Dept. $30,000.00 X No Funding 120 days Existing City of Laurel Hill Y
accommodate stormwater
Severe Storms
replace deteriorated metal
Replace culverts and Flood; Hurricane &
culvert pipes and re-
6a swale system in 2014 Tropical Storm; and yes city of Destin City of Destin City of Destin - Public Works $750,000.00 X No Funding 1 year Existing City of Destin Y
establish the roadside
Indian Bayou S/D Severe Storms
swale system
There are several
properties, including
concrete masonry unit
houses built with slab on
grade, which flood during Flood; Hurricane &
Repetitive Loss Existing Building
storm events. Due to this Tropical Storm; Severe City of Fort Walton City of Fort Walton City of Fort
6b Relocation and/or 1999 Mitigation in Flood- City of Fort Walton Beach $2,000,000.00 + X No Funding 18 months Existing Y
type of construction, Storms and Storm Beach Beach Walton Beach
Acquisition prone locations
elevation is not an Surge
alternative. The structures
should be relocated or
acquired by the City to
prevent future losses.
Flood; Hurricane &
Stormwater swales for establish the roadside
6c 2014 Tropical Storm; and yes City of Destin City of Destin City of Destin - Public Works $300,000.00 X No Funding 1 year Existing City of Destin Y
Calhoun Avenue swale system for this area
Severe Storms
Installation of new high
efficency .2 million
Flood; Hurricane &
High efficiency .2 gallon/day lift station.
Tropical Storm; Severe City of
7a million gal/day lift at 2011 Current lift at ation handles yes City of Valparaiso City of Valparaiso City of Valparaiso - Public Works Dept $700,000.00 X No Funding 1 year Existing Y
Storms and Storm Valparaiso
ation 50% of all sewage, is
Surge
located in the flood zone,
and is obsolete
Hurricane & Tropical
Storm; Flood; Severe
Town of
7b Warning Siren 2010 For all emergency warnings Storms; Storm Surge; yes Town of Shalimar Town of Shalimar Town of Shalimar $30,000.00 X No Funding 120 days Existing Y
Shalimar
Heat Wave and
Drought; and Wildfire
A portion of Arena Road,
an unimproved roadway,
holds water during wet
Hurricane & Tropical
Arena Road Drainage periods and floods during
8a 2010 Storm; Flood; and yes City of Crestview City of Crestview City of Crestview - Public Works Dept. $51,000.00 X No Funding 90 days Existing City of Crestview Y
Improvements high rainfall events. This
Severe Storms
project would pipe water
from the road and direct it
to a retention pond.
Unincorporated
Lift Station is old and in the
Hurricane & Tropical Okaloosa County
floodplain. New lift station
Beal Street Lift Station Storm; Flood; severe Okaloosa County - Water & Sewer within the
8b 2010 needs to be in the same yes Okaloosa County Okaloosa County $600,000.00 X No Funding 18 months Existing Y
Relocation storms; and Storm Dept. Okaloosa County
vicinity, at a higher
Surge Water & Sewer
elevation.
Service Area
E-2
Okaloosa County
2011 LMS
Appendex E
YEAR MITIGATION GOALS