TASK ORDER APPROVAL FORM
contract #; C08 -(683-4F3-/52-
TASK ORDER #: kz
. ov
TASK ORDER AMOUNT: §. [46, vio.
OFFERED BY CONSULTANT:
AVCLON, EMC.
FIRM'S NAME
Vikoi- C, “LEE” Les PE.
REPRESENTATIVE'S PRINTED E
UV file—
SIGNATURE WA
REciol ar. Lash clr Yf4/13
TILE DATE
RECOMMENDED FOR APPROVAL APPROVED BY OKALOOSA COUNTY
(Department Director) (Per Purchasing Manual)
* — $25,000 or less approved by ?urchasing Director
« Between $25,001 and $50,000 approved by
Purchasing Director and County Acministrator
¢ In excess of $50,000 aoproved by the Board.
Ze
“SIGNATURE PURCHASING DIRECTOR
chads Dvedke Off 09-11
TITLE DATE
yA ZS
DATE 7 4
COUNTY ADMINISTRATOR (if applicable) CHAIRMAN (if applicable)
DATE DATE
56
TASK ORDER
Eglin Air Force Base ARFF Development
Professional Design, Permitting, and Bidding Phase Services
Eglin Air Force Base, Florida
Task Order No.
AVCON Project No. 2012.050.09
AVCON, INC., a Florida Corporation (hereinafter “CONSULTANT”) agrees to perform and
complete the following services (hereinafter “Services”) for Okaloosa County Board of County
Commissioners (hereinafter “CLIENT”), in accordance with the terms and conditions of the
Agreement for Professional Architectural, Engineering, and Aviation Planning Services (Contract
No.: C08-1683-AP3-152), dated September 16, 2008, all of which terms and conditions are
incorporated herein by reference.
1. Task Location: Eglin Air Force Base—Okaloosa County, Florida
2. Task Name: Eglin Air Force Base ARFF Development
3. Task Description/Scope of Services: CONSULTANT sshall perform professional design,
permitting, and bidding phase services contained in Exhibit A and attached hereto.
4. Compensation: The total maximum project budget is One-Hundred Ninety-Eight Thousand,
Nine-Hundred Thirty-Five and 00/100 dollars ($198,935.00) as outlined below:
All design, permitting, and bidding phase services performed under Tasks I and II
shall be compensated for on a Lump Sum basis. The Lump Sum fee shall be One-
Hundred Forty-Six Thousand, Three Hundred Twenty-Five and 00/100 dollars
($146,325.00 Lump Sum) and shall include all charges required to perform the
work specified. Progress payments shall be made monthly and shall be by an
estimate of the percent complete in accordance with the project progress.
All subconsultant services performed under Task III shall be compensated on a
Not-To-Exceed (time and materials) basis. The Not-To-Exceed limit for services
performed under Task III shall be Fifty-Two Thousand, Six-Hundred Ten and
00/100 dollars ($52,610.00 Not-To-Exceed). CONSULTANT shall be
compensated based on actual expenses incurred. Progress payments shall be made
monthly.
5. Schedule: A schedule of 120 calendar days is anticipated from the date of the project
Notice-To-Proceed (NTP) to prepare a set of 100% design documents for agency
review. For any unreasonable delays beyond the control of AVCON in
obtaining required materials or reviews to be provided by others, the
anticipated design schedule shall be extended an equivalent number of
days. Bidding phase services shall be performed in accordance with the
construction schedules mutually established by the County and AVCON.
Task Order: Eglin Air Force Base ARFF Development Page | of 2
6. Deliverables: Deliverables shall include the following:
Task I — Design Documents and Permitting Services
Three (3) 10% Concept Design Layout for Review
Minutes from 10% Concept Design Layout Review Meeting
Three (3) 90% sets of Design Drawings for Review
Minutes from 90% Design Review Meeting
Three (3) Copies of Engineer’s Report
Opinion of Probable Construction Cost
Notes from QA/QC Review of 100% Design Documents
Three (3) copies of 100% Design Documents
Five (5) copies of Release for Bid Documents
SRS AGUS pier
Task II — Bidding and Award
1. Minutes from Pre-Bid Conference
2. One (1) copy of Bid Tabulation and Recommendation of Award
3. Five (5) sets of Conformed Documents
7. Other Considerations: Services of the CONSULTANT shall be under the direction of Mr.
Tracy Stage, A.A.E. of Okaloosa County Airports.
Accepted by:
CLIENT: CONSULTANT:
Okaloosa County Board of AVCON, INC.
County Commissioners
fle—
V4
By: By:
Printed Name: Printed Name: __ Virgil C. “Lee” Lewis, P.E.
Title: Title: Regional Manager
Date:
Task Order: Eglin Air Force Base ARFF Development Page 2 of 2
EXHIBIT “A”
SCOPE OF SERVICES - AVCON, INC.
Professional Design, Permitting, and Bidding Phase Services
April 8, 2013
Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
SECTION A: PURPOSE
The purpose of this project is to develop construction drawings, permit the project through Eglin Air Force
Base and the Northwest Florida Water Management District (NWFWMD), and coordinate bids with potential
contractors for the Eglin Air Force Base ARFF Development. This scope of work details the design,
permitting, and bidding phase services to be performed by AVCON, INC. for this project.
The project tasks identified for this contract generally include the following elements:
¢ Coordination with Okaloosa County Airports staff, Eglin Air Force Base representatives and
permitting agencies throughout the design and construction phases;
e Preparation of design drawings and specifications through 100% for the project limits;
e Design of the project site includes design of utility systems, stormwater management
facilities, pavements, building and related items;
e Preparation of permit applications for Eglin Air Force Base and coordination with the
Northwest Florida Water Management District; and
e Assistance to the Owner during the bidding phase
This design shall generally include an approximately 8,000 sf Airport Rescue and Fire Fighting (ARFF) on a
4.5 acre parcel on Eglin Air Force Base including up to three truck bays with associated truck drive-through
pavements, vehicular parking lot, utility design and stormwater management facilities. This design shall be in
compliance with FAA AC 150/5210-15A, ARFF Station Building Design.
SECTION B: DESCRIPTION OF TASKS
The following elements describe the individual services to be provided as part of this work effort.
Task I: Design Documents and Permitting Services (Lump Sum)
1. Coordinate with Okaloosa County Airports Department: AVCON shall coordinate with Okaloosa
County Airports to develop design objectives and ensure that the design is in accordance with airport
goals.
2. Kick-Off Meeting and Site Review: AVCON shall participate in a kick-off meeting with the County
to review the project approach, future tenant coordination requirements, agency coordination
requirements, and details of the project. AVCON shall review the site to observe existing conditions
and document observed features impacting the improvements.
3. Coordinate with Eglin Air Force Base Planning and Programming Department: AVCON shall
coordinate with Eglin Air Force Base Planning and Programming Department to ensure that the design
is in accordance with Eglin Air Force Base design standards.
Page 1 of 7
SCOPE OF SERVICES — AVCON, INC.
Eglin Air Force Base ARFF Development
4.
10.
11.
12.
13.
14.
Coordinate Building Design with Architect: AVCON shall coordinate the project schedule,
building layout requirements, owner comments, and submittals with the architect. This task includes
review of interfaces between the architectural drawings and the MEPF systems to ensure building
continuity. This task shall assume two hours of coordination per week.
Coordinate with Eglin Air Force Base Fire Department: AVCON shall coordinate with Eglin Air
Force Base Fire Department to define key design objectives for the building and site layout and ensure
that the design meets the fire departments operational needs.
Coordinate Site and Topographical Survey: AVCON shall coordinate a site survey with a qualified
sub-consultant. The topographic and project limit surveys shall include topographic information,
utilities, project limits, and other associated information.
Coordinate with Geotechnical Engineer: AVCON shall coordinate with geotechnical engineering
subconsultant to facilitate geotechnical testing. AVCON shall review and shall be responsible for the
deliverables of the subconsultant as they pertain to the completion of the design work. Geotechnical
tests shall be performed to analyze soil conditions and other site characteristics required for the design
of the building structure, parking lot pavements, and stormwater infrastructure.
Attend Northwest Florida Water Management District NWFWMD) Pre-Application Meeting:
AVCON shall meet with the NWFWMD to review the proposed project and the specific
Environmental Resource Permit (ERP) Requirements.
Coordinate with Eglin Air Force Base Water and Sewer Department: AVCON shall coordinate
with Eglin Air Force Base Water and Sewer Departments to obtain information regarding the location
and size of existing water and sewer lines to serve the proposed site and coordinate structures
necessary to provide service to the proposed facility.
Coordinate with Eglin Air Force Base Stormwater Department: AVCON shall coordinate with
Eglin Air Force Base Stormwater Department to define design parameters and permit requirements
based on the guidelines outline for the Northwest Florida Water Management District.
Coordinate with Power and Communications Providers: AVCON shall coordinate with power
and communications providers to identify the location of existing facilities and coordinate design of
proposed improvements.
Develop 10% Concept Design Layout: AVCON shall prepare a conceptual layout which will depict
the building size and location, preliminary floor plan layout, parking lot and drive-through pavements,
and utility locations.
Host Conceptual Design Meeting, prepare minutes: AVCON shall meet with Okaloosa County
Airports, Eglin Air Force Base Planning and Programming, Eglin Air Force Base Fire Department,
and Eglin Air Force Base Fire Inspector to review the 10% Conceptual Design layout. AVCON will
incorporate one round of review comments from this meeting into the concept design layout. The
concept design layout shall be approved by the County prior to proceeding to 90% design drawings.
Develop 90% Design Documents: AVCON shall perform design of the construction plans through
90% design development. Drawings shall be developed in AutoCAD format. The 90% design
drawings are anticipated to include the following design elements:
Page 2 of 7
SCOPE OF SERVICES — AVCON, INC.
Eglin Air Force Base ARFF Development
15.
16.
17.
18.
19,
Structural Sheets:
a. Cover Sheet
b. General Notes - Foundation Plan
c. Summary of Quantities - Building Sections
d. Survey, Ex. Conditions, & Erosion Control Plan - Structural Details
e. Site and Geometry Plan Mechanical Sheets
f. Grading and Drainage Plan and Profiles Electrical Sheets:
g. Earthwork Cross Sections - Riser Diagram
h. Utility Plan - Lighting Plan and Schedule
i. Sod and Fence Plan - Power Systems
j. Sanitary Sewer Profiles Plumbing Sheets:
k. Lift Station Design - Schedules and Details
1. Oil/Water Separator Plan and Details - Plumbing Floor Plan
m. Typical Pavement Sections - Water Riser Diagrams
Pavement Marking Plan
Miscellaneous Details
Fire Protection Sheets:
- Schedules and Details
- Fire Protection Floor Plan
- Fire Protection Floor Plan
Architectural Sheets:
- Floor Plan
- Reflected Ceiling Plan
- Roof Plan and Details
- Elevations
- Building Sections and Details
- Wall Sections and Details
- Details and Finish Schedule
- Life Safety Plan
Prepare 90% Technical Specifications: AVCON shall prepare 90% project technical specifications
for the proposed improvements.
Coordinate 90% Design Documents with Eglin Air Force Base Fire Inspector: AVCON shall
coordinate with the Eglin Air Force Base Fire Inspector to confirm the fire protection design
assumptions for the 90% design drawings for the facility and incorporate design comments.
Conduct