittee first becomes aware of the discharge. 31. The compliance locations given above shall be considered the limits of the temporary mixing zone for turbidity allowed during construction. If monitoring reveals turbidity levels at the compliance sites that are greater than 0 NTUs within Outstanding Florida Waters, or 29 NTUs outside of Outstanding Florida Waters, above the corresponding background turbidity levels, or any other project-associated discharge results in a turbidity violation, construction activities shall cease immediately and not resume until corrective measures have been taken and turbidity has returned to acceptable levels. Any such occurrence shall also be immediately reported to the Department’s Bureau of Beaches and Coastal Systems (BBCS) in Tallahassee at (850) 414-7716 (attn: JCP Compliance Officer) and the Department’s Northwest District office in Pensacola. 32. Turbidity monitoring reports shall be submitted to the Department (JCP Compliance Officer) on a weekly basis within seven (7) days of collection. Reports shall be submitted under a cover letter containing the following statement: "This information is provided in partial fulfillment of the monitoring requirements in Permit No. 0286575-001-JC Western Destin Beach Restoration." The cover letter shall summarize any significant compliance issues, summarize any corrective measures taken as result of a turbidity violation and provide the dates or monitoring period of the reports. Also, please clearly reference the permit number and project name on each page of the reports. In addition to analytical results for samples and quality control, each report should also include: a. Specific monitoring requirements for the sampling location; b. Time and date samples were taken; c. Sampling results, the net difference between compliance and background results, and whether the turbidity level is in compliance (any violations of the turbidity Packet Pg. 462 8.5.a.a Joint Coastal Permit Western Destin Beach Restoration Permit No. 0286575-001-JC Page 22 of 26 standard shall be highlighted). Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin)) d. Depth of water body and depth of samples; e. Water temperature; f. Antecedent weather conditions, including wind direction and velocity; g. Tidal stage and direction of flow; h. A statement describing the methods used in collection, handling and analysis of the samples; i. Turbidity meter calibration/verification documentation; j. A map indicating the location of the current construction activity, the sampling locations (background and compliance), the visible plume pattern of the applicable mixing zone, and location of nearby Outstanding Florida Waters, if applicable; and k. A statement by the individual responsible for implementation of the sampling program concerning the authenticity, precision, limits of detection and accuracy of the data. PHYSICAL MONITORING REQUIRED: 33. Pursuant to Rule 62B-41.005(16), F.A.C., physical monitoring of the project is required through acquisition of project-specific data to include, at a minimum, topographic and bathymetric surveys of the beach, offshore, and borrow site areas, and engineering analysis. The monitoring data are necessary in order for both the project sponsor and the Department to regularly observe and assess, with quantitative measurements, the performance of the project, any adverse effects which have occurred, and the need for any adjustments, modifications, or mitigative response to the project. The scientific monitoring process also provides the project sponsor and the Department information necessary to plan, design, and optimize subsequent follow-up projects, potentially reducing the need for and costs of unnecessary work, as well as potentially reducing any environmental impacts that may have occurred or be expected. The attached Physical Monitoring Plan, received by the Department on October 6, 2009, is hereby approved and incorporated by reference as a specific condition of this permit. The Plan can be revised at any later time by written request of the Permittee and with the written approval of the Department. If subsequent to approval of the Monitoring Plan Packet Pg. 463 8.5.a.a Joint Coastal Permit Western Destin Beach Restoration Permit No. 0286575-001-JC Page 23 of 26 there is a request for modification of the permit, the Department may require revised or additional monitoring requirements as a condition of approval of the permit modification. Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin)) As guidance for obtaining Department approval of any changes to the physical monitoring plan, the revised plan shall generally contain the following items: a. Topographic and bathymetric profile surveys of the beach and offshore shall be conducted within 90 days prior to commencement of construction, and within 60 days following completion of construction of the project. Thereafter, monitoring surveys shall be conducted annually for a period of three (3) years, then biennially until the next beach nourishment event or the expiration of the project design life, whichever occurs first. The monitoring surveys shall be conducted during a spring or summer month and repeated as close as practicable during that same month of the year. If the time period between the immediate post-construction survey and the first annual monitoring survey is less than six months, then the Permittee may request a postponement of the first monitoring survey until the following spring/summer. A prior design survey of the beach and offshore may be submitted for the pre-construction survey if consistent with the other requirements of this condition. The monitoring area shall include profile surveys at each of the Department of Environmental Protection’s DNR reference monuments within the bounds of the beach fill area and along at least 5,000 feet of the adjacent shoreline on both sides of the beach fill area. For those project areas that contain erosion control structures, such as groins or breakwaters, additional profile lines shall be surveyed at a sufficient number of intermediate locations to accurately identify patterns of erosion and accretion within this subarea. All work activities and deliverables shall be conducted in accordance with the latest update of the Bureau of Beaches and Coastal Systems (BBCS), Monitoring Standards for Beach Erosion Control Projects, Section 01000 - Beach Profile Topographic Surveying and Section 01100 - Offshore Profile Topographic Surveying. b. Bathymetric surveys of the borrow area(s) shall be conducted within 90 days prior to commencement of construction, and within 60 days following completion of construction of the project concurrently with the beach and offshore surveys required above. A prior design survey of the borrow area may be submitted for the pre-construction survey if consistent with the other requirements of this condition. Survey grid lines across the borrow area(s) shall be spaced to provide sufficient detail for accurate volumetric calculations but spaced not more than a maximum of 500 feet apart, and shall extend a minimum of 500 feet beyond the boundaries of the borrow site. In all other aspects, work activities and deliverables shall be Packet Pg. 464 8.5.a.a Packet Pg. 465 Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin)) 8.5.a.a Packet Pg. 466 Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin)) 8.5.a.a Joint Coastal Permit Western Destin Beach Restoration Permit No. 0286575-001-JC Page 26 of 26 Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin)) Table 1. Marine Turtle Monitoring for Beach Restoration Projects The following marine monitoring is required for beach restoration projects by the FWC, Bureau of Protected Species Management. Reports summarizing the nesting should be submitted to the Tequesta office with a copy to the Tallahassee office by January 15 of the subsequent year. Data for nesting activity on filled and nonfilled areas should be reported separately, and should include numbers of nests lost to erosion or washed out. Characteristic Parameter Measurement Variable Nesting Success False crawls Visual Number and location of false crawls in - number assessment of all fill areas, groin areas, and nonfill areas: false crawls any interaction of the turtle with obstructions, such as groins, seawalls, or scarps, should be noted. False crawl Categorization of Number in each of the following - type the stage at categories: emergence-no digging, which nesting preliminary body pit, abandoned egg was abandoned chamber Nests Number The number of marine turtle nests in

Download this text file with its original spacing ↓