READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — April 7, 2015 — SJPA Number Three AR742 S — reading text
Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.
SJPA Number Three AR742 S — extracted reading text
Machine-extracted OCR text · Review label: Known limitations
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
PUBLIC TRANSPORTATION
SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT
Number THREE
725030-07
PUBLIC TRANSPORTATION
12114
Page 1 of 4
Financial Project No.: Fund: 010 FLAIR Category: 088719
42561819401 Function: 637 Object Code: 750004
{item-segment-phase-sequence) Federal No.: Org. Code: 55032020329
Contract No.: AR742 DUNS No.. 61.327-7649 Vendar No.: F596000765015
Catalog of Federal Domestic Assistance Number: N/A Catalog of State Financial Assistance Number; 55004
CFDA Title: N/A CSFATille: Aviation
THIS AGREEMENT, made and enterad into this day of
by and betweern the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION, an agency of the State of Florida,
hereinafter referred to as the Depariment, and Okaloosa County BOCC
302 North Wilson Street, Crestview FL 32536
hereinafter referred to as Agency.
WITNESSETH:
WHEREAS, the Department and the Agency heretofore on the 5th
entered into a Joint Participation Agreement; and
day of November 2013
WHEREAS, the Agency desires to accomplish certain project items as outlined in the Attachment "A" appended
hereto; and
WHEREAS, the Department desires to participate in all eligible items for this project as outiined in Attachment
A" for a total Department Share of $4,041,441.00 ]
NOW, THEREFORE THIS INDENTURE WITNESSETH: that for and in consideration of the mutual benefits to flow
from each to the other, the parties herato agree that the above described Jéint Participation Agreement is to be amended
and supplemented as follows:
1.00 Project Description: The project description is amended
to Security/Surveillance Systems at the three Okaloosa County Airports (VPS, CEW & DTS). Project consists of:
Research and analyze security assessments and recommended measures for security controls, CCTV alternatives,
reporting, connectivity, design and construction and installation of security and surveillance equipment and protection
hardware and software at Destin and Bob Sikes Alrport with capabilities at both alrports to include end connectivity and
capabiliies at Northwest Florida Regional Airport Operations Center. Security TSA Exit Lane Infrastructure, systems/
monitors and CCTV at Northwest Florida Reglonal Airport, Interior and perimeter wildlife and security fencing and wildiife
control measures at CEW and DTS, Design, construction and installation of a noise barrier wall and noise control
measures at DTS,
72503007
PUBLIC TRANSPORTATION
12114
Page 2 of L
2.00 Project Cost:
Paragraph 3.00 of said Agreement is [~ increased/ [~ decreased by $0.00
bringing the revised fotal cost of the projectto $1,301,801.00 _
Paragraph 4,00 of said Agresment is [~ increased/ [~ decreased by $0.00 E
bringing the Department's revised total cost of the project to $1,041,441.00
3.00 Amended Exhibits:
Exhibit(sy B of sald Agreement is amended by Attachment "A",
4.00 Gontract Time:
Paragraph 18.00 of said Agreement <une 30th 2017
5.00 E-Verify
Vendors/Contractors:
1. shall ulilize the U.8. Department of Homeland Security's E-Verify system to verify the employment eligibility
of all new employses hired by the Vendor/Contractor during the term of the contract; and
2. shall expressly require any subcontractors performing work or providing services pursuant {o the state contract
to likewise utilize the U.8. Department of Homeland Security's E-Verify system to verify the employment
eligibllity of all new employees hired by the subcontractor during the contract term.
Except as hereby modified, amended or changed, all other terms of said Agreement dated Navember 5th
PUBLIC TRAKSPORTATION
1212
Fego 3ot ©
Financial Project No. 42561819407
Contract No. AR742
Agreement Date
2013
and ary subsequent supplements shall remain in {ull force and effect.
IN WITNESS WHEREQOF, the parties hereto have caused these presents to be executed, the day and year first
above written
AGENCY
Qkaloosa County BOCC
AGENGY NAME
Nathan D. Boyles
SIGNATORY (PRINTED OR TYPED)
SIGNATURE
Chairman
TITLE
FDOT
See attached Encumbrance Farm for date of Funding
Approval by Gomptrolier
LEGAL REVIEW
DEPARTMENT OF TRANSPORTATION
Jason D. Peters
DEPARTMENT OF TRANSPORTATION
Director of Transportation Development, D-3
TITLE
725-030-07
PUBLIC TRANSPORTATION
12014
Page 4 of 4
Financlal Project No. 42561819401
Contract No. AR742
Agreement Date
ATTACHMENT "A"
SUPPLEMENTAL JOINT PARTICIPATION AGREEMENT
This Attachment forms an integral part of that certain Supplemental Joint Participation Agreement between
the State of Florida, Department of Transportation and Okaloosa County BOCG
302 North Wilson Street, Crestview FL 32536
dated
DESCRIPTION OF SUPPLEMENT (Include justification for cost change):
Na DOT Cost Change. Project consists of: Research and analyze security assessments and recommended measures
for security conirals, CCTV alternatives, reporting, connectivity, design and construction and installation of security and
surveillance equipment and protection hardware and software at DTS and CEW with capabilities at both airports to
include end connectivity and capabilities at VPS Operations Center. Security TSA Exit Lane Infrastructure, systems/
monitors and CCTV at VPS. Interior and perimeter wildlife and security fencing and wildlife control measures at CEW and
DTS Dasion construction and installation of a nnise barrier wall and noise control meastiras at nTsS
1 Project Cost: As Approved As Amended Net Change
$1,301,801.00 $1,301,801.00 $0.00
Total Project Cost $1,301,801.00 $1,301,801.00 $0.00
1. Fund Participation: As Approved As Amended Net Change
Department: $1,041,441.00 $1,041,441.00 $0.00
Agency: $260,360.00 $260,360.00 $0.00
$0.00 $0.00
Total Fraject Cost $1,301,801.00 $1,301,801.00 $0.00
Comments:
=
e S
