and/or a secondary marker at a point landward as
possible to assure that future location of the nest will be possible should the
on-beach marker be lost. A series of stakes and highly visible survey ribbon
or string shall be installed to establish a 10-foot radius around the nest. No
activity shall occur within this area, nor will any activities occur which could
result in impacts to the nest. Nest sites shall be inspected daily to assure nest
markers remain in place and the nest has not been disturbed by the project
activities.
iii. Reports on all nesting activity shall be provided for the initial nesting season
and for a minimum of two additional nesting seasons if placed material still
remains on the beach. Monitoring of nesting activity in the seasons following
construction shall include daily report sheets noting all activity, nesting
success rates, hatching success of all relocated nests, hatching success of a
representative sampling of nests left in place (if any), dates of construction
and names of all personnel involved in nest surveys and relocation activities.
Data should be reported separately for the nourished areas and for an equal
length of adjacent beach that is not nourished in accordance with the attached
Table. Summaries of nesting activity shall be submitted in electronic format
(Excel spreadsheets). All reports should submitted by January 15 of the
following year.
14. Project Lighting. Lighting on offshore or onshore equipment shall be minimized through
reduction, shielding, lowering, and appropriate placement to avoid excessive illumination
Packet Pg. 451
8.5.a.a
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 11 of 26
of the water's surface and nesting beach while meeting all Coast Guard, EM 385-1-1, and
OSHA requirements. Light intensity shall be reduced to the minimum standard required
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
by OSHA for General Construction areas, in order not to misdirect sea turtles. Shields
shall be affixed to the light housing and be large enough to block light from all lamps
from being transmitted outside the construction area, as illustrated
below.
15. Equipment Storage. Staging areas for construction equipment for sand placement shall
be located off the beach to the maximum extent practicable from May 1 to October 31.
a. Nighttime storage of the beach restoration project construction equipment not in
use shall be off the beach to minimize disturbance to sea turtle nesting and
hatching activities.
b. All construction pipes that are placed on the beach shall be located as far
landward as possible without compromising the integrity of the existing or
reconstructed dune system.
i. Temporary storage of pipes shall be off the beach to the maximum extent
possible.
ii. Temporary storage of pipes on the beach shall be in such a manner so as to
impact the least amount of nesting habitat and shall not compromise the
integrity of the dune systems.
Packet Pg. 452
8.5.a.a
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 12 of 26
iii. Pipes placed parallel to the dune shall be five to ten feet away from the toe of
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
the dune.
16. Fill Restrictions. During nesting season, the contractor shall not extend the beach fill
more than 500 feet along the shoreline between dusk and the following day until the daily
nesting survey has been completed and the beach cleared for fill advancement.
a. If the 500 feet is not feasible for the project, an agreed upon distance shall be
decided on during the preconstruction meeting.
b. Once the beach has been cleared and the necessary nest relocations have been
completed, the contractor is allowed to proceed with the placement of fill during
daylight hours until dusk at which time the 500-foot length limitation shall apply.
17. Beach Maintenance. All derelict concrete, metal, and coastal armoring material and
other debris shall be removed from the beach prior to any dredged material placement to
the maximum extent practicable. If debris removal activities will take place from May 1
through September 1, the work shall be conducted during daylight hours only and shall
not commence until completion of the sea turtle survey each day. All excavations and
temporary alterations of the beach topography shall be filled or leveled to the natural
beach profile prior to 9 p.m. each day.
18. Hopper Dredging Requirements. In the event a hopper dredge is utilized, the following
requirements shall be met in addition to the Terms and Conditions of the NMFS Regional
Biological Opinion for Hopper Dredging in the Gulf of Mexico:
a. Handling of sea turtles captured during hopper dredging projects shall be
conducted only by persons with prior experience and training in these activities
and who is duly authorized to conduct such activities through a valid permit
issued by the FWC, pursuant to Florida Administrative Code 68E-1.
b. Dredging Pumps. Standard operating procedure shall be that dredging pumps
shall be disengaged by the operator when the dragheads are not firmly on the
bottom, to prevent impingement or entrainment of sea turtles within the water
column. This precaution is especially important during the cleanup phase of
dredging operations.
c. Sea Turtle Deflecting Draghead. A state-of-the-art rigid deflector draghead must
be used on all hopper dredges in all Gulf of Mexico channels at all times of the
year.
Packet Pg. 453
8.5.a.a
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 13 of 26
d. The Sea Turtle Stranding and Salvage Network (STSSN) Coordinator, Dr. Allen
Foley, shall be notified at (904) 573-3930 of the start-up and completion of
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
hopper dredging operations.
e. Relocation trawling shall be undertaken at all projects where any of the following
conditions are met; however, other ongoing projects not meeting these conditions
are not required to conduct relocation trawling:
i. Two or more turtles are taken in a 24-hour period in the project
ii. Four or more turtles are taken in the project.
f. The Permittee shall fax (850-921-6988) or e-mail
(Meghan.Koperski@MyFWC.com) weekly reports to the Imperiled Species
Management Section on Friday each week that relocation trawling is conducted in
Florida water. These faxes shall include: the species and number of turtles
captured in Florida waters, general health, and release information. A summary of
all turtles captured in Florida waters, including all measurements, the latitude and
longitude (in decimal degrees) of captures and tow start-stop points, and times for
the start-stop points of the tows, including those tows on which no turtles are
captured shall be submitted to the ISM by January 15 of the following year.
19. Compaction Sampling. Immediately after completion of the beach restoration project and
prior to April 15 for 3 subsequent years, sand compaction sampling shall be monitored in
the area of sand placement in accordance with the following protocols:
a. Compaction sampling stations shall be located at 500-foot intervals along the
project area. One station shall be at the seaward edge of the dune/bulkhead line
(when material is placed in this area) and one station shall be midway between the
dune line and the high water line (normal wrack line).
b. At each station, the cone penetrometer shall be pushed to a depth of 6, 12, and 18
inches three times (three replicates). Material may be removed from the hole if
necessary to ensure accurate readings of successive levels of sediment. The
penetrometer may need to be reset between pushes, especially if sediment
layering exists. Layers of highly compact material may lie over less compact
layers. Replicates shall be located as close to each other as possible, without
interacting with the previous hole and/or disturbed sediments. The three replicate
compaction values for each depth shall be averaged to produce final values for
each depth at each station. Reports shall include all 18 values for each transect
line, and the final 6 averaged compaction values.
c. If the average value for any depth exceeds 500 psi for any two or more adjacent
stations, then that area shall be tilled prior to April 15.
Packet Pg. 454
8.5.a.a
Joint Coastal Permit
Western Destin Beach Restoration
Permit No. 0286575-001-JC
Page 14 of 26
d. If values exceeding 500 psi are distributed throughout the project area but in no
Attachment: Request for Bids (1264 : Approval of Bid - Dune Planting Projects (Okaloosa Island & Western Destin))
case do those values exist at two adjacent stations at the same depth, then
consultation with the FWC shall be required to determine if tilling is required. If
a few values exceeding 500 psi are present randomly within the project area,
tilling shall not be required.
20. Tilling Requirements. Immediately after completion of the initial beach fill placement
event, and prior to April 15 for 3 subsequent years, if placed sand still remains on the
beach, the beach shall be tilled as described below or the Permittee may follow the
procedure outlined