Policy
No person shall perform any type of construction, demolition, remodeling, or any other type of
work to any building owned by Okaloosa County without the approval of the Facilities
Maintenance Director. Anyone performing maintenance, construction, demolition or any other
work on behalf of the county, who discovers what may be asbestos containing materials, should
stop their activity immediately and secure the area. Then, he/she shall notify Facility
Maintenance immediately. Work may not resume until authorized by the Facility Maintenance
Director, or his authorized representative.
All removal or disturbance of asbestos-containing materials (ACM) shall be performed by
properly trained and credentialed contractors in compliance with all applicable local, state, and
federal guidelines. Okaloosa County employees will not engage in asbestos abatement.
Authority and Responsibility
Purchasing shall be responsible for:
J. Including a notice to all bidders in the published bid docuemnts that they must contact the
Okaloosa County Facility Maintenance Director at least 15 days prior to beginning any
work on any county facilities.
Facilities Maintenance shall be responsible for:
1. Determining the presence and location of ACM prior to any work being done.
2. Overseeing the identification and abatement of ACM in Okaloosa County facilities.
3. Providing information and basic awareness training to all parties occupying county
facilities for managing ACM remaining in place.
4. Creating a county wide county building survey, continually updated, to indicate asbestos
surveys and abatement activities completed. Copies of the survey may be obtained from
county Risk Management.
5. Disclosing the presence of ACM to any outside service contractors.
6. Providing outside service contractors a copy of Okaloosa County’s Asbestos Policy.
7. Notifying building occupants of abatement activities.
Outside service contractors are responsible for:
1. Providing general awareness training for their employees, so that employees are able to
identify materials that may contain asbestos and what to do should that occur.
2. Notifying Facilities Maintenance immediately about materials discovered that may
contain asbestos which may be disturbed during work activities. If such materials are
discovered, all work activities are to cease until cleared to resume by the Facilities
Maintenance Director.
Asbestos Disturbing Activities
Examples of activities that may result in the disturbance of suspect asbestos-containing materials
include:
Removing or repairing floor tile.
Drilling, nailing, or placing screws into floor tile.
Removing or repairing ceiling tiles.
Removing pipe insulation or pipe joint compound to access pipes.
Disturbing plaster ceilings or walls.
Removing carpet which has floor tile underneath it.
Or, any other work that disturbs existing building materials that has not been cleared by
the Facilities Maintenance Director as not containing asbestos.
oe 8 ¢€ @ @ @
All Okaloosa County buildings will be surveyed for the presence and location of asbestos-
containing materials prior to any work being done to the facility. Asbestos containing materials
which might be disturbed by the work to be done shall be abated prior to the start of any work.
Risk Management shall maintain a database with locations of asbestos containing materials. The
approval of the Facilities Maintenance Director, or his authorized representative, is required.
before beginning any project involving work on county building.
Abatement Projects
All asbestos abatement projects within Okaloosa County Buildings shall be performed under
the direction of the Facilities Maintenance Director utilizing qualified firms who are properly
licensed, certified, and experienced in the removal of asbestos containing materials.
Notifications
The Facilities Maintenance Director shall ensure that proper notification is given as required by
any regulatory agency having jurisdiction over the planned abatement activities and according to
the prevailing regulations governing the work.
Renovation and Construction
During the design phase of all renovation or construction activities on any county building,
Project Managers shall consult with the Director of Facility Maintenance to ensure that an
asbestos survey has been done, as required by law. Then determine if the project will disturb any
asbestos-containing materials and develop a plan to abate any asbestos containing materials that
may be disturbed by the planned work. If, during any work being done on any county
facility, materials are uncovered which may contain asbestos (PACM), all work will cease
immediately. The area where the suspect materials were found shall be secured and the
Director of Facilities Maintenance shall be contacted immediately. No further work will be
performed until authorized by the Facilities Maintenance Director.
Training
The Facility Maintenance Director shall conduct basic training to inform staff and provide
knowledge and basic awareness on asbestos issues.
Outside Service Contractor Information
All outside service contractors shall be notified of the presence of asbestos-containing materials
prior to beginning work activities. All outside service contractors shall be responsible for
providing general awareness training for their employees and to train them on what to do if
suspected asbestos-containing materials are found during work activities. Facilities Maintenance
shall be contacted immediately in the event that suspect asbestos-containing materials are
discovered during work activities. Contractors shall be made aware of the Okaloosa County
Asbestos Policy prior to the commencement of work.