READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 16 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
copyrights calling for the payment of any license fee or Agreement if there were no Bids) having an effect on the
royalty to others, the existence of such rights shall be cost or time of performance of the Work may be the subject
disclosed by OWNER in the Contract Documents. To the of an adjustment in Contract Price or Contract Times. If
fullest extent permitted by Laws and Regulations, OWNER and CONTRACTOR are unable to agree on
CONTRACTOR shall indemnify and hold harmless entitlement to or on the amount or extent, if any, of any
OWNER, ENGINEER, ENGINEER’s Consultants, and the such adjustment, a Claim may be made therefore as
officers, directors, partners, employees or agents, and other provided in paragraph 10.05.
consultants of each and any of them from and against all
claims, costs, losses, and damages (including but not 6.10 Taxes
limited to all fees and charges of engineers, architects,
attorneys, and other professionals and all court or A. CONTRACTOR shall pay all sales, consumer,
arbitration or other dispute resolution costs) arising out of use, and other similar taxes required to be paid by
or relating to any infringement of patent rights or CONTRACTOR in accordance with the Laws and
copyrights incident to the use in the performance of the Regulations of the place of the Project which are applicable
Work or resulting from the incorporation in the Work of during the performance of the Work.
any invention, design, process, product, or device not
specified in the Contract Documents. 6.11 Use of Site and Other Areas
6.08 Permits A. Limitation on Use of Site and Other Areas
A. Unless otherwise provided in the Supplementary 1. CONTRACTOR shall confine
Conditions, CONTRACTOR shall obtain and pay for all construction equipment, the storage of materials and
construction permits and licenses. OWNER shall assist equipment, and the operations of workers to the Site
CONTRACTOR, when necessary, in obtaining such and other areas permitted by Laws and Regulations,
permits and licenses. CONTRACTOR shall pay all and shall not unreasonably encumber the Site and
governmental charges and inspection fees necessary for the other areas with construction equipment or other
prosecution of the Work which are applicable at the time of materials or equipment. CONTRACTOR shall
opening of Bids, or, if there are no Bids, on the Effective assume full responsibility for any damage to any
Date of the Agreement. CONTRACTOR shall pay all such land or area, or to the owner or occupant
charges of utility owners for connections to the Work, and thereof, or of any adjacent land or areas resulting
OWNER shall pay all charges of such utility owners for from the performance of the Work.
capital costs related thereto, such as plant investment fees.
2. Should any claim be made by any such
6.09 Laws and Regulations owner or occupant because of the performance of
the Work, CONTRACTOR shall promptly settle
A. CONTRACTOR shall give all notices and comply with such other party by negotiation or otherwise
with all Laws and Regulations applicable to the resolve the claim by arbitration or other dispute
performance of the Work. Except where otherwise resolution proceeding or at law.
expressly required by applicable Laws and Regulations,
neither OWNER nor ENGINEER shall be responsible for 3. To the fullest extent permitted by Laws
monitoring CONTRACTOR’s compliance with any Laws and Regulations, CONTRACTOR shall indemnify
or Regulations. and hold harmless OWNER, ENGINEER,
ENGINEER’s Consultant, and the officers,
B. If CONTRACTOR performs any Work knowing directors, partners, employees, agents, and other
or having reason to know that it is contrary to Laws or consultants of each and any of them from and
Regulations, CONTRACTOR shall bear all claims, costs, against all claims, costs, losses, and damages
General Conditions Page 00700-22
(including but not limited to all fees and charges of 1. all persons on the Site or who may be
engineers, architects, attorneys, and other affected by the Work;
professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to 2. all the Work and materials and equip-
any claim or action, legal or equitable, brought by ment to be incorporated therein, whether in storage
any such owner or occupant against OWNER, on or off the Site; and
ENGINEER, or any other party indemnified
hereunder to the extent caused by or based upon 3. other property at the Site or adjacent
CONTRACTOR's performance of the Work. thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and
B. Removal of Debris During Performance of the Underground Facilities not designated for removal,
Work: During the progress of the Work CONTRACTOR relocation, or replacement in the course of
shall keep the Site and other areas free from accumulations construction.
of waste materials, rubbish, and other debris. Removal and
disposal of such waste materials, rubbish, and other debris B. CONTRACTOR shall comply with all applicable
shall conform to applicable Laws and Regulations. Laws and Regulations relating to the safety of persons or
property, or to the protection of persons or property from
C. Cleaning: Prior to Substantial Completion of the damage, injury, or loss; and shall erect and maintain all
Work CONTRACTOR shall clean the Site and make it necessary safeguards for such safety and protection.
ready for utilization by OWNER. At the completion of the CONTRACTOR shall notify owners of adjacent property
Work CONTRACTOR shall remove from the Site all tools, and of Underground Facilities and other utility owners
appliances, construction equipment and machinery, and when prosecution of the Work may affect them, and shall
surplus materials and shall restore to original condition all cooperate with them in the protection, removal, relocation,
property not designated for alteration by the Contract and replacement of their property. All damage, injury, or
Documents. loss to any property referred to in paragraph 6.13.A.2 or
6.13.A.3 caused, directly or indirectly, in whole or in part,
D. Loading Structures: CONTRACTOR shall not by CONTRACTOR, any Subcontractor, Supplier, or any
load nor permit any part of any structure to be loaded in any other individual or entity directly or indirectly employed by
manner that will endanger the structure, nor shall any of them to perform any of the Work, or anyone for
CONTRACTOR subject any part of the Work or adjacent whose acts any of them may be liable, shall be remedied by
property to stresses or pressures that will endanger it. CONTRACTOR (except damage or loss attributable to the
fault of Drawings or Specifications or to the acts or
6.12 Record Documents omissions of OWNER or ENGINEER or ENGINEER’s
Consultant, or anyone employed by any of them, or anyone
A. CONTRACTOR shall maintain in a safe place at for whose acts any of them may be liable, and not
the Site one record copy of all Drawings, Specifications, attributable, directly or indirectly, in whole or in part, to the
Addenda, Written Amendments, Change Orders, Work fault or negligence of CONTRACTOR or any
Change Directives, Field Orders, and written interpretations Subcontractor, Supplier, or other individual or entity
and clarifications in good order and annotated to show directly or indirectly employed by any of them).
changes made during construction. These record CONTRACTOR’s duties and responsibilities for safety and
documents together with all approved Samples and a for protection of the Work shall continue until such time as
counterpart of all approved Shop Drawings will be all the Work is completed and ENGINEER has issued a
available to ENGINEER for reference. Upon completion notice to OWNER and CONTRACTOR in accordance
of the Work, these record documents, Samples, and Shop with paragraph 14.07.B that the Work is acceptable (except
Drawings will be delivered to ENGINEER for OWNER. as otherwise expressly provided in connection with
Substantial Completion).
6.13 Safety and Protection
6.14 Safety Representative
SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
00800) A. CONTRACTOR shall designate a qualified and
experienced safety representative at the Site whose duties
A. CONTRACTOR shall be solely responsible for and responsibilities shall be the prevention of accidents and
initiating, maintaining and supervising all safety precau- the maintaining and supervising of safety precautions and
tions and programs in connection with the Work. programs.
CONTRACTOR shall take all necessary precautions for the
safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
General Conditions Page 00700-23
6.15 Hazard Communication Programs D. Submittal Procedures
A. CONTRACTOR shall be responsible for coordi- 1. Before submitting each Shop Drawing or
nating any exchange of material safety data sheets or other Sample, CONTRACTOR shall have determined and
hazard communication information required to be made verified:
available to or exchanged between or among employers at
the Site in accordance with Laws or Regulations. a. all field measurements, quantities,
dimensions, specified performance criteria,
6.16 Emergencies installation requirements, materials, catalog
