dionbeachdtoqntt.wm\wodAatlachments \15 ll. 0T FEES
last pnnted: W012011 12'.51 PM
Packet Pg. 156
14. 2
City Council of Fort Walton Beach
0
To:
ENGINEERING & UTILITY SERVICES
MEMORANDUM
Robert T. Mearns, City Manager
From: Michael Beedie, Engineering & Utility Services Director
Date: September 13, 2011
Subject: Task Order for Stormwater Master Plan
1. BACKGROUND:
I. I. In October 2008, the City of Fort Walton Beach adopted Ordinance 1768 to implement
a new Stormwater Utility for the purpose of operating and maintaining the City' s
stormwater infrastructure.
1. 2. The Stormwater Utility was setup as an enterprise fund with a base user fee of $3. 00
per Equivalent Residential Unit ( ERU). The annual revenue is used to develop a
Stormwater Management Program that is responsible " for the operation, construction,
and maintenance of stormwater devices; for stormwater system planning; for review of
development plans in compliance with stormwater management codes; and for surface
water quality management ".
1. 3. In the original Stormwater Utility study, completed by Tetra Tech, Inc., a preliminary
Stormwater Master Plan was completed that outlined $ 16 million in various stormwater
improvement projects. However, the preliminary Stormwater Master Plan was not
comprehensive, did not create a hydraulic model of the stormwater system, and did not
immediately identify a short-term or long -term capital improvement program.
2. DISCUSSION:
2. 1. The City contacted Hatch Mott MacDonald, LLC to provide a budget, scope, and
schedule to complete a comprehensive Stomtwater Master Plan. The scope of work
includes the collection of appropriate data, the development of a comprehensive
stormwater hydraulic / hydrologic model, the creation and simulation of various storm
events to determine critical min events, the development of various design alternatives
to address capacity and flooding issues and determine necessary capital improvement
projects, the development of opinions of probable costs for the required improvements,
and the prioritization of the capital improvements for various planning horizons.
2.2. The Stormwater Master Plan will also allow the City to evaluate the current user fee
structure to determine if it is sufficient for the necessary improvements.
2. 3. This project will also take into account the contribution of stormwater runoff from
Okaloosa County since there are several areas within the stormwater system where
interconnections occur.
2. 4. The proposed schedule for this project is estimated to take approximately 16 months
from the execution of the Task Order with not -to- exceed cost of $205, 000.
3. FINANCIAL INFORMATION:
3. 1. To complete all of the tasks of the comprehensive Stomtwater Master Plan as defined
in the Scope of Services, Hatch Mott MacDonald has proposed a not -to- exceed fee of
205, 000.
3. 2. If approved, a $ 66, 794 budget amendment from Stormwater Fund net assets would be
required as there is $ 138, 206 budgeted in FY 2010 -11.
4.
4. 1. Staff requests City Council authorization for the City Manager to execute a Task Order
with Hatch Mott MacDonald, LLC of Pensacola, Florida to complete a comprehensive
Stormwater Master Plan for a not -to- exceed amount of $205, 000.
ATTACHMENTS:
Stormwater Master Plan Task Order ( PDF)
SIGNATURE BLOCK:
Michael Beedie Completed 09/01/ 20114: 06 PM
Finance Completed 09/02/ 2011 11: 08 AM
Carole Jones Completed 09/06/ 2011 11: 33 AM
City Manager Completed 09/ 08/ 2011 10: 33 AM
City Council Pending
0
TASK ORDER
CONTRACT FOR GENERAL CONSULTING SERVICES
STORM WATER MASTER PLAN
This task order is executed by the parties on the dates signed, shall become effective
as of the date signed by the last party, and incorporates by reference the entire Contract for
General Consulting Services, Executed May 7, 2010, between the City of Fort Walton Beach,
a Florida municipality, with its principal place of business at 107 Miracle Strip Parkway SW,
Fort Walton Beach, Florida, ( "City") and the Consultant:
Hatch Mott MacDonald Florida, LLC
5111 North 12ia Avenue
Pensacola, FL 32504
Telephone Number 850. 484. 6011
Fax Number 850. 484. 8199
Section 1. Scope of Work
The Consultant shall perform the services ( the " Work ") described in:
Attachment A —Scope of Services
CITY OF FORT WALTON BEACH STORMWATER MASTER PLAN
Dated September 1, 2011
And as further described in:
Attachment B —Fee Estimate
CITY OF FORT WALTON BEACH STORMWATER MASTER PLAN
Dated September 1, 2011
Section 2. Project Schedule
The Consultant shall complete the project within 16 months from the date that
Authorization to Proceed is issued. Additional work assigned by the City, ability of City to
collect data due to allocation of City resources m project or competing City priorities may
modify this schedule.
Section 3. Price & Payment of Project
The Consultant shall be compensated as follows:
Fixed Price. The Consultant' s compensation shall be a fixed price ( lump sum)
of $204,072. 21 ( Two hundred four thousand seventy two and 21/ 100 and
21/ 100 dollars).
Time and Materials. In addition to the Fixed Price sum indicated above, the
Consultant shall have a time and materials allowance, for services to be
provided on an " as requested" basis to assist the City with inventory and data
collection as indicated in the section titled " Task I Inventory/ Data
Collection" of Attachment A.
FWB Slonowater Master Plan Task Order - Final. docx Page 1 of 2
Packet Pg. 159
Total billings for time and material services shall not exceed $ 40,000. 00
Forty thousand dollars) without prior City authorization. Time and materials
services shall be billed at rates in accordance with the current general services
agreement between the City and Hatch Mott MacDonald.
Section 4. Insurance/ Payment/Performance Bond
The following insurance /payment/performance bond requirements shall apply for the
time of this Task order: Not Applicable
Section 5. Time of Completion
Wmk shall commence upon execution of the Task Order and shall be completed as
outlined herein.
CITY OF FORT WALTON BEACH, FLORIDA
2011
By:
Robert Meams, City Manager Dated
Attest:
Helen Spencer, City Clerk
CONSULTANT
BY: 2011
Dated
Printed Name: Charles G. Baxlev, PE
Its: Executive Vice President
State of
County of
Sworn and affnmed before me, the undersigned authority, on
2011, by , in his/her representative capacity as the
of Consultant,
and who is
personally known to me or who has produced identification.
Public
Identification:
FWB Stormwaler Master Plan Task Order - Final. docx Page 2 of 2
Packet Pg. 760
Attachment A —Scope of Services
CITY OF FORT WALTON BEACH STORMWATER MASTER PLAN
The City of Fort Walton Beach ( CffY) desires to procure Engineering services for The City
of Fort Walton Beach Stormwater Master Plan. Hatch Mott MacDonald ( HMM) proposes to
provide the tasks identified below to 1) generate hydrologic/ hydraulic model(s) necessary to
evaluate and predict stormwater flows/levels and 2) develop a City of Fort Walton Beach
Stormwater Master Plan to identify current stormwater rate /volume issues, develop
conceptual design solutions and rank and prioritize design alternatives. Water Quality data
will not be included at this time, but will be addressed in future updates to the model and
Stormwater Master Plan.
Additionally, the City understands that Okaloosa County has or will also contract with HMM
to prepare a Master Stormwater Management Plan update. A collaborative approach would
be beneficial to both the County and City as stormwater is not restricted to geopolitical
boundaries. To facilitate such collaboration, the County is willing to provide the data from
its 2003 HEC -RAS model to the City as a starting point for a new comprehensive County &
City model if the City' s selected model platform is compatible with the County' s electronic
data. Furthermore, the County is currently developing their GIS Stormwater Data Layer and
that information will be made available to the City. The intention, if possible, is to use the
County' s existing GIS and model data to populate the new selected model platform and then
update the new model with specific City attributes and new County projects to achieve both
the County' s and City' s objectives. However, the City portion of the model is expected to
have more detail and analyses than the updated County Areas.
Task 1 Inventory/Data Collection:
Pertinent data related to the basins may be collected from the following potential agencies
and/ or organizations: City of Fort Walton Beach, Okaloosa County, Florida Department of
Environmental Protection ( DEP), Northwest Florida Water Management District
NWFWMD), U. S. Army Corps of Engineers ( ACOE), FEMA, Natural Resource
Conservation Service (MRCS), National Oceanic and Atmospheric Administration ( NOAA),
Florida Department of Transportation ( FDOT), West Florida Regional Planning Council,
U.S. Weather Bureau, United States Geologic Survey ( USGS), Florida Natural Area
Inventory ( FNAI), U.S. Fish and Wildlife Service ( USEWS) and the Florida Fish and
Wildlife Conservation Commission ( FWC). Data will be collected as available and as
required until HMM has obtained sufficient information to build the City' s model. In most
cases, sources that provide redundant information will not be used. Examples of