READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 12-24-2010 Regular — reading text
Part 34 of 44. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-25199-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
environment. It is because of this obligation to our
ratepayers that we have such significant concern regarding EPA' s decision to impose federal numeric
nutrient criteria on Floridians. EPA' s, approach to developing numeric nutrient standards has serious
scientific flaws that will lead to arbitrary standards creating drastic economic consequences for
Floridians.
According to technical and economic analysis performed by Carollo Engineers in the enclosed
whitepaper, federal numeric nutrient criteria for Florida surface waters will cause wastewater utility
rates to double on avera!'re across the -State. Florida municipal wastewater treatment utilities will spend
an estimated 524.4 to $ 50. 7 billion in capital costs for additional treatment facilities and incur an
estimated $ 0. 4 to $ 1. 3 billion dollars per year in additional operating costs.
1 These cost estimates were calculated using draft numeric nutrient criteria released by the Florida Department of
Environmental Protection In July 2009. The Department developed its draft criteria using a variation of EPA' s statistical
approach to deriving nutrient criteria, yet in an open letter dated September 16, 2009. EPA criticized the Department' s
criteria as not being adequately protective of downstream waters.
o (
Vd3 mieBV }insme-1 ui uoped' OlVed : 0600 podeU ONN Wau1143e44v
TZ o
r'
e
as
CL
EPA publicly justifies its intervention into Florida' s water quality standards program based on the
occurrence of algal blooms and other periodic nutrient problems in some Florida waters. However,
a
statewide federal numeric nutrient criteria are not the solution to this problem. Algal blooms violate
Florida' s existing nutrient standards, and Florida' s Total Maximum Daily Load (TMDL) program is
designed specifically to bring these waters back into compliance with Florida law. EPA' s decision to
promulgate federal standards for Florida waters is in direct contradiction to the state primacy envisioned
by the Clean Water Act.
We ask that you join the FWEA Utility Council in opposing this unneeded federal intervention into state
water policy. Floridians deserve to maintain their own science -based nutrient water quality standards
program, which protects state water ecosystems and protects utility ratepayers from the economic
burdens of unsound federal regulatory policy.
If you have any questions or concerns regarding this letter or the attached report, please contact Paul
Steinbrecher, the FWEA Utility Council Vice President and Numeric Nutrient Criteria Issue Chair, at
904) 665 -6827.
Encl:
Technologies to ,Weer Numeric Nutrient Criteria at Florida' s l7on7estic Water Reelaination
Facllltles
CC:
Charles Bronson, Commissioner, Florida Department of Agriculture and Consumer Services
Bill McCollum, Florida Attorney General
Alex Sink, Chief Financial Officer, Florida Department of Financial Services
Jeff Atwater, President, Florida Senate
Larry Cretul, Speaker, Florida House of Representatives
Michael Sole, Secretary, Florida Department of Environmental Protection
Representative Trudi Williams, Chair, Agriculture & Natural Resources Policy Committee
Gary Williams, Executive Director, Florida Rural Water Association
Dominic Calabro, President, Florida TaxWatch
David Childs, Hopping Green & Sams
14.1. c
TECHNOLOGIES TO MEET NUMERIC
NUTRIENT CRITERIA AT FLORIDA' S
DOMESTIC WATER RECLAMATION
FACILITIES
November 18, 2009
Packet Pg. 109
14. 1. c
Table of Contents
ExecutiveSummary ........................................................................................... ..............................
2
Existing and Proposed Nutrient Standards ...... ...............................
Current Nutrient Removal Technology ............................................................. ..............................
5
Additional Technologies to Meet Proposed Numeric Nutrient Criteria ............ ..............................
5
Challenges Associated with Reverse Osmosis Systems .................................... .............................. 7
Q
Costs to Meet the Numeric Nutrient Criteria a
W
ASpecific Case Study ........................................................................... .............................. 8
c
TheBig Picture ...................................................................................... ..............................9
Sampleof Utilities ................................................................................ .............................
10 Q
Conclusions .................. 11 3
J
C
O
p
cv
to
a
0
rn
0
O
a
v
U
Z
Z
m
E
t
v
cv
Q
Carollo Engineers 1
Packet Pg. 110
14.1. c
TECHNOLOGIES TO MEET NUMERIC NUTRIENT
CRITERIA AT FLORIDA' S DOMESTIC WATER
RECLAMTION FACILITIES
EXECUTIVE SUMMARY
The consent decree between the US Environmental Protection Agency (EPA) and a coalition of
environmental groups over the need to set numeric nutrient criteria (NNC) for surface waters in
the State of Florida will have severe consequences for Florida' s wastewater utilities and the
customers they serve. If the expected NNC to be proposed by EPA are implemented in the state' s
water quality regulations, all Florida wastewater facilities that discharge reclaimed water to
rivers, streams, lakes and estuaries will likely be required to meet new, very low limits on the
discharge of total nitrogen (TN) a=rid total phosphorus ( TP). These new limits are anticipated to
require a reduction in the current discharge of TN by 40 to 80% and TP by 90 to 95 %.
Should the proposed numeric nutrient criteria become incorporated in the discharge permits for
these treatment plants, Florida utilities will spend an estimated $ 24.4 to $ 50. 7 billion in capital
