READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 09-13-11 regular — reading text
Part 51 of 55. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-30009-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Stormwater Management Plan which E
has been reviewed by the City' s Construction Manager, and was found to be
insufficient. The existing stormwater flows from the south to the north. The
proposed treatment and attenuation does not meet the minimum standards ofthe m
City oJFart Walton Beach Land Development Code.
3
4.2. 5. Vehicular traffic, including on -site parking; a
Analysis: The applicant provided a parking plan which demonstrates that the
required number ofparking spaces has been met. However, the plan does not
4
demonstrate that the required number ofADA- designed spaces will be provided. u
The plan indicates that 3 ADA- designed spaces will be provided. The LDC w
requires a total of 5 spaces. This site is located directly behind the existing v
Waste Managementfacility, allowing for internal vehicular trafficflow between y
both sites. The site is configured so that general employee traffic circulation
will flow separately from commercial truck traffic and yard equipment traffic.
a
4.2. 6. Required permits form other government agencies;
Analysis.' An Environmental Resource Permit (ERP) from the Northwest Florida e
Water Management District (NWFWAID) is required and has been submitted to
T
the NWFWAM by the applicant. Permits and/or approval may also be required
from the Florida Department of Environmental Protection ( FDEP) related to r
the soil remediation. The applicant most obtain approval prior to building y
permits being issuedfor the project.
4. 2. 7. Noise;
Analysis: The applicant has stated that no additional significant noise is
expected from the proposed site improvements. Staff expects the noise activity
on -site to increase due to the movement of trucks and equipment. However, staff
expects the noise impacts to be concentrated more on -site and to the west ofthe
property ( where the new access points will be located) away from the
residential areas to the north, which are separated from the site by Lovejoy
Road NW
4. 2. 8. Lighting;
Analysis: All lighting shall be hooded or shielded as to reflect the light in such a
manner that no illumination source or glare creates a nuisance to any adjoining
Packet Pg. 181
t4. 3. c
Municipal Planning Board
ENGINEERING & UTILITY SERVICES
MEMORANDUM
To: Robert T. Meams, City Manager
From: Michael Beedie, Engineering & Utility Services Director
Date: September 1, 2011
m
Subject: MPB Case # 11 - 07 -SP Waste Management DO m
property owner or normal vehicular traffic. Lighting shall not exceed a
maximum intensity of 25 footcandles at ground level. The applicant has stated
that the internal lighting design will be installed so it will not be a nuisance to
the neighboring properties. The applicant must submit an acceptable lighting
plan prior to a building permit being issuedfor the project.
4.2. 9. Impacts on natural resources.
Analysis: The proposed site improvements consist of remediating contaminated
soils on site and retaining a large isolated wetland area to be used for
stormwater treatment, thereby improving the overall environmental site
conditions. The project consists of removing approximately 10. 7 acres of
existing woodlands /vegetation. The removed trees must be mitigated at a 1: 1
ratio, which is provided in the required perimeter landscaping.
5. STAFF FINDINGS OF FACT:
5. 1. Staff fords that the submitted site plan does not demonstrate compliance with all
applicable sections of the Land Development Code, specifically Section 14. 90,
Stormwater Management Regulations, and Section 16. 30. 13, ADA- designed parking
spaces.
6. RECOMMENDATION:
6. 1. Staff respectfully recommends the Municipal Planning Board, acting as the Local
Planning Agency, deny the request for the development order for the Waste
Management Equipment and Vehicle Storage Yard Site Plan at 109 Ready Avenue NW
based on the staff findings above.
ATTACHMENTS:
Item 3. 7 Table ( PDF)
SW- ReadyLovejoy ( PDF)
DO Application ( PDF)
Entire Plan Set ( PDF)
neighborhood impact study ( PDF)
F143.
Municipal Planning Board
0
To:
ENGINEERING & UTILITY SERVICES
MEMORANDUM
Robert T. Meams, City Manager
From: Michael Beedie, Engineering & Utility Services Director
Date: September 1, 2011
m
Subject: MPB Case # 11 - 07 -SP Waste Management DO m
sunbiz info( PDF)
SIGNATURE BLOCK:
Stella Jones Completed 08/ 26/ 2011 10: 59 AM
Tim Bolduc Completed 08/ 26/ 2011 11: 30 AM
Michael Beedie Skipped 08/ 26/ 2011 1: 34 PM
City Attorney Skipped 08/ 26/ 2011 1: 26 PM
Carole Jones Completed 08/ 26/ 2011 1: 51 PM
City Manager Completed 08/ 26/ 2011 1: 57 PM
Municipal Planning Board Pending
ve
Packet Pg. 183
F143.F143.
ITEM 3. 7. Adjacent Property Land Use /Zoning:
North South East West
Varies - MUCC- M -2 M -2 M -2
Zoning
2, C -2, R -1 A
Future Varies -LDR, IND IND IND
Land Use MDR, MU, MBI
Varies -
Existing Varies- Vacant, Manufacturing/ Varies-
Warehouse Municipal/ Warehouse/
Land Use SFR
Warehouse/ Municipal/
Repair Shop Vacant
PacketPacket Pg.Pg. 184184
14. 3. d
Draft Minutes --
City of Fort Walton Beach
Regular Meeting of the Municipal Planning Board
Thursday, September 1, 2011 5: 30 PM
1. CALL TO ORDER
5: 30 PM Meeting was called to order on September 1, 2011 at Council Chamber, 107 Miracle
Strip Parkway, Fort Walton Beach, FL.
Attendee Name Title Status Arrived
Allan Steams Present
Brian Rosales Present
Janet Wilson Present
Don Panzenhagen Present
Glenda Glover Present
Charles Scott Absent
Dean Covey Present
Charles Scott was an unexcused absence
2. PLEDGE OF ALLEGIANCE
3. PRESENTATIONS
4. APPROVAL OF AGENDA
1. Approval of Agenda
The vote on the motion to approve the agenda was unanimous.
RESULT: ADOPTED [ UNANIMOUS]
MOVER: Allan Stearns
SECONDER: Dean Covey
AYES:
Steams, Rosales, Panzenhagen, Glover, Covey
ABSENT: Janet Wilson, Charles Scott
5. APPROVAL OF MINUTES
1. Approval of MPB Minutes
M. Wnpal Planning Board Page 1
Packet Pg. 185
14.3. d
Regular Meeting Minutes September 1, 2011
Ms. Wilson arrived at 5: 33 pm.
The vote on the motion to approve the MPB Minutes of the August 4, 2011 regular meeting
and the August 18 workshop meeting was unanimous.
RESULT: ADOPTED [ UNANIMOUS]
MOVER: Janet Wilson
SECONDER: Brian Rosales
AYES: Steams, Rosales, Wilson, Panzenhagen, Glover, Covey
ABSENT: Charles Scott
rl ali 1311IKK1Iulu13WN& I
7. LOCAL PLANNING AGENCY BUSINESS - QUASIJUDICLAL
The Chairman recessed the MPB at 5: 43 and convened as the Local Planning Agency (LPA).
The City Attorney gave the oath to those who planned to testify on this issue.
1. MPB Case # 11 -07 -SP Consideration of Major Development Order for Waste Management
Storage Yard Site Plan at 109 Ready Avenue
Mr. Bolduc advised that since the Staff Report was written, which recommended denial of the
request, Waste Management has