READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — September 16, 2014 — 2014 Project List- final — reading text
Part 5 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 197-2014 Project List- final.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Building Construction
Intersection Mast rated at 140 mph need to City of Fort Walton City of Fort Walton City of Fort Walton Beach - Public located on
11a 2010 All hazards and Wind; $896,000.00 X No Funding 1 year Existing Y
Arms be updated. There are six Beach Beach Works Dept. Hurricane
Communications
intersections for a total of evacuation
18 mast arms needed. routes
The Kennedy Lakes area in
NW Crestview is plagued
by low water pressures,
While the pressure is
adequate to provide water
Elevated Potable to residences, it is
City of Crestview - Water & Sewer
11b Water Storage Tank- 2010 dangerously low for fire Wildfire yes City of Crestview City of Crestview $1,000,000.00 X No Funding 270 days Existing City of Crestview Y
Dept.
Kennedy Lakes Area protection. The storage
tank is necessary to
provide additional storage
and head pressure to flight
wildfires or multiple
structure fires in this area.
Stormwater drainage
analysis and infrastructure Unincorporated
Hurricane & Tropical
Port Dixie Stormwater repair/replacement for the Okaloosa County - Public Works Okaloosa County
11c 2010 Storm; Flood; and yes Okaloosa County Okaloosa County $5,000,000.00 X No Funding 770 days Existing Y
System Repair Port Dixie drainage area to Dept. within the Port
Severe Storms
resolve regional flooding Dixie Area
and stormwater problems.
Installation of standby
generators at each of 8
existing un-interuptable
standby generators at power supply
City of
11d 8 power supply 2011 locations.Ensures All hazards yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $77,000.00 X No Funding 6 months Existing Y
Valparaiso
locations continuted operation of
cable communication
system for emergency
broadcast capabilities
E-3
Okaloosa County
2011 LMS
Appendex E
YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP
PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY
SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE
NEW COMPLETED DELETED DEFERRED
Northern Pines - Unincorporated
Regional stormwater Hurricane & Tropical
Forest Heights Okaloosa County - Public Works Okaloosa County
11e 2010 management and drainage Storm; Flood; and yes Okaloosa County Okaloosa County $5,000,000.00 X No Funding 770 days Existing Y
Drainage Dept. within the Forest
improvements. Severe Storms
Improvements Heights Area
Bryn Mawr City of Mary City of Mary
11f 2010 Flood yes City of Mary Esther City of Mary Esther $700,000.00 X No Funding 120 days Existing Y
Subdivision Drainage
