READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2024-18 Authorizing $48,400 to FDOT for Eglin Pkwy Improvements — reading text
Part 27 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-41913-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
62,43 f/ I' 31 + 44,80 ®• d
76.89, LT.
50.00' 4T. AAI
I 09, er' L).
52_69
50. 00' LT?
1' EDGE OF PAVEMENT
EXIST + 51,02 + 66.49
c
37J9 LT, 56.50 LT.
SURVEY SR 8.5
33F
HJ
i f'A} TF1--
r D _ - .. R . _
8 Ca '' - "
ti• I '
iFtllaLli-
92
91
99 m FG1141 NE -
9 _` RrrSY ff
r.r. 4r4r R.R.} }
oo
50.50. 00'00' RT.RT. oo++ 28342834
-- - .--- - .-
BgfD):::
BgfD)::: ss cc: :
3.3. 1717
11 08'08' 177.177.
`- `- 50.50. 007007 AT.AT.
ss
39363936 82.82. 7474
grmgrm
EXIST. RAY 79.79. 9090 RTRT
——
1+ EDGEEDGE OFOF PAYEMENT PAYEMENT 57195719 RVRV
SueDlvtSmN Exrsr. RM NN
ff
EXIST, TYPE F
91.91.22.22.97•97•2020- RT.- RT.
pc3 nG
J
