READ ALONGSIDE THE SOURCE

Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text

Part 28 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

the following new paragraph immediately after paragraph 14.05.A.1 which is to read as follows: 2. OWNER may at any time request CONTRACTOR in writing to permit OWNER to take over operation of any such part of the Work although it is not substantially complete. A copy of such request will be sent to ENGINEER and within a reasonable time thereafter OWNER, CONTRACTOR and ENGINEER shall make an inspection of that part of the Work to determine its status of completion and will prepare a list of the items remaining to be completed or corrected thereon before final payment. If CONTRACTOR does not object in writing to OWNER and ENGINEER that such part of the Work is not ready for separate operation by OWNER, ENGINEER will finalize the list of items to be completed or corrected and will deliver such lists to OWNER and CONTRACTOR together with a written Repair & Paint Countryview & Bluewater Tanks (2014) 00800-6 Job No. 41-459 recommendation as to the division of responsibilities pending final payment between OWNER and CONTRACTOR with respect to security, operation, safety, maintenance, utilities, insurance, warranties and guarantees for that part of the Work which will become binding upon OWNER and CONTRACTOR at the time when OWNER takes over such operation (unless they shall have otherwise agreed in writing and so informed ENGINEER). During such operation and prior to Substantial Completion of such part of the Work, OWNER shall allow CONTRACTOR reasonable access to complete or correct items on said list and to complete other related Work. SC-17.01 In addition to the provisions of paragraph 17.01 of the General Conditions, written Notice to the CONTRACTOR shall be deemed to have been given if delivered in person to the CONTRACTOR's authorized representative on the project site. END OF SECTION 00800 Repair & Paint Countryview & Bluewater Tanks (2014) 00800-7 Job No. 41-459 SECTION 01010 SUMMARY OF WORK PART 1 - GENERAL 1.1 WORK COVERED BY CONTRACT DOCUMENTS Work includes the repair, surface preparation and painting the 300,000 gallon Bluewater Tank and the 200,000 gallon Countryview Tank including erecting and maintaining a containment system. 1.2 WORK SEQUENCE Work sequence shall generally be determined by the contractor. However, each tank is in a separate service area and both may be taken out of service simultaneously. 1.3 CONTRACTOR'S USE OF PREMISES A. Contractor shall limit his use of the premises for work and for storage. B. Contractor shall coordinate use of premises under direction of Owner. C. Contractor shall assume full responsibility for the protection and safekeeping of products under this contract, stored on the site. D. Contractor shall move any stored products, under Contractor's control, which interfere with operations of the Owner. 1.4 OWNER OCCUPANCY Owner will occupy the premises during the entire period of construction for the conduct of his normal operations. Cooperate with Owner's Representative in all construction operations to minimize conflict, and to facilitate Owner usage. 1.5 SUBSTITUTION OF EQUIPMENT AND MATERIALS In the Plans and Specifications, certain equipment and materials are identified by manufacturer in order to establish the quality expected by the Owner and Engineer. Equipment of equal or better quality may be substituted for those named at the Contractor's option with the stipulations described below. If this equipment is subsequently Repair & Paint Countryview & Bluewater Tanks (2014) 01010 - 1 Job No. 41-459 disapproved, the Contractor shall resubmit until the equipment he proposes is approved. The Engineer shall be the final authority on equality. This substitution paragraph does not apply to those pieces of equipment identified by a manufacturer followed by the words "to match existing." Where equipment is identified by manufacturer, the first name appearing on the Plans is the name of the manufacturer around which the facility was designed. The second name is a manufacturer known to the Engineer to produce a similar piece of equipment of equal quality. As described above, the Contractor may choose to install another manufacturer's equipment. If the Contractor chooses to install any piece of equipment other than the first named, any modifications or additional components required to provide a complete and satisfactory installation shall be provided by the Contractor at no additional expense to the Owner. END OF SECTION 01010 Repair & Paint Countryview & Bluewater Tanks (2014) 01010 - 2 Job No. 41-459 SECTION 01060 REGULATORY REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. Permits and Responsibilities. The Contractor shall, without additional expense to the Owner, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State and municipal laws, codes, ordinances and regulations, in connection with the prosecution of the Work. He shall take proper safety and health precautions to protect the Work, the workers, the public and the property of others. He shall also be responsible for all materials delivered and work performed until completion and acceptance of the Work, except for any completed unit of construction thereof which may heretofore have been accepted. END OF SECTION 01060 Repair & Paint Countryview & Bluewater Tanks (2014) Job No. 41-459 SECTION 1300 SUBMITTALS PART 1 - GENERAL 1.1 DESCRIPTION AND REQUIREMENTS A. Type of Submittals. This Section of the Specifications describes the procedures for submittals of Schedule of Submittals, Schedule of Construction, Insurance Certificates, List of Subcontractors, Anticipated Payment Schedules, Shop Drawings, Product Data, Samples, and miscellaneous work-related submittals. B. Related Work Specified Elsewhere: 1. Definitions and Additional Responsibilities of Parties: a. Section 00700: General Conditions b. Section 00800: Supplementary Conditions. C. Submittal Contents. The submittal contents required are specified in each section and in this specification. D. Definitions. Submittals are categorized as follows: 1. Shop Drawings: a. Shop drawings shall include technical data, drawings, diagrams, performance curves, schedules, templates, patterns, reports, calculations, instructions, measurements and similar information as applicable to the specific item for which the shop drawing is prepared. b. Provide newly-prepared information, on reproducible sheets, with graphic information at accurate scale (except as otherwise indicated) or appropriate number of prints hereof, with name of preparer (firm name) indicated. The Contract Drawings shall not be traced or reproduced by any method for use as or in lieu of detail shop drawings. Show dimensions and note which are based on field measurement. Identify materials and products in the work shown. Indicate compliance with standards and special coordination requirements. Do not allow shop drawing copies without appropriate final "Action" markings by the Engineer to be used in connection with the Work. 2. Product Data: a. Product data includes standard printed information on materials, products and systems, not specially prepared for this project, other than the designation of selections from among available choices printed therein. b. Collect required data into one submittal for each unit of work or system, and clearly mark each copy to show which choices and options are applicable to Repair & Paint Countryview & Bluewater Tanks (2014) 01300-1 Job No. 41-459 project. Include manufacturer's standard printed recommendations for application and use, compliance with standards, application of labels and seals, notation of field measurements which have been checked, and special coordination requirements. c. Show all performance characteristics, capacities, clearances required, and wiring or piping diagrams. Supplement standard information to provide all information specifically applicable to work. 3. Samples: a. Samples include both fabricated and unfabricated physical examples of materials, products and units of work, both as complete units and as smaller portions of units of work, either for limited visual inspection or (where indicated) for more detailed testing and analysis. b. Provide units identical with final condition of proposed materials or products for the work. Include "range" samples (not less than three (3) units) where unavoidable variations must be expected, and describe or identify variations between units of each set. Provide full set of optional samples where the Engineer's selection is required. Prepare samples to match the Engineer's sample where indicated. Include information with each sample to show generic description, source or product name and manufacturer, limitations, and compliance with standards. Samples are submitted for review and confirmation of "kind" by the Engineer. Engineer will not "test" samples (expect as otherwise indicated) for other requirements, which are the exclusive responsibility of the Contractor. c. Samples shall be of sufficient size to clearly indicate functional characteristics of the products and full range of color, texture, and pattern. 4. Miscellaneous submittals related directly to the work (non-administrative) include warranties, maintenance agreements, workmanship bonds, project photographs, survey data and reports, physical work records, statements of applicability, quality testing and certifying reports, copies of industry standards, record drawings, field measurement data, operating and maintenance materials, and similar information, devices and materials applicable to the Work but not processed as shop drawings, product data or samples. E.

Download this text file with its original spacing ↓