To briefly summarize, this agreement
consolidated wastewater service in the following manner: 1) the City would no longer have a
wastewater treatment plant, but still maintain their collection system, 2) the County would
provide wastewater treatment and disposal of the City’s service area, and 3) the County would
provide up to 1.55 MGD of reclaimed water to the City’s golf course. After the construction
work was finished, the City wastewater started coming to the Arbennie Pritchett Water
Reclamation Facility (APWRF) in February 2010; likewise, reclaimed water started being
conveyed to the golf course at that time.
Feeding the 36” force main into APWRF are 3 sewer force mains (FMs): two County 20” FMs
and one City 30” FM. The two County 20” FMs are formerly effluent mains and were not
designed to convey raw wastewater. In addition, they are aging un-coated ductile iron lines
which will eventually require replacement. The pipes run approx 2.5 miles from the Garniers
Re-pump Station (old Garniers WWTP site) to the 36” APWRF influent FM.
The City’s 30” FM is an aging concrete line that has deteriorated and has about reached the end
of its useful life. In addition, it is in conflict and need of replacement because of FDOT’s new
Gap Creek Bridge. Therefore, the City is replacing their 30” FM from Hollywood Blvd to the
point of connection with the County on Roberts Blvd.
At the Aug 21, 2012 BCC meeting, the Board approved another Interlocal Agreement between
OCWS and the City of Ft. Walton Beach for cost sharing a project, which generally was
described as a 1.7-mile 36" ductile iron pipe (DIP) force main. At the same BCC meeting, the
Board approved the use of OCWS in-house construction crews for the installation of the
pipeline.
The portion of 36" sewer force main along Roberts Blvd requires a utility easement from Eglin
Air Force. The easement documents are attached, along with an aerial photo depicting the
location of the easement. County Contract Review has been completed on the attached Grant of
Packet Pg. 275
Easement, and the coordination sheet is attached.
The term of the easement is 25 years. Because this infrastructure serves OCWS and City of Fort
Walton Beach customers and not Eglin AFB, by federal regulation they have to charge fair
market value (FMV). FMV has been negotiated and determined to be an up-front lump sum
payment of $7,500 for the 25-year term. This amount will be split 50/50 between OCWS and the
City. OCWS' payment of $3,750 will be due to Eglin after the Chairman has executed the
easement, but before Eglin AFB has executed the easement. OCWS staff believes $3,750 is a
fair and reasonable amount, and that the benefit far exceeds that dollar amount.
OPTIONS: Approve or deny.
RECOMMENDATIONS: Staff recommends BCC approval for the Chairman to execute the
Air Force’s “Grant of Easement” for the Ft. Walton Beach 36" Force Main Project.
RECOMMENDED BY:
APPROVED BY:
Ernie Padgett, County Administrator
Packet Pg. 276
Packet Pg. 277
Packet Pg. 278
Packet Pg. 279
Packet Pg. 280
Packet Pg. 281
Packet Pg. 282
Document Number: FTFA-EG-2-13-004
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
FOR
EGLIN AIR FORCE BASE, FLORIDA
Standard Outgrant Easement
SAF/GCN-RPO
March 2010
Packet Pg. 283
Document Number: FTFA-EG-2-13-004
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
FOR
EGLIN AIR FORCE BASE, FLORIDA
TABLE OF CONTENTS
I. PARTIES AND PURPOSE ........................................................................................................................................................ 1
II. CONSIDERATION ................................................................................................................................................................... 1
III. TERM........................................................................................................................................................................................ 1
IV. GRANTEE ACCESS ............................................................................................................................................................... 1
V. GRANTOR’S RIGHT OF ACCESS AND INSPECTION ................................................................................................... 2
VI. GRANTOR’S RIGHT OF ACCESS FOR ENVIRONMENTAL PURPOSES ................................................................... 2
VII. GRANTOR’S REASONABLE REGULATION ................................................................................................................. 2
VIII. CONDITION OF EASEMENT AREA............................................................................................................................... 3
IX. OTHER GRANTS OF ACCESS ............................................................................................................................................. 3
X. GRANTEE’S IMPROVEMENTS ........................................................................................................................................... 3
XI. NO OBSTRUCTIONS ............................................................................................................................................................ 3
XII. GENERAL INDEMNITY ..................................................................................................................................................... 4
XIII. LIMITATION OF GRANTEE RIGHTS ........................................................................................................................... 4
XIV. INSURANCE ........................................................................................................................................................................ 4
XV. AIRFIELD CONSTRUCTION ............................................................................................................................................. 5
XVI. PRESERVATION OF CULTURAL AND NATURAL RESOURCES............................................................................ 5
XVII. GRANTEE PERMITS ........................................................................................................................................................ 5
XVIII. ENVIRONMENTAL CONDITIONS .............................................................................................................................. 5
XIX. ENVIRONMENTAL COMPLIANCE ............................................................................................................................... 5
XX. ENVIRONMENTAL USE RESTRICTIONS ...................................................................................................................... 6
XXI. HAZARDOUS MATERIALS AND HAZARDOUS WASTE........................................................................................... 6
XXII. GRANTOR ENVIRONMENTAL REMEDIATION ....................................................................................................... 6
XXIII. ENVIRONMENTAL INDEMNIFICATION .................................................................................................................. 6
XXIV. ENVIRONMENTAL LIABILITY OF THE GRANTOR .............................................................................................. 7
XXV. ABANDONMENT OR TERMINATION OF EASEMENT ............................................................................................ 7
XXVI. DAMAGE TO OR REMOVAL OF GOVERNMENT PROPERTY ............................................................................ 7
XXVII. REMOVAL OF GRANTEE IMPROVEMENTS .......................................................................................................... 8
XXVIII. REMEDIES FOR NON-COMPLIANCE ..................................................................................................................... 8
XXIX. ASSIGNMENT .................................................................................................................................................................. 8
XXX. AUTHORIZED REPRESENTATIVES AND NOTICES ................................................................................................ 9
XXXI. EXHIBITS ........................................................................................................................................................................ 11
Standard Outgrant Easement i
SAF/GCN-RPO
March 2010
Packet Pg. 284
Document Number: FTFA-EG-2-13-004
Standard Outgrant Easement i
SAF/GCN-RPO
March 2010
Packet Pg. 285
Document Number: FTFA-EG-2-13-004
DEPARTMENT OF THE AIR FORCE
GRANT OF EASEMENT
I. PARTIES AND PURPOSE
THE UNITED STATES OF AMERICA, acting by and through the Secretary of the Air
Force (the "Grantor"), under and pursuant to the authority granted in 10 U.S.C. § 2668, the
Secretary of the Air Force having determined that no more land than needed for the easement is
included herein, does hereby GRANT and CONVEY to Okaloosa County Board of County
Commissioners, Okaloosa County, Florida (Grantee), a nonexclusive easement to install, operate
and maintain an underground sewer main on, over, under, and across the property on Eglin Air
Force Base (AFB), Florida, as described in Exhibit A and depicted on Exhibit B (the
“Easement Area”). The Grantor and Grantee may be referred to as Parties or separately as a
Party.
II. CONSIDERATION
A. The sum of $3,750 and the provision of maintenance, repair, and security of the
Easement Area, and other good and valuable consideration, the receipt and sufficiency of which
is hereby acknowledged.
B. Payment is due in advance. Payment information:
CHECK INFORMATION: MAILING ADDRESS:
Paid to Account: DSSN3801DY 96 CEG/CEAF
Instrument Number: FTFA-EG-2-13-004 501 Deleon Street, Suite 100
Account Code: 47U2 Eglin Air Force Base FL 32542
Geographical Location: FTFA
C. The Grantee, at its own expense, shall record this executed easement (including
Exhibits A and B) in the public records of the county within which the easement site is located
within fourteen (14) days after receipt, and shall provide to the Grantor within ten (10) days
following the recordation a copy of the recorded easement (including Exhibits A and B) which
contains the O. R. Book and pages at which the easement is recorded.”
III. TERM
This Grant shall be for a term of 25 years