READ ALONGSIDE THE SOURCE

Fort Walton Beach Council agenda — 12-24-2010 Regular — reading text

Part 35 of 44. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-25199-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

costs for additional treatment facilities, and will incur an estimated $ 0. 4 to $ 1. 3 billion dollars per year more in increased operating costs. This corresponds to tens of billions of dollars in costs passed down to approximately three quarters of the individual citizens and businesses in the State of Florida. In addition, the treatment technologies needed to achieve these limits will potentially use almost 5 percent of the total electric power generating capacity in the State of Florida and contribute over 17. 4 million tons of carbon dioxide ( CO2) emissions per year. r_ According to the Florida Department of Environmental Protection (FDEP), there are 0 CL a approximately 2, 100, permitted domestic wastewater facilities in the State with a total treatment capacity of about 2. 4 billion gallons per day, approximately half of which discharge effluent to Z Z surface waters. FDEP reported in 2005 that approximately 64% of Florida' s population is served by central sewer systems that feed these treatment facilities. Florida' s total population is in a E excess of 18 million residents according to the US Census Bureau. Based on these figures, s U approximately 12 m=illion citizens of Florida are served by permitted wastewater treatment Q facilities that will be impacted by the proposed NNC. Required facility upgrades to treat the 2. 4 billion gallons of wastewater per day to the new standards would result in a cost of approximately $ 1. 6 to $ 3. 3 billion dollars per year over the next 30 years in addition to current treatment costs. Considering the interest paid on bonds required to fund these improvements, the State' s wastewater utilities are facing a $ 47. 6 to $ 98. 7 billion dollar price tag to meet the proposed nutrient criteria over the next 30 years. These figures do not account for the corresponding increase in operating costs. We estimate that annual user fees for customers served by the impacted facilities will increase by an average of $673 to $ 726 Carollo Engineers 2 Packet Pg. 111 14.1. c per year in total. Table 1 summarizes the potential cost to Florida and the average individual household. This paper addresses the anticipated costs for Florida utilities to be in compliance with EPA - promulgated numeric nutrient criteria; the treatment technologies available to achieve the proposed criteria; and lastly, the additional $ 673 to $ 726 in yearly costs to customers should these regulations be adopted. Table 1 Summary of Estimated Project Costs and the Estimated Average Increase in Annual Sewer Rates for the State of Florida to Implement Numeric Nutrient Criteria. Increase in Annual Debt Annual yearly Sewer Project Cost' Rate Increase Service Operating Costs3 per Customer Florida Facilities with NPDES 24540010009000 196000000 433, 000,000 673 Permits5 All Florida 5 50, 700, 000, 000 3, 300, 000, 000 1133090005000 726 Facilities Notes: 1. Project costs include estimated construction costs plus contingencies, administrative, legal, engineering and financing costs. Estimates also assume all private facilities must be upgraded to provide advanced wastewater treatment, microfiltration, and reverse osmosis with concentrate drying with landfill disposal. Assumes public facilities with deep wells will construct new deep wells for concentrate disposal. All other public facilities assumed to construct facilities for concentrate drying. 2. Annual debt service based on 30 -year amortization schedule and 5% interest. 3. Assumes current flow is 50% of design flow, and that this is representative of "actual" usage of the plant. Capital upgrades will be required for the entire design flow, while operating costs are based on actual usage. O 4. a Average cost for public and private systems. Customer size estimated at 2. 1 persons per household based on US Census information. 5. The range of project costs was based on two scenarios. The lower project cost assumes that only surface water dischargers ( e. g. assumed to be plants with NPDES permits) would be required to comply with the proposed nutrient criteria. The higher project cost assumes that all Florida Z plants will be required to comply with the proposed nutrient criteria. Z E t v ca r Q Carollo Engineers 3 Packet Pg. 112 14.1. c EXISTING AND PROPOSED NUTRIENT STANDARDS Florida' s water reclamation plants already operate within a complex system of water quality regulations that are among the most stringent in the world. Currently, the highest level of treatment provided by Florida wastewater treatment plants is Advanced Wastewater Treatment AWT). In Florida, the term " AWT" is often used to refer to wastewater treatment that produces a reclaimed water achieving standards set out in section 403. 086( 4), Florida Statutes, i.e. reclaimed water containing no more than 5 mg/ L of carbonaceous five -day biochemical oxygen demand ( cBOD5), 5 mg /L total suspended solids ( TSS), 3 mg /L TN, and 1 mg /L TP. According to the proposed consent decree between EPA and a coalition of environmental groups, EPA is to propose NNC for fresh waters in Florida in January 2010 and marine waters by January 2011. NNC proposed by FDEP in June 2008 would drop the TN limit from 3. 0 mg /L to 0. 82 — 1. 73 mg /L and TP limits from 1. 0 mg /L down to 0.069 —0.415 mg /L. Based on review comments from EPA on the FDEP NNC, the actual values for EPA' s NNC are expected to be lower than the NNC proposed by the FDEP. While these proposed changes might seem small, the new NNC are at ( for TP) or below ( for TN) the concentrations achievable with proven nutrient removal technologies now in full -scale use at municipal wastewater plants. Table 2 allows a comparison. of the current standards for secondary and AWT standards with the proposed NNC standards. The very low concentration criteria on TN and TP being proposed can be met, although at significant cost, by adding additional treatment processes at the end of a Florida advanced wastewater treatment ( AWT) plant. AWT as currently practiced will not provide consistent r 0 compliance with the proposed NNC, and additional technologies must be employed. CL a v Table 2 Comparison of Maximum Pollutant Concentrations Allowed by Water Z Z Reclamation Standards LiMitS2 Pollutant AWT Proposed Numeric c Secondary Limits a Limits3 Nutrient E r cBOD5, mg /L 20 -30

Download this text file with its original spacing ↓