READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — May 4, 2013 — Action Item Printout — reading text

Part 1 of 1. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 64-Action Item Printout.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

BOARD OF COUNTY COMMISSIONERS AGENDA REQUEST DATE: April 2, 2013 TO: Honorable Chairman and Members of the Board FROM: John Hofstad SUBJECT: State Line Road - Project Update & Material Change Request DEPARTMENT: Public Works BCC DISTRICT: One STATEMENT OF ISSUE: Staff is requesting Board approval to modify this road paving project from Hot Mix Asphalt to Asphalt Millings. BACKGROUND: As part of the 2012/2013 CIP budget, the paving of State Line Road was approved for an estimated total of $100,000. As the design work has proceeded, the location of the State line relative to the roadway has been mapped and it has become clear that there is not sufficient room to shift the paving of the roadway so that it will remain within the boundaries of Okaloosa County. Staff approached adjacent landowners for right of way donation, but was unsuccessful in obtaining right of way for the entire road alignment. Additionally, Staff approached Covington County to see if a joint project was feasible which would allow more room for drainage and centering the roadway in both Counties. As with many local municipalities, Covington County is not in position to assist with the project at this time. Based on the lack of available right of way to shift the roadway, the lack of space to provide for drainage to the extent desired for a formally paved road, and the lack of available assistance from the neighboring municipality, Staff proposes to modify the project to a surface made from Asphalt Millings instead of Hot Mix Asphalt. This change will result in a decrease in the estimated cost for the roadway of approximately $40,000; however, no budget transfers out of the project are requested at this time. OPTIONS: Approve/Disapprove. RECOMMENDATIONS: Staff recommends approval to apply asphalt millings in lieu of hot mix asphalt paving as a means to economically complete the project given the constraints that have been encountered. RECOMMENDED BY: APPROVED BY: James D. Curry, County Administrator

Download this text file with its original spacing ↓