permitting Three ( 3) times the permit fee Res 2024- 13 09/24/ 24 Sec. 3. 01. 05) Change of contractor, transfer of permit Prorate balance of work Res 2003- 01 1/ 28/ 03 Sec. 3. 01. 12) Notice of Commencement ( NOC) ( Sec. 713. 135) 5. 00 Expired permit ( Sec. 3. 01. 08) Re -issuance requires fee to be paid Res 07- 15 09/05/ 07 Conditional; no work has commenced and permit has Refund of permit fee ( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07 not expired; requires written notice to the BO PermitPermit FeesFees No permit required for cosmetic work only, such as 500 or less carpet,carpet, tile,tile, painting,painting, landscaping,landscaping, etc.etc. ExceptionsExceptions ResRes 07-07- 1515 09/09/ 05/05/ 0707 includeinclude anyany structuralstructural changechange oror anyany workwork thatthat requires an inspection per the FBC. 39.39. 0000 forfor thethe fustfust thousand,thousand, plusplus $ $ 6.6. 6060 forfor eacheach 501501 toto$ $ 50,50, 000000 Res.Res. 2010-2010- 2525 09/09/ 28/28/ 1010 PermitPermit basedbased onon valuevalue thousand or fraction thereof, to and including $50,000 ofof work,work, includesincludes labor,labor, materials,materials, sitesite work,work, 360. 55 for first $50, 000 plus $5. 25 for each and design fees$ 50,001 to $ 100, 000 additionaladditional thousandthousand oror fraction fraction thereofthereof toto andand Res.Res. 2010-2010- 2525 09/09/ 28/28/ 1010 including $ 100, 000 623. 00 for the fust $ 100,000 plus $4. 00 for each 100, 001 to $ 500,000 additionaladditional thousandthousand oror fractionfraction thereofthereof toto andand Res.Res. 2010-2010- 2525 09/09/ 28/28/ 1010 including $500, 000 2,219.00 for the first $500, 000 plus $2. 75 for each 500,500, 001001 andand upup Res. 2010- 25 09/28/ 10 additionaladditional thousandthousand oror fractionfraction thereofthereof PlanPlan checkcheck feefee 50% of building fee ( Sec. 3. 02.06) Res 2009- 35 09/09/ 09 ThresholdThreshold buildingbuilding transmittal/transmittal/ processing processing fee/fee/ ICCICC 206.00 Res 2008- 15 04/ 08/ 08 MovingMoving FeeFee 113. 50 Res 2008- 15 04/ 08/ 08 Demolition Fee 59. 50 plus $ 9.45 per 2, 000 sq ft above 20,000 sq ft Res. 2010- 25 09/28/ 10 or fraction thereof Additional Inspection Fee 38. 00 Res. 2010- 25 09/ 28/ 10 Additional Inspection Fee - after hours 50. 00 per hour (2 hour minimum) Res 2014-2 02/ 11/ 14 Re -Inspection Fee ( the building inspector returns to First - $38. 00 the job site to review corrected work denied on the Second - $ 38. 00 Res. 2010-25 09/ 28/ 10 previous inspection for the same violation) Third and more - $ 115. 50 Certificate of Occupancy 38. 00 Res. 2010-25 09/28/ 10 Certificate of Completion 38. 00 Res. 2010-25 09/28/ 10 Temporary Certificate of Occupancy 270. 50 Res. 2010-25 09/28/ 10 Mechanical Permits and Inspection Permit Fee Base $ 39. 00 Res. 2010-25 09/ 28/ 10 15. 00 for the first $ 1, 000 or fraction thereof of the Inspection of heating, ventilation, ductwork, air $ valuation of installation plus $2. 75 for each additional Res. 2010- 25 09/ 28/ 10 conditioning and refrigeration systems 1, 000 or fraction thereof Inspecting repairs, alterations, and additions on 5. 80 plus $3. 45 for each additional $ 1, 000 or Res. 2010- 25 09/ 28/ 10 existing systems fraction thereof

Download this text file with its original spacing ↓