READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 18 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
and
whether or not caused in part by any negligence or
omission of an individual or entity indemnified 2. if OWNER and CONTRACTOR are
hereunder or whether liability is imposed upon such unable to agree on entitlement to or on the amount
indemnified party by Laws and Regulations regard- or extent, if any, of any adjustment in the Contract
less of the negligence of any such individual or Price or Contract Times that should be allowed as a
entity. result of such other work, a Claim may be made
therefore as provided in paragraph 10.05.
B. In any and all claims against OWNER or ENGI-
NEER or any of their respective consultants, agents, B. CONTRACTOR shall afford each other
officers, directors, partners, or employees by any employee contractor who is a party to such a direct contract and each
(or the survivor or personal representative of such utility owner (and OWNER, if OWNER is performing the
employee) of CONTRACTOR, any Subcontractor, any other work with OWNER’s employees) proper and safe
Supplier, or any individual or entity directly or indirectly access to the Site and a reasonable opportunity for the
employed by any of them to perform any of the Work, or introduction and storage of materials and equipment and
anyone for whose acts any of them may be liable, the the execution of such other work and shall properly
indemnification obligation under paragraph 6.20.A shall coordinate the Work with theirs. Unless otherwise
not be limited in any way by any limitation on the amount provided in the Contract Documents, CONTRACTOR
or type of damages, compensation, or benefits payable by shall do all cutting, fitting, and patching of the Work that
or for CONTRACTOR or any such Subcontractor, may be required to properly connect or otherwise make its
Supplier, or other individual or entity under workers’ several parts come together and properly integrate with
compensation acts, disability benefit acts, or other such other work. CONTRACTOR shall not endanger any
employee benefit acts. work of others by cutting, excavating, or otherwise altering
their work and will only cut or alter their work with the
C. The indemnification obligations of CONTRAC- written consent of ENGINEER and the others whose work
TOR under paragraph 6.20.A shall not extend to the will be affected. The duties and responsibilities of
liability of ENGINEER and ENGINEER’s Consultants or CONTRACTOR under this paragraph are for the benefit of
to the officers, directors, partners, employees, agents, and such utility owners and other contractors to the extent that
other consultants and subcontractors of each and any of there are comparable provisions for the benefit of
them arising out of: CONTRACTOR in said direct contracts between OWNER
and such utility owners and other contractors.
1. the preparation or approval of, or the
failure to prepare or approve, maps, Drawings, C. If the proper execution or results of any part of
opinions, reports, surveys, Change Orders, designs, CONTRACTOR’s Work depends upon work performed by
or Specifications; or others under this Article 7, CONTRACTOR shall inspect
such other work and promptly report to ENGINEER in
2. giving directions or instructions, or writing any delays, defects, or deficiencies in such other
failing to give them, if that is the primary cause of work that render it unavailable or unsuitable for the proper
the injury or damage. execution and results of CONTRACTOR’s Work.
CONTRACTOR’s failure to so report will constitute an
acceptance of such other work as fit and proper for
integration with CONTRACTOR’s Work except for latent
defects and deficiencies in such other work.
General Conditions Page 00700-26
7.02 Coordination of explorations and tests of subsurface conditions and
drawings of physical conditions in or relating to existing
A. If OWNER intends to contract with others for the surface or subsurface structures at or contiguous to the Site
performance of other work on the Project at the Site, the that have been utilized by ENGINEER in preparing the
following will be set forth in Supplementary Conditions: Contract Documents.
1. the individual or entity who will have 8.06 Insurance
authority and responsibility for coordination of the
activities among the various contractors will be A. OWNER’s responsibilities, if any, in respect to
identified; purchasing and maintaining liability and property insurance
are set forth in Article 5.
2. the specific matters to be covered by
such authority and responsibility will be itemized; 8.07 Change Orders
and
A. OWNER is obligated to execute Change Orders as
3. the extent of such authority and responsi- indicated in paragraph 10.03.
bilities will be provided.
8.08 Inspections, Tests, and Approvals
B. Unless otherwise provided in the Supplementary
Conditions, OWNER shall have sole authority and respon- A. OWNER’s responsibility in respect to certain
sibility for such coordination. inspections, tests, and approvals is set forth in paragraph
13.03.B.
ARTICLE 8 - OWNER’S RESPONSIBILITIES 8.09 Limitations on OWNER’s Responsibilities
______________________________________________
A. The OWNER shall not supervise, direct, or have
8.01 Communications to Contractor control or authority over, nor be responsible for,
CONTRACTOR’s means, methods, techniques, sequences,
A. Except as otherwise provided in these General or procedures of construction, or the safety precautions and
Conditions, OWNER shall issue all communications to programs incident thereto, or for any failure of CON-
CONTRACTOR through ENGINEER. TRACTOR to comply with Laws and Regulations applica-
ble to the performance of the Work. OWNER will not be
8.02 Replacement of ENGINEER responsible for CONTRACTOR’s failure to perform the
Work in accordance with the Contract Documents.
A. In case of termination of the employment of
ENGINEER, OWNER shall appoint an engineer to whom 8.10 Undisclosed Hazardous Environmental
CONTRACTOR makes no reasonable objection, whose Condition
status under the Contract Documents shall be that of the
former ENGINEER. A. OWNER’s responsibility in respect to an undis-
closed Hazardous Environmental Condition is set forth in
8.03 Furnish Data paragraph 4.06.
A. OWNER shall promptly furnish the data required 8.11 Evidence of Financial Arrangements
of OWNER under the Contract Documents.
A. If and to the extent OWNER has agreed to furnish
8.04 Pay Promptly When Due CONTRACTOR reasonable evidence that financial
arrangements have been made to satisfy OWNER’s
A. OWNER shall make payments to CONTRAC- obligations under the Contract Documents, OWNER’s
TOR promptly when they are due as provided in responsibility in respect thereof will be as set forth in the
paragraphs 14.02.C and 14.07.C. Supplementary Conditions.
8.05 Lands and Easements; Reports and Tests
A. OWNER’s duties in respect of providing lands
and easements and providing engineering surveys to
establish reference points are set forth in paragraphs 4.01
and 4.05. Paragraph 4.02 refers to OWNER’s identifying
and making available to CONTRACTOR copies of reports
General Conditions Page 00700-27
ARTICLE 9 - ENGINEER’S STATUS DURING the responsibilities and authority and limitations thereon of
CONSTRUCTION such other individual or entity will be as provided in the
______________________________________________ Supplementary Conditions.
9.01 OWNER’S Representative 9.04 Clarifications and Interpretations
A. ENGINEER will be OWNER’s representative A. ENGINEER will issue with reasonable prompt-
during the construction period. The duties and responsi- ness such written clarifications or interpretations of the
bilities and the limitations of authority of ENGINEER as requirements of the Contract Documents as ENGINEER
OWNER’s representative during construction are set forth may determine necessary, which shall be consistent with
in the Contract Documents and will not be changed without the intent of and reasonably inferable from the Contract
written consent of OWNER and ENGINEER. Documents. Such written clarifications and interpretations
will be binding on OWNER and CONTRACTOR. If
9.02 Visits to Site OWNER and CONTRACTOR are unable to agree on
entitlement to or on the amount or extent, if any, of any
A. ENGINEER will make visits to the Site at inter- adjustment in the Contract Price or Contract Times, or both,
vals appropriate to the various stages of construction as that should be allowed as a result of a written clarification
ENGINEER deems necessary in order to observe as an or interpretation, a Claim may be made therefor as provided
experienced and qualified design professional the progress in paragraph 10.05.
that has been made and the quality of the various aspects of
CONTRACTOR’s executed Work. Based on
