STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
New OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
SIMILAR PROJECT EXPERIENCE
Level One Remodel for Club Intrawest in Sandestin, FL
Lord & Son was the Prime Contractor for the Level One Remodel of Club Intrawest, a resort in Sandestin. This
project consisted of totally gutting an existing 8,200 square foot office area and then building four
condominium units, a new office and marketing area, and a children’s area. Lord & Son installed new
partition walls, sheetrock, custom wood doors, custom wood trim, and custom cabinets. Finishes included
custom painting, carpet, carpet tile, ceramic floor and wall tile, glass mosaic wall tile, and vinyl plank flooring.
Also included were state of the art plumbing, HVAC, and electrical systems.
Because Club Intrawest is a working resort condominium, guests were present during the entire project.
Therefore, no noise was allowed before 9:00 AM, and work had to be stopped by 6:00 PM Monday through
Saturday. This requirement presented a particular challenge. As this was a fast-track project intended to be
completed in 90 days, every minute of work had to count. Most of the work did involve noise, but “quiet”
prep work was done early so that the louder work could commence promptly at 9:00 AM.
Lord & Son was able to complete the project in a timely manner by meeting with subcontractors, getting
them to work together, overlapping different phases of the project, and ensuring that all work was done
correctly the first time and was of the highest quality.
Page 60
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Project Team:
Project Manager: Dave Burleson
Project Superintendent: Todd Powell
Construction Cost:
At Award: $731,200.00
Final Cost: $784,779.00
Reason for the cost growth: Owner directed changes
Construction Dates:
Start: Date: September 3, 2013
Original Completion Date: December 23, 2013
Final Completion Date: January 24, 2014
The completion date was delayed due to special items
furnished by the owner.
Owner:
Intrawest Resort Ownership US Corporation
#326-375 Water Street
Vancouver, BC V6B 5C6
Canada
Mr. Chris Blaney
604-689-8816 (P)
604-682-7842 (F)
cblaney@clubintrawest.com
Architect:
Kendrick David Dowling Architects, Inc.
320 Bayshore Drive, Suite B
Niceville, FL 32578
James Mattern
850-243-9158 (P)
Page 61
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
SIMILAR PROJECT EXPERIENCE
Additions and Renovations to Building 4254 at Keesler AFB, MS
Lord & Son teamed up with Environmental Safety Awareness & Construction, LLC (ESAC) for this project,
which involved the renovation and new construction of Building 4254 (hangar) used for C-130 repair and
maintenance. A third of the hangar bay is used for maintenance and repair to the wheels and tires of the C-
130 fleet.
The project entailed the complete demolition and replacement of the building’s mechanical systems to
include new HVAC systems, mini split ductless heat pumps, infrared heaters, exhaust fans and gas fired
heaters/boilers, and complete demolition and replacement of the building’s foam and fire suppression
systems that included new piping, pumps, controllers, bladder tanks, notifiers, and sensor/pull stations.
Existing electrical service was rebuilt including new breakers, panels, disconnects, branch wiring, conduit, and
devices. Recertification of existing 400 Hz system was included. New offices, restrooms, and break rooms
were part of this project’s scope and included new sheetrock, metal studs, CMU walls, carpet, VCT, ACT, and
painting. New exterior personnel doors and hangar bay doors were provided and installed. The hangar bay
doors were automated and included various tail apertures to accommodate the different models of C-130s
based at Keesler. New concrete sidewalks, driveways, and stoops were provided along with new asphalt
paving access drives. Interior of the hangar bay floor was shot blasted and painted. A new epoxy trowel down
floor system was used. New fall protection arrestor systems were installed along with new air hose and
electrical service reels.
Scheduling work around the active runway was a challenge. Lord & Son had constant contact with the tower
to schedule concrete and other large deliveries. Tire changing equipment for the planes was houses in this
hangar. Because this building was a mission critical component of the flight readiness at Keesler, Lord & Son
had to work around the equipment and personnel in this building and worked off hours during necessary
repair cycles. Coordination with the Air Force was held on a daily basis to discussed planned construction
work and Air Force service needs.
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Project Team:
Project Manager: Ryan Chavers
Project Superintendent: Mike Suggs
Construction Cost:
At Award: $1,480,100.00
Final Cost: $1,628,230.00
Reason for the cost growth: Owner directed
modifications
Construction Dates:
Start Date: October 21, 2011
Final Completion: March 10, 2013
Owner/Architect:
81st Contracting Squadron
Department of the Air Force
310 M Street, Suite 108
Keesler AFB, MS 39534
Mr. Reggie Temple
228-377-3130 (P)
228-377-3298 (F)
reggie.temple@us.af.mil
Page 63
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
SIMILAR PROJECT EXPERIENCE
Addition to Calvary Baptist Church in Fort Walton Beach, FL
Lord & Son was the Prime Contractor for the addition of a new 2,670 square foot building to serve as a
community center and day care for Calvary Baptist Church in Fort Walton Beach. The addition consisted of a
pre-engineered building with a metal roof and a combination of brick and stucco exterior over metal building
panels, as well as a small commercial kitchen and an outside seating area. Sitework included new
sidewalks and new aluminum covers between the new community building and the existing buildings.
Project Team:
Project Manager: Mike O’Grady
Project Superintendent: Todd Powell
Construction Cost:
At Award: $570,947.00
Final Cost: $546,626.00
Construction Dates:
Start Date: September 20, 2010
Final Completion: September 1, 2011
Owner:
Calvary Independent Baptist Church
529 Clifford Street
Fort Walton Beach, FL 32547
Rev. Mark Stevens
850-862-5369 (P) | 850-862-5368 (F) | calvary@cbcfwb.org
Architect:
Kendrick David Dowling Architects
111 Ferry Road
Fort Walton Beach, FL 32548
850-243-9158 (P)
Page 64
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NEW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
SIMILAR PROJECT EXPERIENCE
Police/Fire Station in Fort Walton Beach, FL
Lord & Son completed the renovation and new construction of the Fort Walton Beach Fire and Police Station
facilities. Construction occurred while the facility was in operation. In order to minimize interruption to the
occupants, the project was phased to allows the completion of one area prior to starting the next. Both
facilities were completely gutted, and new utilities, as well as both exterior and interior finishes, were
installed. Both facilities involved several additions. The police station included a new holding area that
housed two secure cells and a screening area to allow temporary detainment on the premises.
Project Team:
Project Manager: John Klumpp
Project Superintendent: Jack Harris
Construction Cost:
At Award: $3,172,660.00
Final Cost: $3,348,568.00
Reason for the cost growth: Owner directed modifications
Page 65
STATEMENT OF QUALIFICATIONS
CONSTRUCTION MANAGEMENT SERVICES
NeW OFFICE BUILDING AT THE OKALOOSA COUNTY SHERIFF'S OFFICE IN SHALIMAR
Construction Dates:
Start: 2001
Police Phase Complete: December 18, 2002
Fire Phase 1 Complete: July 29, 2003
Fire Phase 2 Complete: October 24, 2003
Owner:
City of Fort Walton Beach
107 Miracle Strip Parkway
Fort Walton Beach, FL 32548
Mr. Mike Tatum
850-833-9523 (P)
Architect:
Barganier Davis Sims Architects
PO Box 2110
Montgomery, AL 36102
334-834-2038
Page 66
CONFLICT OF INTEREST DISCLOSURE FORM
For purposes of determining any possible conflict of interest, all proposers, must disclose if
any Okaloosa Board of County Commissioner, employee(s), elected officials(s), or if any of
its agencies is also an owner, corporate officer, agency, employee, etc., of their business.
Indicate either “yes” (a county employee, elected official, or agency is also associated
with your business), or “no”. If yes, give person(s) name(s) and position(s) with your
business.
YES NO__ X
NAME(S) POSITION(S)
FIRM NAME: Lord & Son Construction, Inc.
BY (PRINTED): LevenjD, Lord, Il
BY (SIGNATURE): (MAVEZ—~
TITLE: President
ADDRESS: PO Box 1808
Fort Walton Beach, FL 32549
PHONE NO. 850-863-5158
E-MAIL _spike@lordandson.com
17
DRUG-FREE WORKPLACE CERTIFICATION
THE BELOW SIGNED PROPOER CERTIFIES that it has implemented a drug-free workplace program. In
order to have a drug-free workplace program, a business shall:
Te
Publish a statement notifying employees that the unlawful manufacture, distribution,
dispensing, possession, or use of a controlled substance is prohibited in the workplace and
specifying the actions that will be taken against employees for violations of such prohibition.
Inform employees about the dangers of drug abuse in the workplace, the business's policy of
maintaining a drug-free workplace, any available drug counseling, rehabilitation and
employee assistance programs, and the penalties that may be imposed upon employees for
drug abuse violations.
Give each employee engaged in providing the commodities or contractual services that are
under quote a copy of the statement specified in subsection 1.
In the statement specified in subsection 1, notify the employees that, as a condition of
working on the commodities or contractual services that are under quote, the employee will
abide by the terms of the statement and will notify the employer of any conviction of, or plea
of guilty or nolo contendere to, any violation of Chapter 893 or of any controlled substance
law of the United States or any state, for a violation occurring in the workplace no later than
five (5) days after such conviction.
Impose a sanction on, or require the satisfactory participation in, drug abuse assistance or
rehabilitation program if such is available in employee's community, by any employee who is
convicted.
Make a good faith effort to continue to maintain a drug-free workplace through
implementation of this section.
As the person authorized to sign this statement, | certify that this firm complies fully with the above
requirements.
April 18, 2014 SIGNATURES L
DATE:
COMPANY: Lord & Son Construction, Inc. NAME: Leven D. Lord, II
(Typed or Printed)
ADDRESS: PO Box 1808
TITLE: President
Fort Walton Beach, FL 32549
E-MAIL: Spike@lordandson.com
PHONE NO.: 850-863-5158
18
NO CONTACT CLAUSE
The Board has established a solicitation silence policy (No Contact Clause) that prohibits oral
and written communication regarding all formal solicitations for goods and services (formal bids,
Request for Proposals, Requests for Qualifications) issued by the Board through the County
Purchasing Department.
The period commences when the procurement document is received and terminates when the
Board approves an award.
When the solicitation silence period is in effect, no oral or written communication is allowed
regarding the solicitation between prospective bidders/proposers and members of the Board,
the County Administrator or members of the Board Approved Review Committee. All questions
or requests for information regarding the solicitation must be directed to the