prepare a close-out package documenting the project. The close out
documentation shall include field visit summaries, testing results, approval and clearance letters, and
general project information to address FDOT close-out requirements.
20
.
Task B-2: Inspection Services (Lump Sum)
1. Construction Inspector; AVCON shall provide one (1} Construction Inspector to monitor and track
the progress of construction services performed by others. The following tasks describe the typical
project coordination to be provided by AVCON:
General coordination with Okaloosa County project representatives
Participation in Pre-Construction Conference’
On-site monitoring of project progress
Assistance to client as needed
Liaison between Contractor, Engineer, and Client
Coordination and scheduling of material acceptance testing
Inspection of work on-site to verify accordance with contract documents
Notifications of defective work or materials
Review of project schedules
. Participation in weekly construction progress meetings
. Review and inspection of erosion control devices
. Field verifications of work quantities; validation of pay requests
. Participation in substantial completion inspection
PABRARY No
Pre wo
W Mr O*
Page 3 of 4
SCOPE OF SERVICES ~ AVCON, INC,
Construction Phase Services for Eglin Air Force Base ARFF Development
14, Participation in final completion inspection
13. Maintenance of daily project diary, photo logs, and record drawings
16. Maintenance of records to be submitted to County and FAA
17. Other related services as requested by the County
Task shall assume participation by the Construction Inspector of 1,560 labor-hours (39 weeks with an
average of 40 hours per week),
No separate compensation shall be made for pet diem or vehicle allowances unless otherwise authorized by
the COUNTY.
SECTION C; DELIVERABLES
The following deliverables to the County are anticipated:
Task B-1; Construction Adtministration Services
4
e
e
*
6
s
*
e
a
es
*
®
Minutes of Pre-Award Meeting (Task 2)
Lease Boundary Survey and Legal Description (Task 3)
Minutes of Pre-Construction Conference (Task 4)
Monthly Update Reports (3 copies per month for 9 months) (Task 7)
Final Reconciliation Change Order (5 copies) (Task 12)
Owner’s Allowance Work Directive (T ask 13)
Signage Allowance Work Directive (Task 14)
Substantial Completion Punch-List (Task 17)
As-Built Survey (Task 18)
Certification of Project Completion (Task 20)
Record Drawings (hard copy and CD with electronic CAD files) (Task 20)
Close-Qut Documents (hard copy) (Task 20)
SECTION D: ADDITIONAL SERVICES
Additional services may be added to this contract during the course of work based upon agreed Lump Sum
fees. No work shall be undertaken in accordance with any additional service tasks without the written
authorization of the Owner.
END OF SCOPE
Page 4 of 4
a . ssodary yun9,) esaoyeyG
TASK ORDER APPROVAL FORM £10227 AW
OaAONddY
conreact #;_€08 +1683 -AP3 “/52- 5 04
TASK ORDER #: ke TASK ORDER AMOUNT: $ Z, 7 i, 732.
APPROVED
xB
OFFERED BY CONSULTANT:
MAY 1,7 2013
AV CON, ENCE. we.
FIRM'S NAME bd Comity A POTTS
Vikouw ©. Leb.” Léwis, PE.
REPRESENTATIVE’S ea
LEG be
-
SIGNATURE
K EG tirth hn MUL AWAMCER.. Yo fos
TITLE DATE
RECOMMENDED FOR APPROVAL APPROVED BY OKALOOSA COUNTY
(Department Director} (Per Purchasing Manual)
* $25,000 or less approved by Purchasing Director
* Belween $25,001 ane $50,000 approved by
Purchasing Director and County Adrrinistrater
a + In excess of $50,000, aoproved by the Boarc,
SIGNATURE PURCHASING DIRECTOR
Pees “ *
Lokerivw ne eden A Ti)
TITLE DATE
A Lr
DATE a A
AAN {if applica
ee
B
COUNTY ADMINISTRATOR {if applicablé
BCG approval on 4-16-13
BATE DATE
56
TASK ORDER
Eglin Air Force Base ARFF Development
Professional Design, Permitting, and Bidding Phase Services
Eglin Air Force Base, Florida
Task Order No. olor
AVCON Project No. 2012.050.09
AVCON, INC., a Florida Corporation (hereinafter “CONSULTANT”) agrees to perform and
complete the following services (hereinafter “Services”) for Okaloosa County Board of County
Commissioners (hereinafter “CLIENT”), in accordance with the terms and conditions of the
Agreement for Professional Architectural, Engineering, and Aviation Planning Services (Contract
No.; C08-1683-AP3-152), dated September 16, 2008, all of which terms and conditions are
incorporated herein by reference,
1. Task Location: Eglin Air Force Base—Okaloosa County, Florida
2. Task Name: Rglin Air Force Base ARFF Development
3. Task Description/Scope of Services: CONSULTANT shall perform professional design,
permitting, and bidding phase services contained in Exhibit A and attached hereto,
4. Compensation: The total maximum project budget is One-Hundred Ninety-Eight Thousand,
Nine-Gundred Thirty-Five and 00/100 dollats ($198,935.00) as outlined below:
All design, permitting, and bidding phase services performed under Tasks I and II
shall be compensated for on a Lump Sum basis, The Lump Sum fee shall be One-
Hundred Forty-Six Thousand, Three Hundred Twenty-Five and 00/100 dollars
($146,325.00 Lump Sum) and shail include all charges required. to perform the
work specified. Progress payments shall be made monthly and shall be by an
estimate of the percent complete in accordance with the project progress.
All subconsultant services performed under Task ITI shall be compensated on a
Not-To-Exceed (time and materials) basis. The Not-To-Exceed limit for services
performed under Task DI shall be Fifty-Two Thousand, Six-Hundred Ten and
00/100 dollars ($52,610.00 Not-To-Exceed), CONSULTANT shall be
compensated based on actual expenses incurred. Progress payments shall be made
monthly.
5, Schedule: <A schedule of 120 calendar days is anticipated from the date of the project
Notice-To-Proceed (NTP) to prepare a set of 100% design documents for agency
review, For any unreasonable delays beyond the control of AVCON in
obtaining required materials or reviews to be provided by others, the
anticipated design schedule shall be extended an equivalent number of
days, Bidding phase services shall be performed in accordance with the
construction schedules mutually established by the County and AVCON.
Task Order: Egiin Air Force Base ARFF Development Page 1 of 2
6. Deliverables: Deliverables shall include the following:
Task I - Design Documents and Permitting Services
Three (3) 10% Concept Design Layout for Review
Minutes from 10% Concept Design Layout Review Meeting
Three (3) 90% sets of Design Drawings for Review
Minutes from 90% Design Review Meeting
Three (3) Copies of Engineer’s Report
Opinion of Probable Construction Cost
Notes from QA/QC Review of 100% Design Documents
Three (3) copies of 100% Design Documents
Five (5) copies of Release for Bid Documents
CRN AWM PWN
Task II — Bidding and Award.
1. Minutes from Pre-Bid Conference
2. One (1) copy of Bid Tabulation and Recommendation of Award
3, Five (5) sets of Conformed Documents
7, Other Considerations: Services of the CONSULTANT shall be under the direction of Mr.
Tracy Stage, A.A.E, of Okaloosa County Airports,
Accepted by:
CLIENT: CONSULTANT;
Okaloosa County Board of AVCON, INC,
County Commissioners
[file
By: By:
/
Printed Name: Printed Name: __ Virgil C, “Lee” Lewis. P.E.
Title: Title: Regional Manager
Date:
Task Order: Eglin Air Force Base ARFF Development Page 2 of 2
EXHIBIT “A”
SCOPE OF SERVICES - AVCON, INC.
Professional Design, Permitting, and Bidding Phase Services
April 8, 2013
Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
SECTION A: PURPOSE
The purpose of this project is to develop construction drawings, permit the project through Eglin Air Force
Base and the Notthwest Florida Water Management District (NWFWMD), and coordinate bids with potential
contractors for the Rglin Air Force Base ARFF Development, This scope of work details the design,
permitting, and bidding phase services to be performed by AVCON, INC, for this project.
The project tasks identified for this contract generally include the following elements:
¢ Coordination with Okaloosa County Airports staff, Eglin Air Force Base representatives and
permitting agencies throughout the design and construction phases;
° Preparation of design drawings and specifications through 100% for the project limits;
« Design of the project site includes design of utility systems, stormwater management
facilities, pavements, building and related items;
« Preparation of permit applications for Eglin Air Force Base and coordination with the
Northwest Florida Water Management District; and
« Assistance to the Owner during the bidding phase
This design shall generally include an approximately 8,000 sf Airport Rescue and Fire Fighting (ARFF) on a
4,5 acre parcel on Eglin Air Force Base including up to three truck bays with associated truck drive-through
pavements, vehicular parking lot, utility design and stormwater management facilities, This design shall be in
compliance with FAA AC 150/5210-15A, ARFF Station Building Design.
SECTION B: DESCRIPTION OF TASKS
The following elements describe the individual services to be provided as part of this work effort.
Task I: Design Documents and Permitting Services (Lump Sum)
1. Coordinate with Okaloosa County Airports Department: AVCON shall coordinate with Okaloosa
County Airports to develop design objectives and ensure that the design is in accordance with airport
goals.
2. Kick-Off Meeting and Site Review: AVCON shall participate in a kick-off meeting with the County
to review the project approach, future tenant coordination requirements, agency coordination
requirements, and details of the project, AVCON shall review the site to observe existing conditions
and document observed features impacting the improvements.
3. Coordinate with Eglin Air Force Base Planning and Programming Department: AVCON shall
coordinate with Eglin Air Force Base Planning and Programtning Department to ensure that the design
is in accordance with Eglin Air Force Base design standards.
Page f of 7
SCOPE OF SERVICES — AVCON, INC.
Eglin Air Force Base ARFF Development
4,
10.
1.
12
43
*
14.
Coordinate Building Design with Architect: AVCON shall coordinate the project schedule,
building layout requirements, owner comments, and submittals with the architect. This task includes
review of interfaces between the architectural drawings and the MEPF systems to ensure building
continuity. This task shall assume two hours of coordination per week.
Coordinate with Eglin Air Force Base Fire Department: AVCON shall coordinate with Hglin Air
Force Base Fire Department to define key design objectives for the building and site layout and ensure
that the design meets the fire departments operational needs,
Coordinate Site and Topographical Survey: AVCON shall coordinate a site survey with a qualified
sub-consultant. The topographic and project limit surveys shall include topographic information,
utilities, project limits, and other associated information.
Coordinate with Geotechnical Engineer; AVCON shall coordinate with geotechnical engineering
subconsultant to facilitate geotechnical testing, AVCON shall review and shall be responsible for the
deliverables of the subconsultant as they pertain to the completion of the design work, Geotechnical
tests shall be performed to analyze soil conditions and other site characteristics required for the design
of the building structure, parking lot pavements, and stormwater infrastructure.
Attend Northwest Florida Water Management District (NWEWMD) Pre-Application Meeting:
AVCON shall meet with the NWFWMD to review the proposed project and the specific
Environmental Resource Permit (ERP) Requirements.
Coordinate with Eglin Air Force Base Water and Sewer Department: AVCON shall coordinate
with Eglin Air Force Base Water and Sewer Departments to obtain information regarding the location
and size of existing water and sewer lines to serve the proposed