READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 16, 2014 — 2014 Project List- final — reading text
Part 8 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 197-2014 Project List- final.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
City of Mary
13k repairs on S. Lorraine 2014 pipes & inlets at Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $387,300.00 X No Funding 1 year Existing Y
Esther Esther
Drive intersections along S. and Flood
Lorraine Drive
Repair & replace
Stormwater drainage Hurricane & Tropical
underground stormwater City of Mary City of Mary
13l repairs on Sussex 2014 Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $50,250.00 X No Funding 6 months Existing Y
infrastructure and grade Esther Esther
Road and Flood
ditch on Sussex Road
Stormwater drainage Repair & replace Hurricane & Tropical
City of Mary City of Mary
13m repairs at Page Bacon 2014 underground stormwater Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $81,200.00 X No Funding 6 months Existing Y
Esther Esther
& Joann Lane infrastructure and Flood
Repair & replace
Stormwater drainage underground stormwater Hurricane & Tropical
City of Mary City of Mary
13n repairs at Dawn Lane 2014 pipes & inlets at Storm; Severe Storms yes City of Mary Esther City of Mary Esther - Public Works $236,653.00 X No Funding 1 year Existing Y
Esther Esther
& Emory Drive intersection of Dawn Lane and Flood
and Emory Drive
Provide a post-storm power
source for traffic signals to All Jurisdictions -
Portable Generators
14a 2010 move traffic and free up All hazards yes City of Destin City of Destin City of Destin - Public Works Dept. $35,000.00 X No Funding 6 months Existing Hwy 98 is an Y
for Traffic Signals
emergency personnel for evacuation route
other efforts
Only a few traffic signals in
Crestview have been
upgraded to mast arms. City of Crestview
Because the major and All Okaloosa
Traffic Signal Upgrade
14b 2010 highways in Crestview are All hazards yes City of Crestview City of Crestview City of Crestview - Public Works Dept. $3,000,000.00 X No Funding 6 months Existing County- Hwy 85 Y
to Mast Arm
hurricane evacuation is a hurricane
routes the mast arms are evacuation route
needed to resist damage
by high winds
Fred Hedrick and Chester
Structural Soundness
Pruitt Recreation Centers
Hurricane & Tropical of Existing Local
Armoring Critical are utilized as storm City of Fort Walton City of Fort Walton City of Fort Walton Beach - Public City of Fort
14c 1999 Storm; and Severe Government $138,000.00 X No Funding 6 months Existing Y
Facilities shelters and should be Beach Beach Works Dept. Walton Beach
Storms Centers; Availability
retrofitted for 140 mph wind
of Public Sheltering
resistance.
Norriego Point is the tip of
Holiday Isle and provides
protection to Destin harbor.
Project anticipates
Permanent stabilizing or hardening the
Beach Erosion; and City of Destin
15a Stabilization of 1999 point for improved storm yes City of Destin City of Destin City of Destin - Public Works Dept. $10,200,000.00 X No Funding 2 years Existing Y
Storm Surge and tourist
Norriego Point protection, minimizing
harbor channel shoaling
and to preserve habitat and
recreational areas provided
by the point
Install 120 linear feet of
Upland retaining
