an issue for the following site plans.
The Mayor advised height limitations is not
CONDO. BEAL AND SHELL AVENUE
SITE PLAN APPROVAL FOR SHELL HARBOR
of Millennium Real Estate, llC for site
Consideration of a request by applicant Bob Hudgens Beal
mixed- use condominium development located between
plan approval for Shell Harbor a
Parkway SE, Shell Avenue SE and Second Street SEe
and swore in all individuals who
The City Attorney announced quasi-judicial proceedings
site plans.
expected to speak on one of the
the of
that the recommendation requiring windows on fa(fade
Peggy Fowler, Planner II, advised
has been removed. She explained that arbors
the commercial building facing the private drive
felt this was acceptable, as windows were not
and landscaping will be substituted and Staff
which became Exhibit 2.
critical. She distributed a drawing by the architect,
2 into the record. The Mayor announced the
Ms. Fowler entered the Staff Report and Exhibit
Staff Report into the record.
or the exhibit.
The applicant had no objections to the Staff Report
of the
Dr. Pullen questioned whether the request
had to go back to the CRA Board since one
advised the CRA Board discussed the issue
recommendations was being removed. Ms. Fowler
so it was included as a condition for
the approval of
but it was not addressed by the applicant,
and the arbor and landscaping will address the
the site plan. However, it is a minor alteration
issue.
an issue for this project.
Also discussed was the fact that height is not
there was none, the public hearing was closed.
The Mayor opened the public hearing. As
68 . 01/ 11/ 05
SHELL HARBOR CONDOS ( CONTI .
Mr. Tucker moved to approve the site plan for Shell Harbor Condominiums located
between Beal Parkway SE, Shell Avenue SE and Second Street SE, subject to the
following conditions: Recommendation is based on the application submitted by Seaside
Engineering & Surveying, Inc., project # 03- 125, dated 10/ 20/ 04, revised 11/ 10/ 04 and
12/ 6/ 04, and the architectural plans submitted by Stokes Associates Architect, Inc.,
project #04004, dated 8/ 6/ 04.
1) Prior to application for a Building Permit the following must be provided:
a) The architectural drawings shall be revised to include arbors and landscaping on
the fa~ade of the commercial building facing the private drive. I
b) A landscape plan shall be prepared by a professional landscape architect or
nurseryman, utilizing an irrigation system with well, and must be approved by CDS
staff. The plan must comply with all applicable regulations in Sections 20- 1836
through 20- 1834 of the LDC.
c) A stormwater management and maintenance plan prepared by a registered
engineer must be provided.
2) Prior to g ranting a Certificate 0 f Occupancy, condominium association documents
that provide guarantees for continued maintenance of all common areas must be
approved by the City Attorney and CDS staff.
Mr. Campbell seconded motion.
Mr. Holmes, Mr. Campbell, Dr. Pullen, and Mr. Anderson advised they attended the CRA
meeting when this item was discussed.
The Mayor called for the vote on the motion and it carried by a vote of 6 to 1 with Holmes,
Patterson, Campbell, Tucker, Covey, and Anderson in favor and Pullen opposed.
SITE PLAN APPROVAL FOR SUMMERHOUSE CONDO. MIRACLE STRIP PARKWAY
Consideration of a request by applicant Ricky Rookis of Rookis Development Company for site
plan approval for Summerhouse Condominiums, a two- building, 3D- unit condominium project,
located at 2 Miracle Strip Parkway SE and 2 Miracle Strip Parkway SW.
Ms. Fowler entered the Staff Report into the record. The Mayor announced the Staff Report into
the record.
The applicant had no objections to the Staff Report.
Ms. Fowler advised the request is for a 3D- unit condominium on Miracle Strip Parkway. She
stated the CRA had reviewed the request twice so that issues could be addressed by the
applicant.
The Mayor opened the public hearing. As there was none, the public hearing was closed.
Mr. Anderson moved to approve the site plan for the Summerhouse Condominium to be
located at 2 Miracle Strip Parkway SE and 2 Miracle Strip Parkway SW, subject to the
following conditions: Recommendation is based upon the application and site plan
developed by Walton H. Chancey & Associates Architects, P .A.,Connelly & Wicker, Inc.,
Consulting Engineers, and William H. Smith, Landscape Architect, dated August 25, 2004
Job #04330), revised 10/ 25/04 and 11/ 22/ 04.
69
01/ 11/05
SUMMERHOUSECONDOSlCONn
is complete, a cultural
1) Once demolition and/ or removal of buildings and pavement
an archaeologist. If this assessment
resources assessment shall be conducted by
will not be granted
indicates the need for further archaeological studies, a building permit
to the City for routing to
until the applicant completes the studies and submits the report
the SHPO completes its review of
the State Historic Preservation Officer ( SHPO). Once
the report{s) , the applicant will comply with
recommendations set forth by the
which m ay entail t he applicant
Department 0 f State, Division 0 f Historical Resources,
activities prior to obtaining a building
retaining an archaeologist to perform excavation
monitor all construction activities that
permit and/ or may require that an archaeologist
If archaeological findings result in a
require excavation to a depth of 18"
or greater.
shall be required to go
recommendation for any major site plan changes, the site plan
through the CRA and City Council site plan review process.
Prior to the issuance of a Building Permit a landscape plan prepared by professional
a
2)
be submitted and approved by CDS staff. The
landscape architect or nurseryman must
in Sections 20- 1836 through 20- 1834 of
plan must comply with all applicable regulations
well must be provided.
the LDC. Design for an irrigation system with a
3) Prior to granting a Certificate of Occupancy,
condominium association documents
continued maintenance of all
that provide for the boardwalk easement and guarantees
and CDS staff.
common areas must be approved by the City Attorney
located
4) Prior to granting a Certificate of Occupancy, any required driveway permits
within the FDOT righto- f- way must be executed.
Mr. Covey seconded motion.
and whether
Discussion ensued regarding the access to the boardwalk through private property
the same plans that the CRA has seen; that
it should be a condition of approval; that these are
Sites Board to look at the plans and make
at this time there are no requirements for the Historic
level to protect Air Force test
recommendations; and the height of 75 feet above mean sea
missions in the area.
are developments along the corridor being
The City Manager noted for the record that there
the proposed development, not the
discussed. She advised that the matter at hand is approving
height of the building.
the plans to ensure the buildings are less
Dr. Pullen moved to request the developer to revise
of Eglin Air Force Base.
than 75 feet above mean sea level to protect the mission
s recommendation and will not amend
his
Mr. Anderson advised he is not accepting Dr. Pullen'
with conditions.
motion to accept the site plan for the development,
as stated.
The City Attorney advised the original motion stands
Mr. Holmes, Mr. Campbell, Dr. Pullen, and Mr.
Anderson advised they attended the CRA
meeting when this item was discussed.
it carried by a vote of 5 to 2 with Holmes,
The Mayor called for the vote on the motion and
and Pullen opposed.
Campbell,Tucker, Covey, and Anderson in favor and Patterson
ATM MACHINE
SITE PLAN APPROVAL FOR FIRST CITY BANK
Consideration of a request by applicant Moore Bass Consulting for owner Beach Community
Bank ATM Facilities located at the corner of
Bank for site plan approval for Beach Community
no buildings associated with this project.
PerryAvenue SE and Eglin Parkway SEe There are