READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text

Part 31 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

C. Disposal of volatile wastes into sanitary or storm sewers shall not be allowed. 1.3 DISPOSAL OF SURPLUS MATERIALS A. Unless otherwise shown on the Drawings, specified or directed, the Contractor shall dispose of all surplus excavated materials and equipment from demolition, legally off the site, and shall provide his own suitable, off-site spoil area, or on a site designated by the Owner. 1.4 FINAL CLEANING The Contractor shall: A. Remove from the site all plant, material, tools and equipment belonging to him, and leave the site with an appearance acceptable to the Engineer. B. The Contractor shall thoroughly clean all equipment materials installed by him and shall deliver over such materials and equipment in a bright, clean, polished and new-appearing condition. C. Restoration of Landscape Damage. Any landscape feature scarred or damaged by the Contractor's equipment or operations shall be restored as nearly as possible to its original condition at the Contractor's expense. The Engineer will decide what method of restoration shall be used. Repair & Paint Countryview & Bluewater Tanks (2014) 01711-1 Job No. 41-459 D. Post-Construction Cleanup or Obliteration. The Contractor shall obliterate all signs of temporary construction facilities such as haul roads, work areas, structures, stockpiles of excess or waste materials, or any other vestiges of construction, as directed by the Engineer. END OF SECTION 01711 Repair & Paint Countryview & Bluewater Tanks (2014) 01711-2 Job No. 41-459 SECTION 01740 WARRANTIES AND BONDS PART 1 - GENERAL 1.1 PROJECT MAINTENANCE AND WARRANTY A. Maintain and keep in good repair the improvements covered by these Drawings and Specifications during the life of the Contract. B. Indemnify the Owner against any repairs which may become necessary to any part of the work performed and to items of equipment and systems procured for or furnished under this Contract, arising from defective workmanship or materials used therein, for a period of five (5) years after acceptance from the final date of final resolution of the Owner accepting work. C. The Contractor shall not be obligated to make replacements which become necessary because of ordinary wear and tear, or as a result of improper operation or maintenance, or as a result of improper work or damage by another Contractor or the Owner, or to perform any work which is normally performed by a maintenance crew during operation. D. In the event of multiple failures of major consequences prior to the expiration of the five-year warranty described above, the affected unit shall be disassembled, inspected, and modified or replaced as necessary to prevent further occurrences. All related components which may have been damaged or rendered non- serviceable as a consequence of the failure shall be replaced. As used herein, multiple failures shall be interpreted to mean two (2) or more successive failures of the same kind in the same item or failures of the same kind in two (2) or more items. Major failures may include, but are not limited to, cracked or broken housings, piping, or vessels, excessive deflections, bent or broken shafts, broken or chipped gear teeth, premature bearing failure, excessive wear, or excessive leakage around seals. Failures which are directly and clearly traceable to operator abuse, such as operations in conflict with published operating procedures, or improper maintenance, such as substitution of unauthorized replacement parts, use of incorrect lubricants or chemicals, flagrant over- or under-lubrication, and using maintenance procedures not conforming with published maintenance instructions, shall be exempted from the scope of the one-year warranty. Should multiple failures occur in a given time, all products of the same size and type shall be disassembled, inspected, modified or replaced, as necessary and rewarranted for one year. E. The Contractor shall, at his own expense, furnish all labor, materials, tools and equipment required and shall make such repairs and removals or shall perform Repair & Paint Countryview & Bluewater Tanks (2014) 01740-1 Job No. 41-459 such work or reconstruction as may be made necessary by any structural or functional defect or failure resulting from neglect, faulty workmanship or faulty materials, in any part of the Work performed by him. Such repair shall also include refilling of trenches, excavations or embankments which show settlement or erosion after backfilling or placement. F. Except as noted on the Drawings or as specified, all structures such as embankments and fences shall be returned to their original condition prior to the completion of the Contract. Any and all damage to any facility not designated for removal, resulting from the Contractor's operations, shall be promptly repaired by the Contractor at no cost to the Owner. G. In the event the Contractor fails to proceed to remedy the defects of which he has been notified within fifteen (15) days of the date of such notice, the Owner reserves the right to cause the required materials to be procured and the work to be done, as described in the Drawings and Specifications, and to hold the Contractor and the sureties on his bond liable for the cost and expense thereof. I. Notice to Contractor for repairs and reconstruction will be made in the form of a registered letter addressed to the Contractor at his home office. J. Neither the foregoing paragraphs nor any provision in the Contract Documents, nor any special guarantee time limit implies any limitation of the Contractor's liability with the law of the place of construction. END OF SECTION 01740 Repair & Paint Countryview & Bluewater Tanks (2014) 01740-2 Job No. 41-459 SECTION 09870 REPAIRING AND REPAINTING WATER TANKS PART 1 - GENERAL 1.1 SECTION INCLUDES Blasting, cleaning, repairing, and painting the Countryview and Bluewater Water Storage Tanks. 1.2 RELATED SECTIONS Section 01300 - Submittals 1.3 PROJECT CONDITIONS A General Arrangement Drawings and Site Plans (See Appendix) of the two tanks to be painted are included for the Contractor’s convenience and is intended to depict the tanks’ dimensions. This information should be correlated with field observations prior to submitting a bid. 1.4 SUBMITTALS A. Work Schedule With the following minimum information prepared for the Northgate Tank work site: 1. Mobilization and rigging 2. Begin repairs 3. Complete repairs 4. Blast and paint wet surfaces 5. Blast and paint exterior surfaces 6. Disinfection 7. Clean-up and Demobilization. B. Supplier, type and size of abrasive to be used with Material Safety Data Sheets (MSDS). C. Material Safety Data Sheets (MSDS) for all coatings, sealers and chemicals used and Certificate of Compliance with ANSI/NSF Standard 61 for all coatings and sealers in contact with potable water. Repair & Paint 009870 - 1 Countryview & Bluewater Tanks (2014) Job No. 41-459 D. Description of proposed method of containing the cleaning debris and paint droplets. E. Descriptive written plan concerning how abrasive and/or paint damage to automobile, boats and property will be handled, including a process for quick removal of the abrasive or paint. F. Evidence or documentation submitted to verify that the employees have had sufficient training and experience in industrial painting, safety practices, worker protection, environmental monitoring, and waste handling procedures to adequately perform the responsibilities contained in these specifications G. Welder’s certification papers 1.5 QUALITY ASSURANCE A. Applicable Standards 1. Welding a. All design and welding shall be done in accordance with AWWA D100-05, Standard for Welded Steel Tanks for Water Storage. Where tolerances and stresses are not limited by the AWWA Standard, the applicable sections of the July 1993 revision of the American Petroleum Institute (API) Standard 650 shall apply. b. All welders and welding operators shall be certified to the procedures and processes required to accomplish the work. 2. Repairs, Surface Preparation, and Painting a. Repairs shall be made in accordance with American Water Works Association Standard (AWWA) D101-97 and applicable section of AWWA D100-96. b. All blasting and painting operations shall be completed in accordance with the requirements of the Steel Structures Painting Council (SSPC) Volume 1 and Volume 2, including Commentary Sections and Appendices; AWWA C652-92; the NSF International Standard 61, "Drinking Water System Components - Health Effects"; the paint manufacturer's published product data; and these Specifications. c. The SSPC "Visual for Abrasive Blast Cleaned Steel" SSPC-VIS 1-89 and the SSPC "Visual Standard for Power and Hand-Tool Cleaned Steel" SSPC-VIS 3-93 shall also be used taking into account staining from previous paint applications. d. Coatings shall be in accordance with AWWA D102-11, Coating Steel Water- Storage Tanks. e. All coatings shall be acceptable to the controlling state, federal, and/or local health and environmental regulatory agencies. Repair & Paint 009870 - 2 Countryview & Bluewater Tanks (2014) Job No. 41-459 f. All interior coating materials, solvents, and other additives shall comply with the ANSI/NSF Standard 61 "Drinking Water System Components - Health

Download this text file with its original spacing ↓