READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — September 16, 2014 — 2014 Project List- final — reading text

Part 8 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 197-2014 Project List- final.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

City of Mary 13k repairs on S. Lorraine 2014 pipes & inlets at Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $387,300.00 X No Funding 1 year Existing Y Esther Esther Drive intersections along S. and Flood Lorraine Drive Repair & replace Stormwater drainage Hurricane & Tropical underground stormwater City of Mary City of Mary 13l repairs on Sussex 2014 Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $50,250.00 X No Funding 6 months Existing Y infrastructure and grade Esther Esther Road and Flood ditch on Sussex Road Stormwater drainage Repair & replace Hurricane & Tropical City of Mary City of Mary 13m repairs at Page Bacon 2014 underground stormwater Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $81,200.00 X No Funding 6 months Existing Y Esther Esther & Joann Lane infrastructure and Flood Repair & replace Stormwater drainage underground stormwater Hurricane & Tropical City of Mary City of Mary 13n repairs at Dawn Lane 2014 pipes & inlets at Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $236,653.00 X No Funding 1 year Existing Y Esther Esther & Emory Drive intersection of Dawn Lane and Flood and Emory Drive Provide a post-storm power source for traffic signals to All Jurisdictions - Portable Generators 14a 2010 move traffic and free up All hazards yes City of Destin City of Destin City of Destin - Public Works Dept. $35,000.00 X No Funding 6 months Existing Hwy 98 is an Y for Traffic Signals emergency personnel for evacuation route other efforts Only a few traffic signals in Crestview have been upgraded to mast arms. City of Crestview Because the major and All Okaloosa Traffic Signal Upgrade 14b 2010 highways in Crestview are All hazards yes City of Crestview City of Crestview City of Crestview - Public Works Dept. $3,000,000.00 X No Funding 6 months Existing County- Hwy 85 Y to Mast Arm hurricane evacuation is a hurricane routes the mast arms are evacuation route needed to resist damage by high winds Fred Hedrick and Chester Structural Soundness Pruitt Recreation Centers Hurricane & Tropical of Existing Local Armoring Critical are utilized as storm City of Fort Walton City of Fort Walton City of Fort Walton Beach - Public City of Fort 14c 1999 Storm; and Severe Government $138,000.00 X No Funding 6 months Existing Y Facilities shelters and should be Beach Beach Works Dept. Walton Beach Storms Centers; Availability retrofitted for 140 mph wind of Public Sheltering resistance. Norriego Point is the tip of Holiday Isle and provides protection to Destin harbor. Project anticipates Permanent stabilizing or hardening the Beach Erosion; and City of Destin 15a Stabilization of 1999 point for improved storm yes City of Destin City of Destin City of Destin - Public Works Dept. $10,200,000.00 X No Funding 2 years Existing Y Storm Surge and tourist Norriego Point protection, minimizing harbor channel shoaling and to preserve habitat and recreational areas provided by the point Install 120 linear feet of Upland retaining

Download this text file with its original spacing ↓