Okaloosa County BOCC — June 3, 2014 — LORD AND SON B1 — reading text
Part 3 of 4. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 61-LORD AND SON B1.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
maintenance is
required during the warranty period.
Fire Alarm—The fire alarm system will be pre-tested by Lord & Son to ensure the follow-on Fire Marshall
test will be as error-free as possible and that the final testing will show the system is fully functional, opera-
tional, and will not delay turnover. This testing is critical as we recognize personal safety in the working envi-
ronment as a key to a successful final product.
Commissioning—A properly controlled work environment is the key to the occupants being satisfied with
their new facility. Test and balance procedures will be conducted as soon as practical with the Owner’s
representative to assure all equipment is operating and performing as specified. Following approval of test
and balance report, Lord & Son will begin commissioning the HVAC system. This will be conducted with our
subcontractor, Owner’s representative and Users to validate and document proper performance.
As-Built Documents—During the life of the project, a full set of drawings are kept on-site and red-lined to
Page 10
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NeW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
incorporate any approved changes, RFls, directions or minor field adjustments. The final red-line drawings
will be reviewed by the Design Team and our Quality Control Inspector to ensure accuracy and compliance
with the project requirements. Once the red-line as-builts are completed, they will be submitted to the
Owner for approval. If required, the red-line changes will be incorporated on CADD drawings and submitted
with an electronic file for the User.
Pre-Final and Final Inspection—Twenty-one days prior to the anticipated turnover date, our on-site Quality
Control Inspector will perform a pre-final inspection and document the necessary punch list items required
for completion. This list will be provided to the Owner’s representative who can review and add to the list.
Approximately five (5) days prior to turnover, a final inspection will be conducted with the Owner and User
to check-off the previous list and identify any final requirements and punch list items. This list will be com-
pleted by turnover of the facility and a certificate of occupancy.
Page 11
ee ayers ||
a 3
& eS ee a
-2 FREE Ee
a Pa 1 R oa
=) = * iy er i
ae | 2 fo)
a | sane Sg |
| | Tm a
| Limp “e | Lum
T 1 T |
BATE:
[Dany
TER SULIDG FYaTOGe ee GUN DRIVE PORTUMD, TH 37
PRELIMINARY — NOT FOR CONSTRUCTION
nucor ies
TITLE: PRELIMINARY DRAWING
‘BUILDER
TOCATION:
>
JoBHee
4/3/2014
| Ecospan® Home
| Advantages
| Versatile
| Accessible
© | Design Inform ation
| Fire & Sound
| Go GREEN!
| Projects
| contact Us
Ecospan: Design Information
Eecosprrt
enw
COMPOSITE FLOOR SYSTEM
Design Information
Span Capability
1 | RESIDENTIAL COMMERCIAL
=z | Total load = 112 psf Total load = 152 psf
ES | Live Load = 55 psf Live Load = 95 psf
eS NC Dead Load = 42 psf NC Dead Load = 42 psf
Comp Dead Load = 15 psf Comp Dead Load = 15 psf
Depth Length
10" 250"
12" 30°0"
14" 328"
16" 37-4"
18" 390"
20" 43-4"
Notes:
1. E-series joists are typically spaced at 4. in center,
2. Shaded areas may require special chord or web members.
3. Tables assume 2 1/2" concrete above deck with 3000 psi
jconcrete strength.
Specifications: Section 05 1700 Composite Floor System
Ecospan@ Composite Floor System Installation Guide
“Ductability’
JOIST DIMENSIONS
DUCT SHAPES & ALLOWABLE SIZES
VULCRAFTIVERCO GROUP
©2012 Nucor Corporation - VulcrafVerco Group
http:/wmww.ecospan-usa.convindex_files/Pag e1069.htm
PANEL ROUND
DEPTH DISTANCE | (DIAMETER) SQUARE RECTANGULAR,
10" 19 6" ” 6"x3"
12" 19 T oe
14" 19° 3" 6"
16 24" ” ti
18 24" 10” 8"
20" 24” WwW" i
economy tHRoucH
ecology®
11
Lord & Son Construction, Inc. . . . Start Date: OSMAY14 | = Early bar | Critical bar © Finish milestone point
Data Dae: CEMA 4 Sheriff Office at Shalimar, FL Completion "Peethcron | SS Prearesstar |} Startritestone point
ES Description Orig) Early ma Tar I a | a 1 aoe 1 EF I wer r vy
a a a 2 cc ( Ee TF es a a
100 | CM Contract Award 0} O5MAY14 0] CM Contract Awar:
110 | Sheriff Construction Doc Estimate 16|osmay14 | 23May14 1d ‘Sheriff Construction Doc Estimate
120 _ | Approved Const Doc Estimate 3}26MAY14 | 28MAY14 ad Approved Const Doc Estimate
130 | Metal Building Shop Drawings 5} 05MAY14 | O9MAY14 0] Metal Building Shop Drawings Finalized
140 | Design Foundations 10 1amayi4 | 2amayi4 0 = a Design Foundations
150 | Fab & Deliver Metal Building 30|2omav14 | 10JUL14 4d| [ 1 Fab & Deliver Metal Building
160 | Rebar Shop Drawings 5] 26MAY14— | 30MAY14 fi) peas Rebar Shop Drawings 1
170 | Approve Rebar 3}.02JUN14 | O4JUN14 oO} TEE Approve Rebar }
180 | Fab & Deliver Rebar 10] 05JUN14 | 18UN14 0 Fab & Deliver Rebar |
190 | Advertise for Bids to} osmayi4 | 16MAY14 4c jaaverice for t
200 | Sheriff Final Drawings 15| 26mavi4 [13NUN14 1d Sheriff Final Drawings \
, id
210 | Sheriff CM Review Final Drawings 5] 10JUN14 | 17JUN14 Adj ; Sheriff CM Review Final Drawings 90%
220 | Sheriff Drawings Finalized 2/17JUN14 | 1QJUN14 1d 4 \ Drawings Finslized
230 | Bid Sheriff's Building 15] 19JUN14 | T1JUL14 1d} Ul Bid Sheriff's Building
840 _ | Submit Elevator t[tJuL1a foraucta | ial : j Submit Elevator
850 | Approve Elevator 5}01AUG14 | OBAUG14 1d t emma Approve Elevator
860 | Fab & Deliver Elevator 4o}osauGia [o30cT14 rr) Hy ‘ Fab & Deliver Elevator
1100. | Mobilize Sheriff's Bldg 5] 29Mav14 | O4JUN14 3d L555 Mobilize Sheriffs Bldg : R
110 | Demolition of Concrete Paving 5{05JUN14 | 11JUN14 3d p, Demolition of Concrete Paving ! t 7
1120 | Layout Foundations 2)42JUN14 | 13JUN14 3d] Clea Layout Foundations t \
1130 | Footings 5[1QUN14 | 25JUN14 | 1s ratings ! |
140 | Prep Slab On Grade 10] 27JUN14 | 11JUL14 ft) | SST Prep Slab On Grade |
1150 _| Plumbing Ril Slab On Grade afzeunra [auunta | 54 [=csed Plumbing Fl Slab On Grade ‘
1160 | Electrical Ril Slab On Grade | 26JUN14 | 08JUL14 t) Electrical R/I Slab On Grade |
1170 _| Fire Protection Ri! Slab On Grade 2) 26JUN14 | 27JUN14 &d LeciFire Protection Ril Slab On Grade '
180 | Pour Slab On Grade 3] 14JUL14 | 16JUL14 0} Pour Slab On Grade}
1190 _| Erect Pre-Engineered Bldg Frame 45] 17JUL14 | O6AUG14 0] \ oa Erect Pre-Engit Bldg Frame
1200 | Masonry Walls - Building Tie In s[o7auGia | 13UG14 4d {j= Masonry Walls - Building Tie in
1210 | Framing Roof - Bldg Tie in 5] 14AUG14 | 20AUG14 4d) 4 Fearing Roof - Blig Tie In
1220 | Roof Pre-Engineered Metal Bldg 8]07AUG14 | 18AUG14 0] [Pl RresEnginesred Metal Bldg
1230. | Prep- Slab On Metal Deck 4] 13auG14 | 18AUG14 0 im Prep- Slab On Metal Deck
1240 | Pour Stab On Metal Deck 3)igauGia | 21auGi4 | Pour Slab On Metal Deck
1250 | Metal Siding Pre-Engineered Metal 10] 20AUG14_ | O2SEP14 0 | —EEEEMetal Siding Pre-Engineered Metal Bldg
1260 | Light Gauge Metal Framing 1o| 20auG14 | 1SEP14 | Light Gauge Metal Framing
1270 | Hang & Finish Gypsum Board 10}12SEP14 | 25SEP14 2d oon bang Finish Gypsum Board
1280 | Plumbing Wall & Ceiling Rough In s/o3seP14 | oasEP14 4d |= Plumbing Wall & Ceiling Rough- In
1290 | Ductwork to] ossePt4 | 16SEP14 | awork | :
1300 | insulate Ductwork to] nsep1a | 2asEPi4 | ——— Insulate Ductwork
1310 | Electrical Wall & Ceiling Rough In to] oasept4 | 18SEP14 1d al Elecaead Wal Calling RauGh Ih
1320] Electrical Pull Conductors 10}10SEP14 | 23SEP14 1d eee Erecitcel Pull Conductors
Lord & Son Construction, Inc.
Data Date: OSMAY14
Sheriff Office at Shalimar, FL
Start Date: OSMAY14 Early bar 33 Critical bar }© Finish milestone point
Completion Date: 21NOV14
2014 Sherif Page 2A of 2a | SH Progress bar © Start milestone point
i Eg
a Beciiin ee a a
1330. | Fire Protection Rough In y2)o1seP14 | 16SEP14 | ————s ie Protaeton Rough I
1340 | Equipment Pads 4)22auGi4 | 27AUGI4 Es) SS Fauipment Pads | 1
1350 | Set HVAC Equipment 4) 28AUG14 | O2SEP14 E) Set HVAC Equ ment |
1360. | Hookup HVAC Equipment e/ossep14 | 10SEP14 bq Hookup HVAC Equipment
1370. | Start Up HVAC S}MSEP14 =| 17SEP14 5d r inn HVAC
1380 | Elevator 25] 030CT14 | o7NOV14 1d tite (RSS Stat
1390 | Prime & 1st Coat 7[2ssep14 [030cT14 ) LiL gees Prime & 151 Coat !
1400 | Door & Hardware 6 30SEP14 | 070CT14 8d PS Door & Hardware H
1410 | Hard Tite el 2ssepi4 osoctia | 13d Hard The !
1420 | Casework 5] 060CT14 | 100CT14 od = i Caseiiar i {
1430 | Acoustical Ceiling Grid 4}060CT14 | 090CT14 0} ‘=== Acoustical Ceiling Grid
1440. | Light Fixtures and Celling Devices eforocti4 | 160cT14 q [— SSS L ght Fintures and Celing Devices
1450 | Grills & Registers afosoctia | 430cT14 ‘dl ert Registers |
1460 | Acoustical Ceiling Tile 4) 140CT14 | 170CT14 1d] L PSS Acoustical Ceiling Tile
1470 | VCT & Base a] 200cT1a | 220cT14 idl i VCT & Base!
1480 | Carpet 3{230cT14 | 270cT14 1d} 1 ot Darel,
1490 | Plumbing Fixtures 2|230CT14 | 240CT14 1d) ‘4
1500 | Specialties 2}2voct14 | 2e0cT14 1d Hee
1510 | Electrical Trim el 1socT14 | 240cT1a |
1520. | Comm, FA, Security Trim 10| o7ocT14 | 2000714 ad ‘me Comm, FA, Security Trim
1530. | Finish Paint sl27octia |310cT14 | C Finish Paint
1540 | Test & Balance tof osocti4 | 210cT14 ad SEES Test & Balanch
1850 | Close Out Documents tof 1socTia | 280cT14 ed Close Out Documents
1560 | Final Clean s[osnovia [ornovia Q <a Final Clean
1570 _| Inspection & Punch Out tol toNovta | 2iNOVvi4a Q ul Inspectio
1580 | Turn Over Project oO} 21NOV14 oO} Turn Ov
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Recent Construction Management Experience
The chart below lists some of the contracts for which Lord & Son has provided or is providing
Construction Management services.
Sherwin Williams
Okaloosa County Administrative Annex
City of FWB Recreation Center
Destin Surgery Center
South Walton Boys & Girls Club
Building 810 (Gym)
Calvary Baptist Church
Deer Point Elementary School
O'Sullivan Creel Office
Beach Community Bank
Pat O’Brien’s Restaurant
O'Sullivan Creel Office
Gold’s Gym
Gold’s Gym
Cuvee Beach Bistro
Destin, FL
Shalimar, FL
Fort Walton Beach, FL
Destin, FL
Santa Rosa Beach, FL
Eglin AFB, FL
Fort Walton Beach, FL
Lynn Haven, FL
Fort Walton Beach, FL
Crestview, FL
Destin, FL
Destin, FL
Fort Walton Beach, FL
Destin, FL
Destin, FL
New Construction
Renovation
New Construction
Renovation/Addition
New Construction
Renovation
Renovation/Addition
New Construction
New Construction
New Construction
New Construction
New Construction
Renovation
New Construction
New Construction
Page 16
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
CONSTRUCTION MANAGEMENT EXPERIENCE
Addition and Renovations to Destin Surgery Center in Destin, FL
After completing the construction of the two-story, 16,000 square foot Destin Surgery Center in March 2002,
Lord & Son was selected to re-visit the building almost 10 years later to construct a new addition to the
building and perform some renovations. As construction took place in an operating ambulatory surgery
center, this project required constant monitoring of all materials and installation to ensure that all
contaminants were isolated and could not enter any sterilized areas of the building. Through the use of dust
partitions, walk-off mats, negative air equipment, and routine jobsite cleaning, Lord & Son completed the
work without any unscheduled interruptions in building operation or any contaminations. In addition, Lord &
Son held subcontractor orientations in order to familiarize everyone on the jobsite with the areas of the
facility requiring special operation procedures.
The new addition was tied to the existing building by removing an existing exterior wall. Once the exterior
wall was removed, the existing recovery room was expanded into the new addition. As the tie-in would
require the building to be shut down during that phase of construction, Lord & Son coordinated with the
building