READ ALONGSIDE THE SOURCE
Okaloosa County BOCC — July 2, 2013 — FAA Grant Application for ARFF Building — reading text
Part 7 of 10. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — 34-FAA Grant Application for ARFF Building.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
authority, and
financial resources to carry out all such obligations, the sponsor shall
insert in the contract or document transferring or disposing of the
sponsor's interest, and make binding upon the transferee all of the terms,
conditions, and assurances contained in this grant agreement.
c. For all noise compatibility program projects which are to be carried out by
another unit of local government or are on property owned by a unit of
local government other than the sponsor, it will enter into an agreement
with that government. Except as otherwise specified by the Secretary, that
agreement shall obligate that government to the same terms, conditions,
and assurances that would be applicable to it if it applied directly to the
FAA for a grant to undertake the noise compatibility program project.
That agreement and changes thereto must be satisfactory to the Secretary.
It will take steps to enforce this agreement against the local government if
there is substantial non-compliance with the terms of the agreement.
d. For noise compatibility program projects to be carried out on privately
owned property, it will enter into an agreement with the owner of that
property which includes provisions specified by the Secretary. It will take
steps to enforce this agreement against the property owner whenever there
is substantial non-compliance with the terms of the agreement.
e, If the sponsor is a private sponsor, it will take steps satisfactory to the
Secretary to ensure that the airport will continue to function as a public-
use airport in accordance with these assurances for the duration of these
assurances.
f. If an arrangement is made for management and operation of the airport by
any agency or person other than the sponsor or an employee of the
sponsor, the sponsor will reserve sufficient rights and authority to insure
Airport Sponsor Assurances (4/2012) ARP Page 5 of 17
10.
11.
that the airport will be operated and maintained in accordance Title 49,
United States Code, the regulations and the terms, conditions and
assurances in this grant agreement and shall insure that such arrangement
also requires compliance therewith.
g. Sponsors of commercial service airports will not permit or enter into any
arrangement that results in permission for the owner or tenant of a
property used as a residence, or zoned for residential use, to taxi an
aircraft between that property and any location on airport. Sponsors of
general aviation airports entering into any arrangement that results in
permission for the owner of residential real property adjacent to or near
the airport must comply with the requirements of Sec. 136 of Public Law
112-95 and the sponsor assurances.
Consistency with Local Plans. The project is reasonably consistent with plans
(existing at the time of submission of this application) of public agencies that are
authorized by the State in which the project is located to plan for the development
of the area surrounding the airport.
Consideration of Local Interest. It has given fair consideration to the interest of
communities in or near where the project may be located.
Consultation with Users. In making a decision to undertake any airport
development project under Title 49, United States Code, it has undertaken
reasonable consultations with affected parties using the airport at which project is
proposed.
Public Hearings. In projects involving the location of an airport, an airport
runway, or a major runway extension, it has afforded the opportunity for public
hearings for the purpose of considering the economic, social, and environmental
effects of the airport or runway location and its consistency with goals and
objectives of such planning as has been carried out by the community and it shall,
when requested by the Secretary, submit a copy of the transcript of such hearings
to the Secretary. Further, for such projects, it has on its management board either
voting representation from the communities where the project is located or has
advised the communities that they have the right to petition the Secretary
concerning a proposed project.
Air and Water Quality Standards. In projects involving airport location, a
major runway extension, or runway location it will provide for the Governor of
the state in which the project is located to certify in writing to the Secretary that
the project will be located, designed, constructed, and operated so as to comply
with applicable air and water quality standards. In any case where such standards
have not been approved and where applicable air and water quality standards have
been promulgated by the Administrator of the Environmental Protection Agency,
certification shall be obtained from such Administrator. Notice of certification or
refusal to certify shall be provided within sixty days after the project application
has been received by the Secretary.
Pavement Preventive Maintenance. With respect to a project approved after
January 1, 1995, for the replacement or reconstruction of pavement at the airport,
Airport Sponsor Assurances (4/2012) ARP Page 6 of 17
it assures or certifies that it has implemented an effective airport pavement
maintenance-management program and it assures that it will use such program for
the useful life of any pavement constructed, reconstructed or repaired with
Federal financial assistance at the airport. It will provide such reports on
pavement condition and pavement management programs as the Secretary
determines may be useful.
12. Terminal Development Prerequisites. For projects which include terminal
development at a public use airport, as defined in Title 49, it has, on the date of
submittal of the project grant application, all the safety equipment required for
certification of such airport under section 44706 of Title 49, United States Code,
and all the security equipment required by rule or regulation, and has provided for
access to the passenger enplaning and deplaning area of such airport to passengers
enplaning and deplaning from aircraft other than air carrier aircraft.
13. Accounting System, Audit, and Record Keeping Requirements.
a. It shall keep all project accounts and records which fully disclose the
amount and disposition by the recipient of the proceeds of this grant, the
total cost of the project in connection with which this grant is given or
used, and the amount or nature of that portion of the cost of the project
supplied by other sources, and such other financial records pertinent to the
project. The accounts and records shall be kept in accordance with an
accounting system that will facilitate an effective audit in accordance with
the Single Audit Act of 1984.
b. It shall make available to the Secretary and the Comptroller General of the
United States, or any of their duly authorized representatives, for the
purpose of audit and examination, any books, documents, papers, and
records of the recipient that are pertinent to this grant. The Secretary may
require that an appropriate audit be conducted by a recipient. In any case
in which an independent audit is made of the accounts of a sponsor
relating to the disposition of the proceeds of a grant or relating to the
project in connection with which this grant was given or used, it shall file
a certified copy of such audit with the Comptroller General of the United.
States not later than six (6) months following the close of the fiscal year
for which the audit was made.
14. Minimum Wage Rates. It shall include, in all contracts in excess of $2,000 for
work on any projects funded under this grant agreement which involve labor,
provisions establishing minimum rates of wages, to be predetermined by the
Secretary of Labor, in accordance with the Davis-Bacon Act, as amended (40
U.S.C. 276a-276a-5), which contractors shall pay to skilled and unskilled labor,
and such minimum rates shall be stated in the invitation for bids and shall be
included in proposals or bids for the work.
15.‘ Veteran's Preference. It shall include in all contracts for work on any project
funded under this grant agreement which involve labor, such provisions as are
necessary to insure that, in the employment of labor (except in executive,
administrative, and supervisory positions), preference shall be given to Vietnam
Airport Sponsor Assurances (4/2012) ARP Page 7 of 17
era veterans, Persian Gulf veterans, Afghanistan-Iraq war veterans, disabled
veterans, and small business concerns owned and controlled by disabled veterans
as defined in Section 47112 of Title 49, United States Code. However, this
preference shall apply only where the individuals are available and qualified to
perform the work to which the employment relates.
16. Conformity to Plans and Specifications. It will execute the project subject to
plans, specifications, and schedules approved by the Secretary. Such plans,
specifications, and schedules shall be submitted to the Secretary prior to
commencement of site preparation, construction, or other performance under this
grant agreement, and, upon approval of the Secretary, shall be incorporated into
this grant agreement. Any modification to the approved plans, specifications, and
schedules shall also be subject to approval of the Secretary, and incorporated into
this grant agreement.
17. Construction Inspection and Approval. It will provide and maintain competent
technical supervision at the construction site throughout the project to assure that
the work conforms to the plans, specifications, and schedules approved by the
Secretary for the project. It shall subject the construction work on any project
contained in an approved project application to inspection and approval by the
Secretary and such work shall be in accordance with regulations and procedures
prescribed by the Secretary. Such regulations and procedures shall require such
cost and progress reporting by the sponsor or sponsors of such project as the
Secretary shall deem necessary.
18. — Planning Projects. In carrying out planning projects:
a. It will execute the project in accordance with the approved program
narrative contained in the project application or with the modifications
similarly approved.
b. It will furnish the Secretary with such periodic reports as required
pertaining to the planning project and planning work activities.
c. It will include in all published material prepared in connection with the
planning project a notice that the material was prepared under a grant
provided by the United States.
d. It will make such material available for examination by the public, and
agrees that no material prepared with funds under this project shall be
subject to copyright in the United States or any other country.
e, It will give the Secretary unrestricted authority to publish, disclose,
distribute, and otherwise use any of the material prepared in connection
with this grant.
f It will grant the Secretary the right to disapprove the sponsor's
employment of specific consultants and their subcontractors to do all or
any part of this project as well as the right to disapprove the proposed
scope and cost of professional services.
g. It will grant the Secretary the right to disapprove the use of the sponsor's
employees to do all or any part of the project.
h. It understands and agrees that the Secretary's approval of this project grant
or the Secretary's approval of any planning material developed as part of
Airport Sponsor Assurances (4/2012) ARP Page 8 of 17
19.
20.
21.
this grant does not constitute or imply any assurance or commitment on
the part of the Secretary to approve any pending or future application for a
Federal airport grant.
Operation and Maintenance.
a. The airport and all facilities which are necessary to serve the aeronautical
users of the airport, other than facilities owned or controlled by the United
States, shall be operated at all times in a safe and serviceable condition
and in accordance with the minimum standards as may be
