READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2025-06 FY 2024-25 Comprehensive Fee Schedule — reading text
Part 6 of 13. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-41991-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
permitting
Three ( 3) times the permit fee Res 2024- 13 09/24/ 24
Sec. 3. 01. 05)
Change of contractor, transfer of permit
Prorate balance of work Res 2003- 01 1/ 28/ 03
Sec. 3. 01. 12)
Notice of Commencement ( NOC) ( Sec. 713. 135) 5. 00
Expired permit ( Sec. 3. 01. 08) Re -issuance requires fee to be paid Res 07- 15 09/05/ 07
Conditional; no work has commenced and permit has
Refund of permit fee ( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07
not expired; requires written notice to the BO
PermitPermit FeesFees
No permit required for cosmetic work only, such as
500 or less
carpet,carpet, tile,tile, painting,painting, landscaping,landscaping, etc.etc. ExceptionsExceptions
ResRes 07-07- 1515 09/09/ 05/05/ 0707
includeinclude anyany structuralstructural changechange oror anyany workwork thatthat
requires an inspection per the FBC.
39.39. 0000 forfor thethe fustfust thousand,thousand, plusplus
$ $ 6.6. 6060 forfor eacheach
501501 toto$ $ 50,50, 000000 Res.Res. 2010-2010- 2525 09/09/ 28/28/ 1010
PermitPermit basedbased onon valuevalue thousand or fraction thereof, to and including $50,000
ofof work,work, includesincludes labor,labor,
materials,materials, sitesite work,work, 360. 55 for first $50, 000 plus $5. 25 for each
and design fees$ 50,001 to $ 100, 000 additionaladditional thousandthousand oror fraction fraction thereofthereof toto andand Res.Res. 2010-2010- 2525 09/09/ 28/28/ 1010
including $ 100, 000
623. 00 for the fust $ 100,000 plus $4. 00 for each
100, 001 to $ 500,000 additionaladditional thousandthousand oror fractionfraction thereofthereof toto andand Res.Res. 2010-2010- 2525 09/09/ 28/28/ 1010
including $500, 000
2,219.00 for the first $500, 000 plus $2. 75 for each
500,500, 001001 andand upup Res. 2010- 25 09/28/ 10
additionaladditional thousandthousand oror fractionfraction thereofthereof
PlanPlan checkcheck feefee 50% of building fee ( Sec. 3. 02.06) Res 2009- 35 09/09/ 09
ThresholdThreshold buildingbuilding transmittal/transmittal/ processing processing fee/fee/ ICCICC 206.00 Res 2008- 15 04/ 08/ 08
MovingMoving FeeFee 113. 50 Res 2008- 15 04/ 08/ 08
Demolition Fee 59. 50 plus $ 9.45 per 2, 000 sq ft above 20,000 sq ft
Res. 2010- 25 09/28/ 10
or fraction thereof
Additional Inspection Fee 38. 00 Res. 2010- 25 09/ 28/ 10
Additional Inspection Fee - after hours 50. 00 per hour (2 hour minimum) Res 2014-2 02/ 11/ 14
Re -Inspection Fee ( the building inspector returns to First - $38. 00
the job site to review corrected work denied on the Second - $ 38. 00 Res. 2010-25 09/ 28/ 10
previous inspection for the same violation) Third and more - $ 115. 50
Certificate of Occupancy 38. 00 Res. 2010-25 09/28/ 10
Certificate of Completion 38. 00 Res. 2010-25 09/28/ 10
Temporary Certificate of Occupancy 270. 50 Res. 2010-25 09/28/ 10
Mechanical Permits and Inspection
Permit Fee Base $ 39. 00 Res. 2010-25 09/ 28/ 10
15. 00 for the first $ 1, 000 or fraction thereof of the
Inspection of heating, ventilation, ductwork, air $
valuation of installation plus $2. 75 for each additional Res. 2010- 25 09/ 28/ 10
conditioning and refrigeration systems
1, 000 or fraction thereof
Inspecting repairs, alterations, and additions on 5. 80 plus $3. 45 for each additional $ 1, 000 or
Res. 2010- 25 09/ 28/ 10
existing systems fraction thereof
