CCIFinalInvoice from the Okaloosa County BOCC meeting of February 18, 2014 (IQM2 meeting #1190). Original portal label: CCIFinalInvoice. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- CCIFinalInvoice
- Date
- February 18, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
CCIFinalInvoice (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 121.6 KB
Download ↓Machine-extracted text — 59-CCIFinalInvoice.pdf
Text extracted on 2026-10-31 from 59-CCIFinalInvoice.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 6.0 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
NAME OF PRO.IECT: Duke Field SCADA Fiber Optic Link
j.
CONTRACTORS NAME: CCI Systems, Inc.
ADDRESS: 105 Kent Lane CCI JOB NO.
Iron Mountain, MI49801 .
PERIODIC ESTIMATE NO. : _ _ _ FOR PERIOD: July 19, 2013 TO: December 18, 2013
SUBSTANTIAL COMPLETION DATE: _S..:.!eP:. :. te=--m-=.be-=-r.. .;.17.:. .!.,-=2.:. .: 10-=..3_ _ _ _ _ _ _ _ _ _ __
FINAL COMPLETION DATE: _Ja=-n...::.ua=-ry!.....30~,2:.:.0_14~_~_ _~_ _ _ _ _ __
JOB NO. 41·449
ITEM COMPLETED TOTAL COST
DESCRIPTION FINAL OTY. &UNIT UNIT PRICE
NO. UNITS COMPLETED
Mobilization, Bonds &Insurance LS $ 10,228.39 $ 10,228.39
2 Coordination of Work LS $ 23,889.73 $ 23,889.73
Clean and proof existing empty segmentrs of
3 2" conduit and furnish and install pull tape
within conduit 37,208 LF $ 0.75 37,208 $ 27,906.00
Fumish and install 96 strand fiber optic cable
in existing empty 2" conduit and pull box
4 system, insluding all splice enclosures,
fusion splices, maintenance loops, seals,
duct plugs, detectable pull tape, testing and
all other appurtenances. 39,274 LF $ 2.31 39,274 $ 90,722.94
5 Furnish and install new Pull Box 3 EA $ 2,211.52 3 $ 6,634.56
6 Fumish and install new Splice Box 2 EA $ 866.05 2 $ 1,732.10
TOTAL COST COMPLETED $ 161,113.72 )f
Page 1 of 2
a Original contract amount ................................................................................._$'--_.,;..;16'-':3t-':.5~18:.;..O::-:8=-
j'
b Plus: Additions scheduled in change orders ........................................................____$;. ;1.:,.38;;,.;.:7.,;. ;5;,. .
c Less: Deductions scheduled in change orders...... to'........... ......................................"...._~($~2.:.;;.54...;..3~.~11~)
d Adjusted contract amount to date... '" ......... ;............. ~... :........................................,;$'--_..;,;16;.,;.1.:.;;.1..;"13;;,.;..7;,,,,;;2;;,..
ANALYSIS OF WORK PERFORMED:
a Total Cost of work performed to date ................................................................. $ 161.113.72
b Stored materials .............................................................................................~$:-_,,:,::-:-:-:-:-=::-
c Subtotalof(c)and(d) ..................................................................................... $ 161.113.72
d Less: Amount retained in accordance with contract terms .................................................................. .
e Net amount earned on contract work to date............ .......................... ................. $ 161.113.72
f Less: Amount of previous payments .................................................................._$;.-_..,...,....,...,.....,."..,...,:
9 BALANCE DUE THIS PAYMENT ...................................................................... $ 161,113.72
CERTIFICATION OF CONTRACTOR:
According to the best of my knowledge and belief, I certify that aliltems and amounts shown on the face of this Periodic
Estimate for Partial Payments are correct; that all work has been performed and/or materials supplied in full accordance
with the requirements of the referenced contract, and I or duly authorized deviations, substitutions, alterations, and/or
additions; that the foregoing is a true and correct statement of the contract amount up to and including the last day of
the period covered by this Periodic estimate; that no part of the "Balance Due this Payment" has been received, and that
the undersigned and his subcontractors have complied with all the labor provisions of said contract.
CCI Systems, Inc.
DATE: )-/5 -/~I
CERTIFICATION OF ENGINEER:
I certify that I have checked the above Periodic Estimate for Partial Payment and that to the best of my knowledge and
belief it is a true and correct statement of work performed and I or material supplied by the Contractor; and that partial
payment claim and requested by the Contractor is correctly computed on the basis of work performed and lor material.
Polyengineering, Inc.
DATE: /- 27-1'1
AUTHORIZED REPRESENTj\TIVE
Page 2of2