READ ALONGSIDE THE SOURCE
Fort Walton Beach Resolution — 2023-14 Amending the Comprehensive Fee Schedule for FY 2023-24 — reading text
Part 7 of 14. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-41367-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
Notice of Commencement( NOC)( Sec. 713, 135) 5. 00
Expired permit( Sec. 3. 01. 08) Re- issuance requires fee to be paid Res 07- 15 09/ 05/ 07
Conditional; no work has commenced and permit has
Refund of permit fee( Sec. 3. 01. 10) Res 07- 15 09/ 05/ 07
not expired; requires written notice to the BO
Construction Permit Fees
No permit required for cosmetic work only, such as
carpet, tile, painting, landscaping, etc. Exceptions Res 07-] 5 09/ 05/ 07
500 or less
include any structural change or any work that
requires an inspection per the FBC.
39, 00 for the first thousand, plus$ 6. 60 for each
501 to$ 50, 000 Res. 2010- 25 09/ 28/ 10
Permit based on value thousand or fraction thereof, to and including$ 50,000
of work, includes labor,
360.55 for first$ 50, 000 plus$ 5. 25 for each
materials, site work,
50, 001 to$ 100, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
and design fees $
including$ 100, 000
623. 00 for the first$ 100, 000 plus$ 4. 00 for each
I
100, 001 to$ 500, 000 additional thousand or fraction thereof to and Res. 2010- 25 09/ 28/ 10
including$ 500, 000
2, 219. 00 far the first$ 500, 000 plus$ 2. 75 for each
500, 001 and up Res. 2010- 25 09/28/ 10
additional thousand or fraction thereof
Plan check fee 50% of building fee( Sec. 3. 02. 06) Res 2009-35 09/ 09/09
Threshold building transmittal/ processing fee/ ICC 206.00 Res 2008- 15 04/ 08/ 08
Moving Fee 113. 50 Res 2008- 15 04/ 08/ 08
59. 50 plus$ 9.45 per 2, 000 sq ft above 20,000 sq f1 Res. 2010- 25 09/28/ 10
Demolition Fee
or fraction thereof
Additional Inspection Fee 38. 00 Res. 2010- 25 09/28/ 10
Additional Inspection Fee- after hours 50.00 per hour( 2 hour minimum) Res 2014- 2 02/ 11/ 14
Re- Inspection Fee( the building inspector returns to First-$ 38. 00
the job site to review corrected work denied on the Second-$ 38, 00 Res. 2010- 25 09/ 28/ 10
previous inspection for the same violation) Third and more-$ 115. 50
Certificate of Occupancy 38. 00 Res. 2010- 25 09/ 28/ 10
Certificate of Completion 38. 00 Res. 2010- 25 09/ 28/ 10
Temporary Certificate of Occupancy 270.50 Res. 2010- 25 09/ 28/ 10
Mechanical Permits and Inspection
Permit Fee Base 39. 00 Res. 2010- 25 09/28/ 10
15. 00 for the first$ 1, 000 or fraction thereof of the
Inspection of heating, ventilation, ductwork, air $ valuation of installation plus$ 2. 75 for each additional Res. 2010- 25 09/ 28/ 10
conditioning and refrigeration systems
100Q or fraction thereof
Inspecting repairs, alterations, and additions on 5. 80 plus$ 3. 45 for each additional$ 1, 000 or
Res. 2010- 25 ( 19/ 28110
existing systems fraction thereof
12
U: 1FinancelFinancelFee Schedule12023, Spetember19. 26. 2023 Comprehensive Fee Schedule FY 2023- 24
Department and/ or Enacting Resolution/
Fee Description Current Rate
Service Ordinance
Inspecting Boilers
Boiler Inspections 40. 00 Res. 2010- 25 09/ 28/ 10
Reinspection of a heating, ventilation, air First-$ 38.00
conditioning or refrigeration system, or boiler Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10
inspection( reinspection same as above) Third and more-$ 115. 50
Inspection for permitting temporary operation of First-$ 38.00
heating, ventilating, refrigeration, or air condition Second-$ 38. 00 Res. 2010- 25 09/ 28/ 10
system( reinspection same as above) Third and more-$ 115. 50
Reduced by 50% housing, unless permit is for
Rehabilitation of substandard minimum of$ 5. 00, Repairs, alterations and additions Res 2003- 01 1/ 28/ 03
to an existing system under$ 500. 00
Plumbing and Cas Permits
Base Permit Fee 39.00 Res. 2010- 25 09/ 28/ 10
Plus, per plumbing fixture, floor drain or trap, 3. 45 Res. 2010- 25 09/ 28/ 10
including water and drainage pipe
Plus, per sewer connection 12. 00 Res. 2010- 25 09/ 28/ 10
Plus, per water heater and/ or vent 3. 15 Res. 2010- 25 09/ 28/ 10
For installation, alteration or repair of water piping 6. 05 Res. 2010- 25 09/ 28/ 10
and/ or water treating equipment
For repair/ alteration of drainage or vent piping 6. 05 Res. 2010- 25 09/ 28/ 10
For vacuum breakers or backflow protective
to 5 $ 3. 15
devices subsequent to the installation of the piping Res. 2010- 25 09/ 28/ 10
over 5, each-$ 2. 05
or equipment served
First-$ 38.00
Reinspection for faulty materials, equipment, 38. 00 Res. 2010- 25 09/ 28/ 10
apparatus or
Third and more-$ 115. 50
Electrical Permits
Base Permit Fee 39. 00 Res. 2010- 25 09/ 28/ 10
Plus, per circuit 1. 85 Res. 2010- 25 09/ 28/ 10
Temporary pole 18. 50 Res. 2010- 25 09/ 28/ 10
First-$ 38.00
Reinspection for faulty materials, equipment, 38. 00 Res. 2010- 25 09/ 28/ 10
apparatus or
Third and more-$ 115. 50
Rehabilitation of substandard Reduced by 50% housing minimum of$3. 00 Res 2003- 01 1/ 28/ 03
Early Power Fee 38. 00
