Okaloosa County BOCC — March 4, 2014 — Repair & Paint Countryview & Bluewater Tanks — reading text
Part 10 of 40. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 36-Repair _ Paint Countryview _ Bluewater Tanks.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
A. Standards, Specifications, Codes, Laws, and
will be held to review for acceptability to ENGINEER as Regulations
provided below the schedules submitted in accordance with
paragraph 2.05.B. CONTRACTOR shall have an 1. Reference to standards, specifications,
additional ten days to make corrections and adjustments manuals, or codes of any technical society,
and to complete and resubmit the schedules. No progress organization, or association, or to Laws or
payment shall be made to CONTRACTOR until acceptable Regulations, whether such reference be specific or
schedules are submitted to ENGINEER. by implication, shall mean the standard,
specification, manual, code, or Laws or Regulations
1. The progress schedule will be acceptable in effect at the time of opening of Bids (or on the
to ENGINEER if it provides an orderly progression Effective Date of the Agreement if there were no
of the Work to completion within any specified Bids), except as may be otherwise specifically stated
Milestones and the Contract Times. Such in the Contract Documents.
acceptance will not impose on ENGINEER
General Conditions Page 00700-10
2. No provision of any such standard,
specification, manual or code, or any instruction of 3.04 Amending and Supplementing Contract
a Supplier shall be effective to change the duties or Documents
responsibilities of OWNER, CONTRACTOR, or
ENGINEER, or any of their subcontractors, A. The Contract Documents may be amended to
consultants, agents, or employees from those set provide for additions, deletions, and revisions in the Work
forth in the Contract Documents, nor shall any such or to modify the terms and conditions thereof in one or
provision or instruction be effective to assign to more of the following ways: (i) a Written Amendment; (ii)
OWNER, ENGINEER, or any of ENGINEER’s a Change Order; or (iii) a Work Change Directive.
Consultants, agents, or employees any duty or
authority to supervise or direct the performance of B. The requirements of the Contract Documents may
the Work or any duty or authority to undertake be supplemented, and minor variations and deviations in
responsibility inconsistent with the provisions of the the Work may be authorized, by one or more of the
Contract Documents. following ways: (i) a Field Order; (ii) ENGINEER’s
approval of a Shop Drawing or Sample; or (iii)
3.03 Reporting and Resolving Discrepancies ENGINEER’s written interpretation or clarification.
A. Reporting Discrepancies 3.05 Reuse of Documents
1. If, during the performance of the Work, A. CONTRACTOR and any Subcontractor or
CONTRACTOR discovers any conflict, error, Supplier or other individual or entity performing or
ambiguity, or discrepancy within the Contract furnishing any of the Work under a direct or indirect
Documents or between the Contract Documents and contract with OWNER: (i) shall not have or acquire any
any provision of any Law or Regulation applicable title to or ownership rights in any of the Drawings,
to the performance of the Work or of any standard, Specifications, or other documents (or copies of any
specification, manual or code, or of any instruction thereof) prepared by or bearing the seal of ENGINEER or
of any Supplier, CONTRACTOR shall report it to ENGINEER’s Consultant, including electronic media
ENGINEER in writing at once. CONTRACTOR editions; and (ii) shall not reuse any of such Drawings,
shall not proceed with the Work affected thereby Specifications, other documents, or copies thereof on
(except in an emergency as required by paragraph extensions of the Project or any other project without
6.16.A) until an amendment or supplement to the written consent of OWNER and ENGINEER and specific
Contract Documents has been issued by one of the written verification or adaption by ENGINEER. This
methods indicated in paragraph 3.04; provided, prohibition will survive final payment, completion, and
however, that CONTRACTOR shall not be liable to acceptance of the Work, or termination or completion of
OWNER or ENGINEER for failure to report any the Contract. Nothing herein shall preclude
such conflict, error, ambiguity, or discrepancy CONTRACTOR from retaining copies of the Contract
unless CONTRACTOR knew or reasonably should Documents for record purposes.
have known thereof.
B. Resolving Discrepancies ARTICLE 4 - AVAILABILITY OF LANDS;
SUBSURFACE AND PHYSICAL CONDITIONS;
1. Except as may be otherwise specifically REFERENCE POINTS
stated in the Contract Documents, the provisions of
the Contract Documents shall take precedence in 4.01 Availability of Lands
resolving any conflict, error, ambiguity, or
discrepancy between the provisions of the Contract A. OWNER shall furnish the Site. OWNER shall
Documents and: notify CONTRACTOR of any encumbrances or restrictions
not of general application but specifically related to use of
a. the provisions of any standard, the Site with which CONTRACTOR must comply in
specification, manual, code, or instruction performing the Work. OWNER will obtain in a timely
(whether or not specifically incorporated by manner and pay for easements for permanent structures or
reference in the Contract Documents); or permanent changes in existing facilities. If
CONTRACTOR and OWNER are unable to agree on
b. the provisions of any Laws or entitlement to or on the amount or extent, if any, of any
Regulations applicable to the performance of the adjustment in the Contract Price or Contract Times, or both,
Work (unless such an interpretation of the as a result of any delay in OWNER’s furnishing the Site,
provisions of the Contract Documents would CONTRACTOR may make a Claim therefor as provided in
result in violation of such Law or Regulation). paragraph 10.05.
General Conditions Page 00700-11
4.03 Differing Subsurface or Physical Conditions
B. Upon reasonable written request, OWNER shall
furnish CONTRACTOR with a current statement of record SEE ALSO SUPPLEMENTARY CONDITIONS (SECTION
legal title and legal description of the lands upon which the 00800)
Work is to be performed and OWNER’s interest therein as
necessary for giving notice of or filing a mechanic's or A. Notice: If CONTRACTOR believes that any
construction lien against such lands in accordance with subsurface or physical condition at or contiguous to the Site
applicable Laws and Regulations. that is uncovered or revealed either:
C. CONTRACTOR shall provide for all additional 1. is of such a nature as to establish that any
lands and access thereto that may be required for temporary “technical data” on which CONTRACTOR is
construction facilities or storage of materials and equip- entitled to rely as provided in paragraph 4.02 is
ment. materially inaccurate; or
4.02 Subsurface and Physical Conditions 2. is of such a nature as to require a change
in the Contract Documents; or
A. Reports and Drawings: The Supplementary
Conditions identify: 3. differs materially from that shown or
indicated in the Contract Documents; or
1. those reports of explorations and tests of
subsurface conditions at or contiguous to the Site 4. is of an unusual nature, and differs materially from
that ENGINEER has used in preparing the Contract conditions ordinarily encountered and generally recognized
Documents; and as inherent in work of the character provided for in the
Contract Documents;
2. those drawings of physical conditions in
or relating to existing surface or subsurface then CONTRACTOR shall, promptly after becoming aware
structures at or contiguous to the Site (except thereof and before further disturbing the subsurface or
Underground Facilities) that ENGINEER has used physical conditions or performing any Work in connection
in preparing the Contract Documents. therewith (except in an emergency as required by paragraph
6.16.A), notify OWNER and ENGINEER in writing about
B. Limited Reliance by CONTRACTOR on Technical such condition. CONTRACTOR shall not further disturb
Data Authorized: CONTRACTOR may rely upon the such condition or perform any Work in connection
general accuracy of the “technical data” contained in such therewith (except as aforesaid) until receipt of written order
reports and drawings, but such reports and drawings are not to do so.
Contract Documents. Such “technical data” is identified in
the Supplementary Conditions. Except for such reliance on B. ENGINEER’s Review: After receipt of written
such “technical data,” CONTRACTOR may not rely upon notice as required by paragraph 4.03.A, ENGINEER will
or make any Claim against OWNER, ENGINEER, or any promptly review the pertinent condition, determine the
of ENGINEER’s Consultants with respect to: necessity of OWNER's obtaining additional exploration or
tests with respect thereto, and advise OWNER in writing
1. the completeness of such reports and (with a copy to CONTRACTOR) of ENGINEER’s
drawings for CONTRACTOR’s purposes, includ- findings and conclusions.
ing, but not limited to, any aspects of the means,
methods, techniques, sequences, and procedures of C. Possible Price and Times Adjustments
construction to be employed by