READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — April 7, 2015 — SJPA Number Three AR742 S — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

SJPA Number Three AR742 S — extracted reading text

Machine-extracted OCR text · Review label: Known limitations

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT Number THREE 725030-07 PUBLIC TRANSPORTATION 12114 Page 1 of 4 Financial Project No.: Fund: 010 FLAIR Category: 088719 42561819401 Function: 637 Object Code: 750004 {item-segment-phase-sequence) Federal No.: Org. Code: 55032020329 Contract No.: AR742 DUNS No.. 61.327-7649 Vendar No.: F596000765015 Catalog of Federal Domestic Assistance Number: N/A Catalog of State Financial Assistance Number; 55004 CFDA Title: N/A CSFATille: Aviation THIS AGREEMENT, made and enterad into this day of by and betweern the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida, hereinafter referred to as the Depariment, and Okaloosa County BOCC 302 North Wilson Street, Crestview FL 32536 hereinafter referred to as Agency. WITNESSETH: WHEREAS, the Department and the Agency heretofore on the 5th entered into a Joint Participation Agreement; and day of November 2013 WHEREAS, the Agency desires to accomplish certain project items as outlined in the Attachment "A" appended hereto; and WHEREAS, the Department desires to participate in all eligible items for this project as outiined in Attachment A" for a total Department Share of $4,041,441.00 ] NOW, THEREFORE THIS INDENTURE WITNESSETH: that for and in consideration of the mutual benefits to flow from each to the other, the parties herato agree that the above described Jéint Participation Agreement is to be amended and supplemented as follows: 1.00 Project Description: The project description is amended to Security/Surveillance Systems at the three Okaloosa County Airports (VPS, CEW & DTS). Project consists of: Research and analyze security assessments and recommended measures for security controls, CCTV alternatives, reporting, connectivity, design and construction and installation of security and surveillance equipment and protection hardware and software at Destin and Bob Sikes Alrport with capabilities at both alrports to include end connectivity and capabiliies at Northwest Florida Regional Airport Operations Center. Security TSA Exit Lane Infrastructure, systems/ monitors and CCTV at Northwest Florida Reglonal Airport, Interior and perimeter wildlife and security fencing and wildiife control measures at CEW and DTS, Design, construction and installation of a noise barrier wall and noise control measures at DTS, 72503007 PUBLIC TRANSPORTATION 12114 Page 2 of L 2.00 Project Cost: Paragraph 3.00 of said Agreement is [~ increased/ [~ decreased by $0.00 bringing the revised fotal cost of the projectto $1,301,801.00 _ Paragraph 4,00 of said Agresment is [~ increased/ [~ decreased by $0.00 E bringing the Department's revised total cost of the project to $1,041,441.00 3.00 Amended Exhibits: Exhibit(sy B of sald Agreement is amended by Attachment "A", 4.00 Gontract Time: Paragraph 18.00 of said Agreement <une 30th 2017 5.00 E-Verify Vendors/Contractors: 1. shall ulilize the U.8. Department of Homeland Security's E-Verify system to verify the employment eligibility of all new employses hired by the Vendor/Contractor during the term of the contract; and 2. shall expressly require any subcontractors performing work or providing services pursuant {o the state contract to likewise utilize the U.8. Department of Homeland Security's E-Verify system to verify the employment eligibllity of all new employees hired by the subcontractor during the contract term. Except as hereby modified, amended or changed, all other terms of said Agreement dated Navember 5th PUBLIC TRAKSPORTATION 1212 Fego 3ot © Financial Project No. 42561819407 Contract No. AR742 Agreement Date 2013 and ary subsequent supplements shall remain in {ull force and effect. IN WITNESS WHEREQOF, the parties hereto have caused these presents to be executed, the day and year first above written AGENCY Qkaloosa County BOCC AGENGY NAME Nathan D. Boyles SIGNATORY (PRINTED OR TYPED) SIGNATURE Chairman TITLE FDOT See attached Encumbrance Farm for date of Funding Approval by Gomptrolier LEGAL REVIEW DEPARTMENT OF TRANSPORTATION Jason D. Peters DEPARTMENT OF TRANSPORTATION Director of Transportation Development, D-3 TITLE 725-030-07 PUBLIC TRANSPORTATION 12014 Page 4 of 4 Financlal Project No. 42561819401 Contract No. AR742 Agreement Date ATTACHMENT "A" SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT This Attachment forms an integral part of that certain Supplemental Joint Participation Agreement between the State of Florida, Department of Transportation and Okaloosa County BOCG 302 North Wilson Street, Crestview FL 32536 dated DESCRIPTION OF SUPPLEMENT (Include justification for cost change): Na DOT Cost Change. Project consists of: Research and analyze security assessments and recommended measures for security conirals, CCTV alternatives, reporting, connectivity, design and construction and installation of security and surveillance equipment and protection hardware and software at DTS and CEW with capabilities at both airports to include end connectivity and capabilities at VPS Operations Center. Security TSA Exit Lane Infrastructure, systems/ monitors and CCTV at VPS. Interior and perimeter wildlife and security fencing and wildlife control measures at CEW and DTS Dasion construction and installation of a nnise barrier wall and noise control meastiras at nTsS 1 Project Cost: As Approved As Amended Net Change $1,301,801.00 $1,301,801.00 $0.00 Total Project Cost $1,301,801.00 $1,301,801.00 $0.00 1. Fund Participation: As Approved As Amended Net Change Department: $1,041,441.00 $1,041,441.00 $0.00 Agency: $260,360.00 $260,360.00 $0.00 $0.00 $0.00 Total Fraject Cost $1,301,801.00 $1,301,801.00 $0.00 Comments: = e S

Download this text file with its original spacing ↓