READ ALONGSIDE THE SOURCE

Fort Walton Beach Resolution — 2023-14 Amending the Comprehensive Fee Schedule for FY 2023-24 — reading text

Part 7 of 14. These parts divide the reading text for browsing; they are not the source document's page numbers.

Machine-extracted text — fwb-41367-original.pdf

Machine-extracted OCR text · Review label: Machine produced / unreviewed

Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.

Notice of Commencement( NOC)( Sec. 713, 135) 5. 00 Expired permit( Sec. 3. 01. 08) Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07 Conditional; no work has commenced and permit has Refund of permit fee( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07 not expired; requires written notice to the BO Construction Permit Fees No permit required for cosmetic work only, such as carpet, tile, painting, landscaping, etc. Exceptions Res 07-] 5 09/ 05/ 07 500 or less include any structural change or any work that requires an inspection per the FBC. 39, 00 for the first thousand, plus$ 6. 60 for each 501 to$ 50, 000 Res. 2010- 25 09/ 28/ 10 Permit based on value thousand or fraction thereof, to and including$ 50,000 of work, includes labor, 360.55 for first$ 50, 000 plus$ 5. 25 for each materials, site work, 50, 001 to$ 100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 and design fees $ including$ 100, 000 623. 00 for the first$ 100, 000 plus$ 4. 00 for each I 100, 001 to$ 500, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10 including$ 500, 000 2, 219. 00 far the first$ 500, 000 plus$ 2. 75 for each 500, 001 and up Res. 2010- 25 09/28/ 10 additional thousand or fraction thereof Plan check fee 50% of building fee( Sec. 3. 02. 06) Res 2009-35 09/ 09/09 Threshold building transmittal/ processing fee/ ICC 206.00 Res 2008- 15 04/ 08/ 08 Moving Fee 113. 50 Res 2008- 15 04/ 08/ 08 59. 50 plus$ 9.45 per 2, 000 sq ft above 20,000 sq f1 Res. 2010- 25 09/28/ 10 Demolition Fee or fraction thereof Additional Inspection Fee 38. 00 Res. 2010- 25 09/28/ 10 Additional Inspection Fee- after hours 50.00 per hour( 2 hour minimum) Res 2014- 2 02/ 11/ 14 Re- Inspection Fee( the building inspector returns to First-$ 38. 00 the job site to review corrected work denied on the Second-$ 38, 00 Res. 2010- 25 09/ 28/ 10 previous inspection for the same violation) Third and more-$ 115. 50 Certificate of Occupancy 38. 00 Res. 2010- 25 09/ 28/ 10 Certificate of Completion 38. 00 Res. 2010- 25 09/ 28/ 10 Temporary Certificate of Occupancy 270.50 Res. 2010- 25 09/ 28/ 10 Mechanical Permits and Inspection Permit Fee Base 39. 00 Res. 2010- 25 09/28/ 10 15. 00 for the first$ 1, 000 or fraction thereof of the Inspection of heating, ventilation, ductwork, air $ valuation of installation plus$ 2. 75 for each additional Res. 2010- 25 09/ 28/ 10 conditioning and refrigeration systems 100Q or fraction thereof Inspecting repairs, alterations, and additions on 5. 80 plus$ 3. 45 for each additional$ 1, 000 or Res. 2010- 25 ( 19/ 28110 existing systems fraction thereof 12 U: 1FinancelFinancelFee Schedule12023, Spetember19. 26. 2023 Comprehensive Fee Schedule FY 2023- 24 Department and/ or Enacting Resolution/ Fee Description Current Rate Service Ordinance Inspecting Boilers Boiler Inspections 40. 00 Res. 2010- 25 09/ 28/ 10 Reinspection of a heating, ventilation, air First-$ 38.00 conditioning or refrigeration system, or boiler Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10 inspection( reinspection same as above) Third and more-$ 115. 50 Inspection for permitting temporary operation of First-$ 38.00 heating, ventilating, refrigeration, or air condition Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10 system( reinspection same as above) Third and more-$ 115. 50 Reduced by 50% housing, unless permit is for Rehabilitation of substandard minimum of$ 5. 00, Repairs, alterations and additions Res 2003- 01 1/ 28/ 03 to an existing system under$ 500. 00 Plumbing and Cas Permits Base Permit Fee 39.00 Res. 2010- 25 09/ 28/ 10 Plus, per plumbing fixture, floor drain or trap, 3. 45 Res. 2010- 25 09/ 28/ 10 including water and drainage pipe Plus, per sewer connection 12. 00 Res. 2010- 25 09/ 28/ 10 Plus, per water heater and/ or vent 3. 15 Res. 2010- 25 09/ 28/ 10 For installation, alteration or repair of water piping 6. 05 Res. 2010- 25 09/ 28/ 10 and/ or water treating equipment For repair/ alteration of drainage or vent piping 6. 05 Res. 2010- 25 09/ 28/ 10 For vacuum breakers or backflow protective to 5 $ 3. 15 devices subsequent to the installation of the piping Res. 2010- 25 09/ 28/ 10 over 5, each-$ 2. 05 or equipment served First-$ 38.00 Reinspection for faulty materials, equipment, 38. 00 Res. 2010- 25 09/ 28/ 10 apparatus or Third and more-$ 115. 50 Electrical Permits Base Permit Fee 39. 00 Res. 2010- 25 09/ 28/ 10 Plus, per circuit 1. 85 Res. 2010- 25 09/ 28/ 10 Temporary pole 18. 50 Res. 2010- 25 09/ 28/ 10 First-$ 38.00 Reinspection for faulty materials, equipment, 38. 00 Res. 2010- 25 09/ 28/ 10 apparatus or Third and more-$ 115. 50 Rehabilitation of substandard Reduced by 50% housing minimum of$3. 00 Res 2003- 01 1/ 28/ 03 Early Power Fee 38. 00

Download this text file with its original spacing ↓