READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 3 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
relates to the Work for which a Bid is to be submitted.
On request, OWNER will provide to each Bidder for examination access to or copies of Contract
Documents (other than portions thereof related to price) for each other work.
4.07 It is the responsibility of each Bidder before submitting a Bid to:
A. examine and carefully study the Bidding Documents, including any Addenda and the
other related data identified in the Bidding Documents;
B. visit the Site and become familiar with and satisfy Bidder as to the general, local, and
Site conditions that may affect cost, progress, and performance of the Work.
C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and
Regulations that may affect cost, progress, or performance of the Work;
D. carefully study all reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions in or relating to existing surface or
subsurface structures at or contiguous to the Site (except Underground Facilities) which have
been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General
Conditions, and carefully study all reports and drawings of a Hazardous Environmental
Condition, if any, at the Site which have been identified in the Supplementary Conditions as
provided in paragraph 4.06 of the General Conditions;
E. obtain and carefully study (or assume responsibility for doing so) all examinations,
investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface,
and Underground Facilities) at or contiguous to the Site which may affect cost, progress, or
performance of the Work or which relate to any aspect of the means, methods, techniques,
sequences, and procedures of construction to be employed by Bidder, including any specific
means, methods, techniques, sequences, and procedures of construction expressly required by
the Bidding Documents, and safety precautions and programs incident thereto;
F. agree at the time of submitting its Bid that no further examinations, investigations,
explorations, tests, studies, or data are necessary for the determination of its Bid for performance
of the Work at the price bid and within the times and in accordance with the other terms and
conditions of the Bidding Documents;
G. become aware of the general nature of the work to be performed by OWNER and
others at the Site that relates to the Work as indicated in the Bidding Documents;
H. correlate the information known to Bidder, information and observations obtained
from visits to the Site, reports and drawings identified in the Bidding Documents, and all
additional examinations, investigations, explorations, tests, studies, and data with the Bidding
Repair & Paint
Countryview & Bluewater Tanks 00100-4 Job No. 41-459
Documents;
I. promptly give ENGINEER written notice of all conflicts, errors, ambiguities, or
discrepancies that Bidder discovers in the Bidding Documents and confirm that the written
resolution thereof by ENGINEER is acceptable to Bidder; and
J. determine that the Bidding Documents are generally sufficient to indicate and convey
understanding of all terms and conditions for the performance of the Work.
4.08 The submission of a Bid will constitute an incontrovertible representation by Bidder that
Bidder has complied with every requirement of this Article 4, that without exception the Bid is
premised upon performing and furnishing the Work required by the Bidding Documents and
applying any specific means, methods, techniques, sequences, and procedures of construction
that may be shown or indicated or expressly required by the Bidding Documents, that Bidder has
given ENGINEER written notice of all conflicts, errors, ambiguities, and discrepancies that
Bidder has discovered in the Bidding Documents and the written resolutions thereof by
ENGINEER are acceptable to Bidder, and that the Bidding Documents are generally sufficient to
indicate and convey understanding of all terms and conditions for performing and furnishing the
Work.
ARTICLE 5 - SITE AND OTHER AREAS.
5.01 The site is identified in the Bidding Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment, or storage of materials
and equipment to be incorporated in the Work are to be obtained and paid for by
CONTRACTOR. Easements for permanent structures or permanent changes in existing
facilities are to be obtained and paid for by OWNER unless otherwise provided in the Bidding
Documents.
ARTICLE 6 - INTERPRETATIONS AND ADDENDA.
6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to
ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in
response to such questions will be issued by Addenda mailed, emailed, faxed or delivered to all
parties recorded by ENGINEER as having received the Bidding Documents. Questions received
less than ten days prior to the date for opening of Bids may not be answered. Only questions
answered by Addenda will be binding. Oral and other interpretations or clarifications will
be without legal effect.
6.02 Addenda may be issued to clarify, correct, or change the Bidding Documents as deemed
advisable by OWNER or ENGINEER.
ARTICLE 7 - BID SECURITY.
7.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of
5% of Bidder’s maximum Bid price and in the form of a cashier’s check or a Bid Bond on the
Repair & Paint
Countryview & Bluewater Tanks 00100-5 Job No. 41-459
form attached issued by a surety meeting the requirements of paragraphs 5.01 and 5.02 of the
General Conditions.
7.02 The Bid security of the Successful Bidder will be retained until such Bidder has executed
the Contract Documents, furnished the required contract security and met the other conditions of
the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails
to execute and deliver the Contract Documents and furnish the required contract security within
15 days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security
of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to
have a reasonable chance of receiving the award may be retained by OWNER until the earlier of
seven (7) days after the effective date of the Agreement or thirty-six (36) days after the bid
opening whereupon Bid security furnished by such Bidder will be returned.
7.03 Bid security of other Bidders whom OWNER believes do not have a reasonable chance of
receiving the award will be returned within seven days after the Bid opening.
ARTICLE 8 - CONTRACT TIMES.
8.01 The number of days within which, or the dates by which, the Work is to be (a)
Substantially Completed and (b) also completed and ready for final payment are set forth in the
Agreement.
ARTICLE 9 - LIQUIDATED DAMAGES.
9.01 Provisions for liquidated damages, if any, are set forth in the Agreement.
ARTICLE 10 - SUBSTITUTE AND “OR-EQUAL” ITEMS.
10.01 The Contract, if awarded, will be on the basis of materials and equipment specified or
described in the Bidding Documents without consideration of possible substitute or “or-equal”
items. Whenever it is specified or described in the Bidding Documents that a substitute or “or-
equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable
to ENGINEER, application for such acceptance will not be considered by ENGINEER until after
the Effective Date of the Agreement. The procedure for submission of any such application by
CONTRACTOR and consideration by ENGINEER is set forth in the General Conditions and
may be supplement in the General Requirements.
Repair & Paint
Countryview & Bluewater Tanks 00100-6 Job No. 41-459
ARTICLE 11 - SUBCONTRACTORS, SUPPLIERS, AND OTHERS.
11.01 The Contractor shall perform a minimum of 75 percent of work by his own work forces
unless specifically authorized by the Owner and Engineer and no Subcontractor shall be allowed
to perform work on the project unless they are acceptable to the Owner and Engineer.
11.02 If OWNER requests the identity of certain Subcontractors, Suppliers, individuals, or
entities to be submitted to OWNER in advance of the Effective Date of the Agreement as
provided for in paragraph 6.06.B.1) of the Supplementary Conditions, the apparent Successful
Bidder, and any other Bidder so requested, shall within seven (7) days after receipt of a written
request from the OWNER or the ENGINEER, submit to OWNER a list of all such
Subcontractors, Suppliers, individuals, or entities proposed for those portions of the Work for
which such identification is required. Such list shall be accompanied by an experience statement
with pertinent information regarding similar projects and other evidence of qualification for each
such Subcontractor, Supplier, individual, or entity if requested by OWNER. If OWNER or
ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor,
Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request
apparent Successful Bidder to submit a substitute, in which case apparent Successful Bidder
shall submit an acceptable substitute, Bidder’s Bid price will be increased (or decreased) by the
difference in cost occasioned by such substitution, and OWNER may consider such price
adjustment in evaluating Bids and making the contract award.
11.03 If apparent Successful Bidder declines to make any such substitution, OWNER may
award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors,
Suppliers, individuals, or entities. Declining to make requested substitutions will not constitute
grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier,
individual, or entity so listed and against which OWNER or ENGINEER makes no written
objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and
ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement
as provided in paragraph 6.06 of the General Conditions.
11.04 CONTRACTOR shall not be required to employ any Subcontractor, Supplier, individual,
or entity against whom CONTRACTOR has reasonable objection.
ARTICLE 12 - PREPARATION OF BID.
12.01 The bid form is included with the Bidding Documents. Additional copies may be
obtained from ENGINEER. The Bidder shall submit an original and two (2) copies of the
bid form.
12.02 All blanks on the Bid form shall be completed by printing in ink or by typewriter and the
Bid signed. A Bid price shall be indicated for each section, Bid item, alternative, adjustment unit
price item, and unit price item listed therein, or the words “No Bid”, “No Change”, or “Not
Applicable” entered.
12.03 A Bid by a corporation shall be executed in the corporate name by the president or a
Repair & Paint
Countryview & Bluewater Tanks 00100-7 Job No. 41-459
vice-president or other corporate officer who has legal authority to sign. The corporate seal shall
be affixed and attested by the secretary or an assistant secretary. The corporate address and state
of incorporation shall be shown below the signature.
12.04 A Bid by a partnership shall be executed in the partnership name and signed by a partner
(whose title must appear under the signature). The official address of the partnership shall be
shown below the signature.
12.05 A Bid by a limited liability company shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of the firm
and the official