READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2024-18 Authorizing $48,400 to FDOT for Eglin Pkwy Improvements — reading text

Part 27 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-41913-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

62,43 f/ I' 31 + 44,80 ®• d 76.89, LT. 50.00' 4T. AAI I 09, er' L). 52_69 50. 00' LT? 1' EDGE OF PAVEMENT EXIST + 51,02 + 66.49 c 37J9 LT, 56.50 LT. SURVEY SR 8.5 33F HJ i f'A} TF1-- r D _ - .. R . _ 8 Ca '' - " ti• I ' iFtllaLli- 92 91 99 m FG1141 NE - 9 _` RrrSY ff r.r. 4r4r R.R.} } oo 50.50. 00'00' RT.RT. oo++ 28342834 -- - .--- - .- BgfD)::: BgfD)::: ss cc: : 3.3. 1717 11 08'08' 177.177. `- `- 50.50. 007007 AT.AT. ss 39363936 82.82. 7474 grmgrm EXIST. RAY 79.79. 9090 RTRT —— 1+ EDGEEDGE OFOF PAYEMENT PAYEMENT 57195719 RVRV SueDlvtSmN Exrsr. RM NN ff EXIST, TYPE F 91.91.22.22.97•97•2020- RT.- RT. pc3 nG J

Download this text file with its original spacing ↓