About this source
CCINTP from the Okaloosa County BOCC meeting of February 18, 2014 (IQM2 meeting #1190). Original portal label: CCINTP. Preserved as a historical public record; part of the meeting linked as a related source.
- Original publication
- CCINTP
- Date
- February 18, 2014
- Reference collection
- Okaloosa County Board of County Commissioners (IQM2 public portal)
HOW FAR THIS HAS BEEN CHECKED
- File / copy authenticity
- Preserved files carry a SHA-256 fingerprint fixed at ingest; whether those bytes match the original capture is not independently verified.
- Transcription / extraction
- Machine produced / unreviewed — machine-extracted, not yet human-corrected
- Claim corroboration
- Not independently verified
View reference catalogue / source ↗
Download this source
CCINTP (PDF)
Original PDF as published on the Okaloosa County IQM2 meeting portal.
PDF · 59.6 KB
Download ↓Machine-extracted text — 58-CCINTP.pdf
Text extracted on 2026-10-31 from 58-CCINTP.pdf using the PDF text layer (pdftotext). Not human-corrected; may contain recognition errors. Read alongside the source images.
Text · 1.9 KB
Download ↓
Full text
Machine-extracted from the source by optical character recognition. Not yet human-corrected — it may contain recognition errors. Read it alongside the images above.
NOTICE TO PROCEED
DATE: June 19. 2013
TO: Mr. Stuart Lahti
CCI Systems
105 Kent Street
Iron Mountain, MI 49801
PROJECT: Duke Field SCADA Fiber Optic Link
You are hereby notified to commence WORK in accordance with the Agreement dated May 09,
2013, on or before July 19, 2013. In accordance with Article 4 of the Agreement the date of
Substantial Completion is September 17, 2013 and the date of final completion and readiness
for final payment is November 16,2013.
In case of failure on the part of the CONTRACTOR to complete the work within the time(s)
specified in the contract, or within such additional time(s) as may be granted by Okaloosa
County, the County will suffer damage, the amount of which is difficult, if not impossible, to
ascertain. Therefore the CONTRACTOR shall pay to the COUNTY, as liqUidated damages, the
sum of $972.00 for each calendar day of delay that actual completion extends beyond the time
limit specified until such reasonable time as may be required for final completion of the work. In
no way shall costs for liquidated damages be construed as penalty on the CONTRACTOR.
You are required to return an acknowledged copy of this NOTICE TO PROCEED to the
OWNER.
OKALOOSA~:F COUNTY COMMISSIONERS
BY ~~ __ .
TITLE: Purchasing Director
ACCEPTANCE OF NOTICE
Receipt of the above NOTICE TO PROCEED is hereby acknowledged.
eel Systems. Inc.
Company Name
This the -;;-=-"'--
1st ...,.--:;.;Ju:::.;;l;;./..y_ _ _ _, 2013
/)..
.'
Signatu
By: Stuart Lahti
Type or Print Name
Title: VP of Access Net\-Iorks
- - --_ - ... ----.
Related sources
This ccintp is part of the Okaloosa County BOCC meeting of February 18, 2014.