Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text

Part 37 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

the specifications. b. Not later than eight hours and before the formation of rust, the cleaned surfaces (SSPC-SP10) shall be primed with the specified primer applied at a rate to achieve a 2.5 - 3.5 mils (min.) dry film thickness. c. The primer coat shall be inspected and approved by the ENGINEER prior to proceeding with the remaining coats. d. After approval of the prime coat a finish coat shall be applied at a rate to achieve 30.0 - 40.0 mils DFT. Roof beams, sharp edges and other difficult to coat areas shall receive 40.0 – 50.0 mils DFT.. e. The total dry film thickness for the two (2) coat system shall be a minimum of 32.5 mils. All roof beams, sharp edges and other difficult to coat areas shall have a minimum of 42.5 mils DFT. f. Paint shall be applied strictly in accordance with the manufacturer's recommendations. 6. Re-coat Cycle a. The CONTRACTOR shall review the manufacturer's published product data for maximum re-coat times for the interior coating system selected for use. b. If the maximum re-coat window is exceeded prior to application of the Repair & Paint 009870 - 23 Countryview & Bluewater Tanks (2014) Job No. 41-459 succeeding coat, then the CONTRACTOR shall prepare the interior surfaces in accordance with the manufacturer's published product data prior to the application of the next coat. c. The cost of this additional surface preparation shall be borne by the CONTRACTOR with no additional cost to the OWNER. d. The Contract Time shall not be increased as a result of this additional surface preparation. 7. Curing a. Each coat shall be properly cured before the application of any subsequent coats. b. The interior wet area coating shall be completely cured and the tank shall not be filled with water until approved by the ENGINEER and OWNER. c. The exterior dry coating on the opposite side of water bearing surfaces shall be completely cured and the tank shall not be filled with water until approved by the ENGINEER and OWNER. d. Solvent rub tests, pencil hardness tests, or other industry recognized testing procedures shall be used as recommended by the manufacturer. e. The CONTRACTOR shall monitor the torus bottom plate temperature during the interior coating curing to verify that minimum steel temperature requirements are satisfied. 8. Ventilation a. Forced ventilation shall be supplied to the interior of the tank for a continuous period of at least 48 hours after the final coat has been applied. b. Adequate ventilation of the tank bottom and other low lying areas of the tank shall be provided by the CONTRACTOR as required for solvent release and coating cure. This ventilation shall, at a minimum, be in accordance with AWWA D102-06. c. The CONTRACTOR shall furnish, install and operate the equipment that is necessary to provide forced ventilation to aid curing. d. If supplementary heating or dehumidification is required to effect curing, the CONTRACTOR shall furnish, install, and operate the equipment to perform the supplementary heating or dehumidification required at no additional cost. 9. Testing a. All interior wet coatings, including those above the high water level, shall be checked with a wet sponge low voltage holiday detector. b. Testing shall be done in accordance with Section B.9.3 of AWWA D102-06 in the presence of the ENGINEER. c. Any voids indicated shall be repaired by applying more of the finish coat of paint by brush or roller. The repaired areas shall be retested after the Repair & Paint 009870 - 24 Countryview & Bluewater Tanks (2014) Job No. 41-459 appropriate drying time. d. The coating system must pass the holiday test regardless of the mil thickness applied to the tank. D. Preparation and Painting the Tank Exterior 1. Surfaces to be Painted All exterior surfaces of the tank, including the bowl, tower, rods, turnbuckle threads, bolts, nuts, pins, brackets, seams, corners, base, pedestals/pillars or legs, manhole neck of the roof vent, etc., shall be cleaned and painted in accordance with the paragraphs in this section. 2. Irregular Surfaces a. Any burns, weld splatter, rough welds, weld overlap, bolts, sharp edges, or corners of any areas disturbed or installed by the CONTRACTOR'S operations which would cause difficulty in achieving a defect-free coating shall be chipped and/or ground smooth. b. Any pinholes or voids in exterior welds shall be filled with an epoxy seam sealer. It is not the intent to have these irregular surfaces chipped and/or ground flush. The objective of the chipping, grinding and/or seam sealing is to eliminate irregular surfaces to provide a surface that is sufficiently smooth for the application of a uniform thickness coating without voids. This chipping, grinding and/or seam sealing is considered incidental to the exterior painting and is to be included in the Base Bid. 3. Cleaning Tank and Debris Removal a. The surfaces described in paragraph 3.05.D.1 shall be cleaned to a degree of cleanliness equivalent to SSPC-SP6, Commercial Blast Cleaning by a method approved by the ENGINEER and OWNER. b. A sample area of minimum size 2’x 2’ will be cleaned to a degree of cleanliness equivalent to SSPC-SP 6, Commercial Blast Cleaning as agreed by the ENGINEER and CONTRACTOR. After agreement as to degree of cleanliness, the sample area shall be clear coated and used as a template for the remainder of the cleaning for this portion of the tank. 4. Coating Application a. The approved coatings for the exterior surfaces are intended to comply with the requirements of AWWA D102-11 Outside Coating System No. 4 (OCS-4, Modified). Acceptable manufacturers and products are shown in the coating schedule. The CONTRACTOR must submit certifications indicating compliance with the specifications. Repair & Paint 009870 - 25 Countryview & Bluewater Tanks (2014) Job No. 41-459 b. Not later than eight hours and before the formation of rust, the cleaned surfaces (SSPC-SP6) shall be primed with the specified primer. c. Should any area exist where the intersection of two (2) members does not allow the complete cleaning of the intersection and the members cannot be separated for cleaning (such as anchor bolt washers, clevises, turnbuckles, etc.), these intersections shall be post-primed with an aluminum platelet pigmented material suitable for marginally cleaned surfaces. The material shall be Tnemec 1 Omnithane, or other material approved in writing by the ENGINEER and recommended by the manufacturer of the exterior paint system. d. Following the prime coat application, the exterior surfaces shall receive two intermediate coats and a finish coat of paint. The colors for the intermediate coats shall be slightly darker than that chosen for the finish coat, being dark enough and different enough from one another to visually assure application and coverage of each subsequent coat, yet light enough to allow proper hiding of the intermediate coats of paint. 5. Recoat Cycle a. The CONTRACTOR shall review the manufacturer's published product data for maximum recoat times for the interior coating system selected for use. b. If the maximum recoat window is exceeded prior to application of the succeeding coat, then the CONTRACTOR shall prepare the interior surfaces in accordance with the manufacturer's published product data prior to the application of the next coat. c. The cost of this additional surface preparation shall be borne by the CONTRACTOR with no additional cost to the OWNER. d. The Contract Time shall not be increased as a result of this additional surface preparation. 6. Curing a. Each coat shall be properly cured before the application of any subsequent coats. b. The interior wet area coating shall be completely cured and the tank shall not be filled with water until approved by the ENGINEER and OWNER. c. The exterior dry coating on the opposite side of water bearing surfaces shall be completely cured and the tank shall not be filled with water until approved by the ENGINEER and OWNER. d. Solvent rub tests, pencil hardness tests, or other industry recognized testing procedures shall be used as recommended by the manufacturer. e. The CONTRACTOR shall monitor the torus bottom plate temperature during the interior coating curing to verify that minimum steel temperature requirements are satisfied. Repair & Paint 009870 - 26 Countryview & Bluewater Tanks (2014) Job No. 41-459 E. Logos 1. Countryview Tank - The Tank CONTRACTOR shall paint the Okaloosa County logo on the broadside of the tank. The logo shall be painted using colors to match the logo (See Appendix for representative detail). Final color selections are on file at Tnemec. Orientation of the Logo on the tank to be determined by the OWNER. Diameter of the logo shall be minimum of 20'.