READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 34 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
or starting, stopping, or removal
from service any equipment shall be done by the OWNER'S personnel upon request by
the CONTRACTOR.
D. The CONTRACTOR shall provide a representative who shall contact and distribute
notices to the surrounding properties in the vicinity of the project site. The purpose of
this notification procedure is to inform the neighbors and businesses of the ensuing
cleaning and painting operations and to establish a good working relationship with the
surrounding property owners and occupants whose property may be affected by the
cleaning and painting operations of the CONTRACTOR
E. Protection of Equipment and Cabinets
1. All electrical apparatus, telemetering and other equipment in or on the tank,
including all wiring, shall be protected from all damage and dust or other
deleterious material infiltration during the operations of the CONTRACTOR.
2. Any antennas on the roof of the tank shall also be protected from damage. The
operation of the equipment shall be continued during the repair, cleaning and
painting operations.
3. Any items damaged by the operations of the CONTRACTOR shall be replaced in
kind or acceptably repaired by the CONTRACTOR at no cost to the OWNER.
4. Before cleaning on any portion of the tank, all cabinets on the site shall be covered
to prevent the entry of blasting abrasive, dust or paint and so they can continue to
function as required.
5. Any cabinets which cannot be covered will be marked by the OWNER. The
covering shall be removed from the cabinets while the cabinets are cleaned,
painted, and the coating cures in accordance with the exterior painting section of
these specifications.
6. Any blasting, cleaning or paint debris inside these cabinets shall be removed by the
CONTRACTOR prior to completion of the Work.
F. Nameplates
1. The nameplates shall be carefully removed to prevent paint coverage. The
areas behind the nameplates shall be cleaned and painted in accordance with
section 3.05 of this specification.
Repair & Paint 009870 - 11
Countryview & Bluewater Tanks (2014) Job No. 41-459
2. The nameplates shall be protected from the application of paint on the exposed
surface.
3. Any paint on the nameplate shall be removed by solvent cleaning or other methods
which will not damage the surface of the nameplate.
4. The nameplates shall be bolted back on the mounting brackets with stainless steel
stove bolts and nuts.
G. Conduit and Cables
1. Cables, conduit, and conduit clamps shall be relocated as necessary to effect
proper surface preparation and coating.
2. The cables, conduit, and conduit clamps along or near ladders shall be repositioned
prior to the cleaning and painting being sure to provide a minimum clear spacing
of 3" between the cables or conduit and the ladder side rails so as not to interfere
with the climber.
H. Interior Rigging Openings
1. Suitable threaded outlets shall be installed in the roof of the tank for the attachment
of paint rigging.
2. The threaded outlets shall be a Phoenix #132 heavy tank flange. The flanges shall
be welded on both the inside and outside of the tank with a continuous fillet weld.
3. Galvanized malleable iron pipe plugs shall be furnished and installed after the
completion of the painting. The threads on the plugs shall be covered with Teflon
tape prior to threading into the couplings.
4. The couplings shall be installed in sufficient number and placement so as to allow
complete and proper cleaning and painting of the shell and roof surfaces of the
tank.
I. Inter-coat Cleaning
1. Residue or foreign matter on applied coatings to receive subsequent coats shall be
cleaned by pressure rinse.
2. Determination of the need for inter-coat cleaning shall be made by the ENGINEER
and OWNER. Inter-coat cleanliness shall be determined by wiping with clean
white rags, determination of pH, chlorides or other suitable test, depending on
circumstances. Pressure cleaning when required between coats of coating material
are the CONTRACTOR’S responsibility.
Repair & Paint 009870 - 12
Countryview & Bluewater Tanks (2014) Job No. 41-459
3.2 ELECTRICAL SYSTEM SAFETY
A. The CONTRACTOR shall at a minimum take the following safety measures to prevent
accidents due to electrical hazards:
1. Electric Service Deactivation:
a. The OWNER shall deactivate and lock out the electric service to the tank.
b. The CONTRACTOR shall verify the deactivated status of the electric service
to the tank prior to beginning each day's Work functions and throughout the
work day.
c. The verification of the electric service deactivation is the sole responsibility of
the CONTRACTOR and shall be accomplished without supervision from the
OWNER, ENGINEER, or other direct or indirect agents of the OWNER.
2. Electric Service Wiring
a. The CONTRACTOR shall be aware of the electric service wiring attached to
and located adjacent to the tank.
b. The OWNER shall relocate, deactivate, or provide necessary electric shock
hazard protective devices to prevent exposure of workers and/or equipment to
electric shock hazards.
c. The CONTRACTOR shall verify that there is sufficient electric shock hazard
protection for the workers and equipment prior to and throughout each
working period on the job.
d. The verification of the electric shock hazard protection is the sole
responsibility of the CONTRACTOR and shall be accomplished without
supervision from the OWNER, ENGINEER, or other direct or indirect agents
of the OWNER.
3.3 CONTAINMENT SYSTEM
A. The CONTRACTOR shall design and provide a containment system for the capture,
containment, collection, storage and disposal of the waste materials generated by the
work under this specification Section, to meet the requirements of SSPC Guide 6, Class
3 and this specification.
B. The Containment Enclosure shall be at minimum as follows:
Repair & Paint 009870 - 13
Countryview & Bluewater Tanks (2014) Job No. 41-459
1. A retractable enclosure to completely surround (around and under) the blasting,
priming and coating operations. The ground cannot be used as the bottom of the
enclosure unless completely covered with suitable containment material that
retains 100% of the residue.
2. Constructed of flexible materials such as containment screens (specifically
designed for this purpose). The floor may be containment screening or of rigid
materials such as overlapping plywood fastened in place.
3. Maintained free of tears, cuts or holes.
4. Have seams overlapped a minimum of 6" and fastened together at 12" centers or
fastened and overlapped in a manner that insures a tight seal which does not allow
openings between the screens in the containment.
5. With sides extending past the top of and enclose the roof of the tank.
6. With a top bonnet capable of containing dust, debris and coating materials being
removed.
7. Retractable or moveable in a carousel fashion such that:
a. Lowering shall require no more than 10 minutes
b. Raising shall require no more than 15 minutes.
C. It is the CONTRACTOR’S responsibility to insure the feasibility and workability of the
containment system.
D. The CONTRACTOR shall ensure that no cleaning/blasting debris, overspray or
coating droplets escape to the atmosphere. The ground surrounding the tank shall be
protected from all debris and other materials generated in the cleaning operations.
E. The CONTRACTOR shall be responsible for all materials that are used and for any
apparatus used to contain debris, overspray, and coating droplets.
F. The CONTRACTOR shall perform his operations and work schedule in a manner as to
minimize leakage of the containment system. The containment system shall be
properly maintained and shall not deviate from the approved drawings, without the
ENGINEER’S approval.
G. If at any time during the execution of the work, the containment system fails to
function satisfactorily, the OWNER reserves the right to stop work and the
CONTRACTOR suspend all operations, except those required to minimize adverse
impact on the environment or property. Operations shall not resume until
modifications have been made to correct the cause of failure. Modifications shall be
approved by the ENGINEER. The OWNER further reserves the right to stop work or
to require additional or different enclosure methods, if the CONTRACTOR’S
operations create a nuisance beyond the tank site property line in the sole opinion of the
OWNER, the ENGINEER, the OWNER’S designated representative, any regulatory
agency, or neighbor.
Repair & Paint 009870 - 14
Countryview & Bluewater Tanks (2014) Job No. 41-459
H. The containment system and all accompanying support brackets and rigging shall be
designed by a professional engineer and appropriately signed and sealed per applicable
rules and regulations. A professional engineer registered in the State of Florida shall
provide a statement that the containment system will not exceed the structural loading
capacity of the tank when fully erect.
I. The containment system utilized on the tank shall be designed not to impose excessive
loading on the tank, tower and tank appurtenances. Any damage done to the tank or
tower as a direct or indirect result of the enclosure system shall be repaired by the
CONTRACTOR at no additional cost to the OWNER. Neither the ENGINEER nor the
OWNER assume any responsibility for the structural ability of the tank and tower to
support the enclosure system.
J. All equipment shall be parked on ground covers free of cuts, tears or holes to prevent
contamination of pavement or soil and to protect area under and around equipment.
K. If tarps are used as part of the