READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 12-24-2010 Regular — reading text
Part 6 of 44. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25199-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
m
v
CL ~ Q- O
H Co a)
o V1 3--- C
U ral
U
0 O Z Q
U)
y*
fA n -- --
ym C6 •
a
Q'
Act
s o
rV rw! C4
t
LU
I Packet Pg. 11
7. 1
City Council of Fort Walton Beach
CITY MANAGER
MEMORANDUM
To:
Robert T. Mearns, City Manager
From: Carole Jones, Executive Assistant
Date: December 14, 2010
Subject: Approval of Agenda
SIGNATURE BLOCK:
Carole Jones Completed 12/ 09/ 2010 11: 29 AM
Carole Jones Completed 12/ 09/ 2010 11: 29 AM
City Manager Completed 12/ 09/ 2010 11: 30 AM
City Council Pending
Packet Pg. 12
8. 2
City Council of Fort Walton Beach
ENGINEERING SERVICES
MEMORANDUM
To: Robert T. Mearns, City Manager
From: Michael Beedie, City Engineer
Date: December 14, 2010
Subject: FDOT Maintenance Agreement for ROW on Eglin Pkwy
L BACKGROUND:
1. 1. The property owner at 2 Eglin Parkway NE has applied for a CRA Matching Streetscape
Grant and submitted a permit application to install brick pavers along Hollywood
Boulevard and Eglin Parkway in Fort Walton Beach.
1. 2. The Florida Department of Transportation ( FDOT) requires the City to enter into an
agreement to facilitate the installation, maintenance, ongoing upkeep, removal, or
replacement of any sidewalk improvements in the FDOT right -of w
- ay along a state road.
2. DISCUSSION:
2. 1. The property owner at 2 Eglin Parkway NE has applied for an FDOT permit to install
brick pavers in the right -of w
- ay of Eglin Parkway NE (State Road 85).
2. 2. A maintenance agreement between the City and FDOT must be executed in order to allow
the installation of the pavers on the FDOT right -of w
- ay.
2. 3. The City will enter into a separate, similar agreement with the property owner requiring
the property owner to maintain the sidewalk improvements in accordance with FDOT
standards and the CRA Matching Streetscape Grant Program.
3. FINANCIAL INFORMATION:
3. 1. There is no financial impact from executing the maintenance agreement with FDOT.
After completion of the project and execution of a similar maintenance agreement
between the City and the property owner, the property owner may be eligible for up to
10,000 in matching streetscape grant funds from the CRA for the improvements along
the Eglin Parkway NE right -of w
- ay.
4. RECOMMENDATION:
4. 1. Staff recommends that City Council authorize the City Manager to execute the FDOT
sidewalk maintenance agreement for improvements along the Eglin Parkway NE right -of-
way in front of 2 Eglin Parkway NE.
ATTACHMENTS:
FDOT Maint Agreement ( PDF)
SIGNATURE BLOCK:
Michael Beedie Completed 12/ 09/ 2010 10: 39 AM
Packet Pg. 13
8. 2
City Council of Fort Walton Beach
ENGINEERING SERVICES
MEMORANDUM
To: Robert T. Mearns, City Manager
From: Michael Beedie, City Engineer
Date: December 14, 2010
Subject:
FDOT Maintenance Agreement for ROW on Eglin Pkwy
City Attorney Completed 12/ 09/ 2010 11: 23 AM
Carole Jones Completed 12/ 09/ 2010 11: 06 AM
City Manager Completed 12/ 09/ 2010 11: 15 AM
City Council Pending
Packet Pg. 14
8. 2.a
HIGHWAY LANDSCAPE MAINTENANCE MEMORANDUM OF AGREEMENT
THIS AGREEMENT, made and entered into on this day of ,
20 , by and between the STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION,
a component agency of the State of Florida, hereinafter called the " Department" and THE CITY
OF FORT WALTON BEACH, FLORIDA, a political subdivision of the State of Florida,
existing under the Laws of Florida, hereinafter called the " City."
WITNESSETH
WHEREAS, the Department owns State Road 85 in Okaloosa County, Florida right -of-
way, and more specifically for this Agreement the " Project Highway Area" will be that area
located between the west curb of State Road 85 and the west side of the State Road 85 right -of-
way located between Mile Post 0. 754 and Mile Post 0. 822 in Okaloosa County, Florida; and
WHEREAS, the Department and the City are of the opinion that the Project Highway
Area should have the sidewalk replaced, necessary to improve and enhance the aesthetic quality
of the Project Highway Area; and
WHEREAS, the City shall maintain the Project Highway Area by performing litter
removal and sidewalk maintenance.
NOW THEREFORE, for and in consideration of the mutual benefits that flow each to the
other, the parties covenant and agree as follows:
1. Until such time as the improvements are removed from the Project Highway
Area, pursuant to Paragraphs 3 and 5 hereof, the City shall at all times maintain the Project
Highway Area in a reasonable manner and with due care in accordance with all applicable
Department guidelines, standards and procedures. Specifically, the City agrees to maintain the
public sidewalk and keep the litter removed from the Project Highway Area.
2. Maintenance of the Project Highway Area shall be subject to periodic inspections
by the Department. In the event that any of the aforementioned responsibilities are not carried
out or are otherwise determined by the Department to be not in conformance with the
Department, in addition to its right of termination under Paragraph 4( a), may, at its option,
perform any necessary maintenance without need of any prior notice and charge the cost thereof
to the City.
1
Packet Pg. 15
8.2.a
3. It is understood between the parties hereto that any or all of the improvements in
the Project Highway Area may be removed, relocated or adjusted at any time in the future as
determined to be necessary by the Department in order that the adjacent state road may be
widened,
altered or otherwise changed to meet with the future criteria or planning of the
Department. The City shall be ;given notice regarding such removal, relocation or adjustment
and shall be allowed sixty ( 60) days to remove all or part of the improvements in the Project
Highway Area at its own cost. The City will own that part of the improvements it removes from
the Project Highway Area. After the sixty (60) day removal period, if the City has not removed,
relocated or adjusted the improvements, the Department will become the owner of the
unremoved portion of the Project Highway Area and the Department then may remove, relocate
or adjust the Project Highway Area as it deems best, with the City being responsible for the cost
incurred for the removal of the Project Highway Area.
4.
This agreement shall be terminated under any one of the following conditions:
a) By the Department, if the City fails to perform its duties under this
Agreement following fifteen ( 15) days written notice.
b) By either party following sixty (60) calendar days written notice.
5. In the event this Agreement is terminated in accordance with Paragraph 4, the
City shall have sixty (60) days after the date upon which this
