READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — September 16, 2014 — 2014 Project List- final — reading text

Part 5 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 197-2014 Project List- final.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Building Construction Intersection Mast rated at 140 mph need to City of Fort Walton City of Fort Walton City of Fort Walton Beach - Public located on 11a 2010 All hazards and Wind; $896,000.00 X No Funding 1 year Existing Y Arms be updated. There are six Beach Beach Works Dept. Hurricane Communications intersections for a total of evacuation 18 mast arms needed. routes The Kennedy Lakes area in NW Crestview is plagued by low water pressures, While the pressure is adequate to provide water Elevated Potable to residences, it is City of Crestview - Water & Sewer 11b Water Storage Tank- 2010 dangerously low for fire Wildfire yes City of Crestview City of Crestview $1,000,000.00 X No Funding 270 days Existing City of Crestview Y Dept. Kennedy Lakes Area protection. The storage tank is necessary to provide additional storage and head pressure to flight wildfires or multiple structure fires in this area. Stormwater drainage analysis and infrastructure Unincorporated Hurricane & Tropical Port Dixie Stormwater repair/replacement for the Okaloosa County - Public Works Okaloosa County 11c 2010 Storm; Flood; and yes Okaloosa County Okaloosa County $5,000,000.00 X No Funding 770 days Existing Y System Repair Port Dixie drainage area to Dept. within the Port Severe Storms resolve regional flooding Dixie Area and stormwater problems. Installation of standby generators at each of 8 existing un-interuptable standby generators at power supply City of 11d 8 power supply 2011 locations.Ensures All hazards yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $77,000.00 X No Funding 6 months Existing Y Valparaiso locations continuted operation of cable communication system for emergency broadcast capabilities E-3 Okaloosa County 2011 LMS Appendex E YEAR MITIGATION GOALS MATCH (if AGENCY RESPONSIBLE FOR ESTIMATED PROJECT STATUS IF DEFERRED, TIMEFRAME FOR MiTIGATE NEW OR HMGP PRIORITY NAME OF PROJECT PROJECT DESCRIPTION HAZARDS MITIGATED FUNDING SOURCE JURISDICTION BENEFICIARY SUBMITTED ACHIEVED Applicable) IMPLEMENTATION COST WHY COMPLETION EXISTING? ELIGIBLE NEW COMPLETED DELETED DEFERRED Northern Pines - Unincorporated Regional stormwater Hurricane & Tropical Forest Heights Okaloosa County - Public Works Okaloosa County 11e 2010 management and drainage Storm; Flood; and yes Okaloosa County Okaloosa County $5,000,000.00 X No Funding 770 days Existing Y Drainage Dept. within the Forest improvements. Severe Storms Improvements Heights Area Bryn Mawr City of Mary City of Mary 11f 2010 Flood yes City of Mary Esther City of Mary Esther $700,000.00 X No Funding 120 days Existing Y Subdivision Drainage

Download this text file with its original spacing ↓