Mr. Tracy Stage, A.A.E,
Deputy Airports Director
Okaloosa County Airports
1701 State Road 85 North
Eglin Air Force Base, FL 32542
Reference: Tabulation of Bids and Recommendation of Award
Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
Dear Mr. Stage:
On Thursday, July 25, 2013 at 3:00 p.m. local time, bids were received at the Okaloosa County office at 302 N.
Wilson Street in Crestview for the Eglin Air Force Base ARFF Development project at Eglin Air Force Base.
A total of seven bids were received and a tabulation of the bids is enclosed herein as Attachment A for your
reference. The total bid amounts are summarized as follows:
Bidder Total Bid
1. Birkshire Johnstone, LLC $2,616,793.60
2. Speegle Construction, Inc. $2,712,852.70
3. Cathey Construction and Development, LLC $2,729, 127.71
4. Lord and Son Construction, Inc. $2,744,542.63
5. The Green-Simmons Company, Inc. $2,822,566.93
6. Ram Construction and Development, LLC $2,866,994.00
7. Design/Build Systems, Inc. $3,412,074.69
As stated in Item 10, Page BF-Page 4 of 6, “the Basis of Award shall be the Total Bid Amount, price and other
factors considered.” Based on our review of the submittals by the seven bidders, Birkshire Johnstone, LLC
appears to be a responsible contractor with the lowest Total Bid Amount. We have reviewed the scope of work
and DBE goals with Birkshire Johnstone and have confirmed their understanding of the project.
The Total Bid Amount by Birkshire Johnstone is approximately 11.3% higher than the Engineer’s Estimate
($2,350,353.50). Factors contributing to this variation may include additional efforts related to controlled
access to the project site (personnel, deliveries, badging, etc.), compared to standard construction costs. In
addition, integration of the Westnet mass notification system may require extended efforts to install and verify
functionality. The difference between the Total Bid Amount for the apparent low bidder (Birkshire Johnstone)
and the sixth lowest bidder (Ram Construction and Development, LLC) is only 9.6%; therefore, the bids
received appear to validate that the low bid is a reasonable cost for this project.
CIVIL & STRUCTURAL ENGINEERING @ AIRPORT & AVIATION CONSULTING MH TRANSPORTATION DESIGN & PLANNING
Mr. Tracy Stage, A.A.E.
July 25, 2013
Page 2 of 2
A review of the bid proposal submitted by Birkshire Johnstone, LLC identified two discrepancies between the
multiplication of the unit prices and the quantities. For example, the Total Amount for Bid Item No. 10 was
provided as “$6,278.00”; however, the product of the unit price and the quantity is $6,044.40 and a similar
discrepancy appears in Item No. 11. As stated in Section 17.1, Instruction to Contractors of the Bidding
Documents, discrepancies between the multiplication of units of Work and unit prices will be resolved in favor
of the unit prices. These corrections have been depicted on the attached Bid Tabulation.
Several of the remaining contractor’s bids included minor discrepancies which appear to have no direct bearing
on our recommendation of award provided herein, but may require County legal review in the event that the
project is ultimately awarded to a firm other than Birkshire Johnstone who provided the apparent low bid.
The Disadvantaged Business Enterprise Program form (OC-10) submitted by Birkshire Johnstone includes
subcontractors for fire protection, acoustical ceilings, electrical, flooring, and sitework but does not include
estimated amounts for each subcontractor or a total estimated DBE participation percentage. We reviewed the
DBE requirements of the bidding documents with Birkshire Johnstone and they confirmed that the 4.03% DBE
participation requirement is reasonable and will be achieved for this project.
Notwithstanding the County’s final review of the complete project documents and legal review of bid forms,
we recommend award of the Eglin Air Force Base ARFF Development contract to Birkshire Johnstone, LLC at
the bid amount of $2,616,793.60, subject to available funding and concurrence by FAA. ,
We stand ready to assist the Airport in the implementation of this project based on your determination of the
desirability of the award at this time. Should you have any questions or require additional information, please
do not hesitate to contact us at your convenience.
Sincerely,
AVCON, INC.
Jobn Collins, P.E.
Project Manager
Enclosures as list below:
1. Attachment A—Bid Tabulation
ATTACHMENT A
BID TABULATION
Eglin Air Force Base ARFF Development
Eglin Air Force Baae, Florida
BID OPENING: Juty 25, 2013 AT 3:00 PM
" CATHEY CONSTRUCTION AND
ENGINEER'S ESTIMATE BIRKSHIRE JOHNSTONE, LLC | SPEEGLE CONSTRUCTION, INC, DEVELOPMENT LLG
TEM : 7 EXTENDED EXTENDED EXTENDED EXTENDED
Lon meer | BID ITEM | ITEM DESCRIPTION [unit] quanriry UNIT PRICE i TOTAL UNIT PRICE l TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
105-1 MOBILIZATION ANO MAINTENANCE OF TRAFFIC rs 7 25,000.00 75,000.00, 2619000 [$ 26,190, 7155318 | 71,593.18 ai 5015F 41,307.57
P151- STRIPPING AND STOCKPILING sy | i0,900 1,00 10,800.00 0.58 086.00 92 70,028.00 33 28,397.00
-182- Sta 4 20,000.00 20,000.00 18,000.00 15,000.00 22,011.92 22,511.92 44,043.84 44,943.84
-152- sy | 3600 R 7.10, 960.00 Ts 85 340.00 Td
P-166- LB 1 7,000.00 2,700,00 700,00. 2,441.18 44118
P-209- SY | 7300 14.00 13.20, 17,460.00 68 78,058.00
vv 100 15.00 16:95 [3 18,045.00 21.52 23,672.00,
Y 250 190.00 84.00 [$105,000.00] $” 73.44 91,800.00
Y 700 3.00 3.641 $° 26,028.00 62, 20,174.00
RCP, CLASS Hil F 207 40.00 29.20 __ 6,044.40 36.91 054.37
ia" RCP, CLASS V F 32 60.00 40.50 .206.00 | | 33,26] § > 1,064.32
TYPE F DITCH BOTTOM INLET A a 3,400.00 2,922.00 968.00 7,508.23 2 1.
fa" MES A 2 1,500.00 570.00 020.00 1,062.12 124,24
SUPERPAVE ASPHALTIC CONCRETE ON 200 730.00 112.00 22,400.00 [ 143.71 28,742.00
(CONCRETE SPILLWAY is t $5,000.00 1,844,00 | § BA400[§ 2840.24 548,24
CONCRETE "F” GURS iF 450 20.00 15.10. ¢ 795.00 | § 19.53 788,50
(CONCRETE DUMPSTER PAD, ENCLOSURE, AND APRON | 15 13,000.00 12,800.00 72,600.00 73,016.60 13,016.80
CONCRETE SIDEWALK SY 240, 40.06 42,50 10,200.00 | 3 35.37 488,80
ECTABLE WARNING SURFACE EA 406,00 700.00 $80.00 256.80 593.80,
20 ”AP (RUBBLE) (18° DEPTH) 7 100.00 56.00 §,850.00 82.75 4,392.50
24 VEHICULAR SIGNAGE ; 7 "500.00 670.00 670.00 604.20 604,20
222 VEHICULAR PAVEMENT MARINGS 4,000,00 479.00 479.00 [$1,335.60 7335.60 |
2 POTABLE WATER IMPROVEMENTS 35,000.00 33,000.00 | $ 33,000.00 1 § 29,015.38 29,015.36 | 3
24 02730-1 SANITARY SEWER IMPROVEMENTS 75,000.00 5,000.00 000,00 6,552.92 6,552.92
2 | -SS4 SEPTIC SYSTEM, COMPLETE 40,000.00 49,700.00 49,700,00 15,746.30 1,746.30 44,293.77
26 WHA WHEEL STOP 55,00 39.19 a7a70 71.78 502,46 87,42
Ad SD. 1 WAY 4" PVG SPLIT DUCT CONCRETE ENCASED F 5 20.00 E 44.10 S307. 501 § 25,44 7,885.50 | § 374
26 AL- SIGNAGE ALLOWANCE i T 20,000.00 1s _ 20,000.00 20,000.00 [$” 20,000.00 20,000.00 | $20,000.00
2a AC UTILITY ALLOWANCE L 1 40,000.00 S___- 10,000.00 $10,000.00 | $ ~ 10,060.00 10,000.00 ['$~_ 70,000.00,
30 ALS TRANSFORMER ALLOWANCE Al t 50,600.00 50,000.60 [3 I 50, 50,000.00 |'$" 50,000.00
31 ALS OWNERS ALLOWANCE ii i 0,600.00 50,000.00 50,000.00 50,000.00 $50,000.00 50,000.00
32 ARFE-T” JARFF BUILDING, COMPLETE U 1 7,548,000.00 7,546,000.00 | | 2,180,000.00 [$_2,180,000.00 | $ 2.133,881.0 2,133, 887,80
Total Bid Amount: 2,136,605.00 ———"s ~ 2,712,852.70 2,720,1a7.71
$ 2,350,363.50 (Sea Note 1)
4 Enginears Opinion of Cc Coal a 10%
Recommended budgel was $2,350,353.50
ote CaCl.
J -25-13 .
ATTACHMENT A
BID TABULATION
Eglin Aly Forco Basa AREF Development
Eglin Air Farce Basa, Florida
BID OPENING: Juty 25, 2043 AT 3:00 PM
TORD AND SON CONSTRUCTION, THE GREEN-SIMMONS RAM GONSTUCTION AND
INC, COMPANY, INC. DEVELOPMENT. DESIGN/BUILD SYSTEMS, INC
| TTEM ; EXTENDED EXTENDED EXTENDED ’ EXTENDED
ial BID HEM ITEM DESCRIPTION [use] QUANTITY UNIT PRICE TOTAL UNIT PRICE [ TOTAL UNIT PRICE TOTAL UNIT PRICE | TOTAL
' .
Ford O MAINTENANGE OF TRAFFIC 5 i 5. 204, ii. 18 204,737.13 19,591.00 | $ 19,597.00 16,000,00 8,000.00 19,200.00 75.200.06
P-151- STOCKPILING SY |" 10,900 $ 815.00 | § 0.401 § 1,199.00 1.00 (0,900.00 120 13,060.00
F152. D EMBANKMENT. Ls 1 40, m an 40,000.00 59,629.00 59,829.00 77,000.00 7,000.00 | $20,400.00 20,400,00
P-152. "ARATION sy | 3.600 $ 840.00 1.40 5,040.00 3.00 0,800.00 60 12,960.00
P-156- us i ima fa 800.00 4,756.00 4,758.00 3,000.00 5,000.00 6,609.00 6,000.00
P-209-1 |GRUSHED AGGREGATE BASE COURSE, 6" sy | __7,300 15.00 70,500.00 21.33 27,729.00 20.76 28,976.00 24.90 32,370.00
P2111 |LIMEROCK BASE COURSE, 8” 100 13.10 14,410.00 27.54 30,294,00 19.48 21,098.00 23.02 |§ 25,322,00
P-501-1 [PCC PAVEMENT, 10" 250 95 80 719,750.00 112.24 140,300.00 92.00 118,000.00 127.20 759,000.00
T-904-1 SODDING, SAHIA ARGENTINA 700, 350 76,950.00 3.36 25,872.00 50) 26,950.00 42013 9.00 |
iI D-701- "RCP, CLASS Ill 207 3450 7,141.50 30.38 10,428.66 32.00 624,00 33.92
1 0-701. y RCP, CLASS V 32 36.00 7,216.00 55.97 .7a1.04 40.50 296.00 48.60
1 D-751-1__ [TYPE F DITCH BOTTOM INLET ° q 2,500.00 7,500,00 2,407.00 224.00 3,000.00 = 9,060.00 3600.00 | $
D7: MES 2 700.00 400.00 7,063.50 4127.00 1,200.00 400.00 F § . 1,440.00] § 880,00
334. SUPERPAVE ASPHALTIC CONCRETE 200 124.00 24,800.00 100.15 21,830.00 720,00 24,000.00 26,800.00
520- CONCRETE SPILLWAY 1 2300.00 300.00 4,422.00 422,00 5,500.00 600.00 800,00
520- CONCRETE "F” CURB 450 18.00 3,400.00 18.47 311.50 15.50 975.00 .370.00
520. CONCRETE DUMPSTER PAD, ENCLOSURE, AND APRON 5,963.00 983.00 11,323.00 | § 14,322.00 7,500.00 600,00 036.00
522-1. _ {CONCRETE SIDEWALK 340 36.00 ,640.00 46.92 17,260.80 34.00 920.00 604.00
527- DETECTABLE WARNING SURFACE 280.00 $60.00 313.50 27.00 350.00 700.00 840.00
20 530- [RIPRAP (RUBBLE) (18° DEPTH) 7 95.00 650,00 100.76 7,053.20 90.00 6,300.00 7,560 00
P24 700- VEHICULAR SIGNAGE 00,00 500.00 638.00 638.00 370.00 370.00 660.00
22 5 AR PAVEMENT MARINGS Li 700.00 700.00 {$1,405.00 7,405.00 500.00 500.00 | 5 242.00
23 LE WATER IMPROVEMENTS 30,000.00 30,000.00 $28,305.00 38,305.00 44,455.00 44,455.00 33,640.00
18,000.00 79,000.00 | $28,305.00 28,305.00 79,530.00 13,830.00 21,432.00
12,000.00 72,000.00 17,080.00 14,060.00 45,000.00 45,000.00 15,000.00
E 420.00 76.14] § 532.06 68.00 476,00 414,05
3 F 7 97760,00 | § 85.53 6444.75 47.00 3,525.00 ['s 3,980.00
A AU 20,000,007 $20,000.00 20,000,00[ $ 20,000.00 20,000.60 | : 20,000.00
AL: AL 40,000.00 [$ 16,000.00 76,000.00 [$10,000.00 10,000.00 70,000.00
30 AL TRANSFORMER a OWANCE Al Ey 000.00 a0 60,000.00 50,000.00 | $ $0,000.00 5 80,000.00
a AL OWNERS ALLOWANCE Al 000.00 1S ~~ -s0,000.00 60,000.06 | $0,000.00 | § 3 80,000.00
3 ARFE-T_JARFF BUILDING, COMPLETE t 5 2027, CA 100; a 3,214,900,00 2,214,900.00 | $ 2,300,000.00 2,500,000.00 | '$2,794,088.00 2,764,888.00
Total Bid Amount: 2,744 642.63 2,822,560.93 2,866,994,00 3,412,074.59
a 10%
1 Engineer's Opinton af Ci
Recommended budget was $2,350. pny 50.
TASK ORDER APPROVAL FORM
CONTRACT #: CO8-1683-AP3
TASK ORDER #:
TASK ORDER AMOUNT: $230,633.00
OFFERED BY CONSULTANT:
AVCON INC,
FIRM’S NAME
Virgil C. "Lee" Lewis, P.E.
REPRESENTATIVE'S PRINTEEYNAME
t
Zt
SIGNATURE WA
Regional Manager
July 22, 2013
TITLE
RECOMMENDED FOR APPROVAL
(Department Director)
SIGNATURE
TITLE
DATE
COUNTY ADMINISTRATOR (if applicable)
DATE
DATE
APPROVED BY OKALOOSA COUNTY
(Per Purchasing Manual)
* $25,000 or less approved by Purchasing
Director
« Between $25,001 and $50,000 approved by
Purchasing Director and County
Administrator
« In excess of $50,000 approved by the Board,
PURCHASING DIRECTOR
DATE
CHAIRMAN (if applicable)
DATE
TASK ORDER
Professional Construction Phase Services
July 22, 2013
Construction Phase Services for Eglin Air Force Base ARFF Development
Eglin Air Force Base, Florida
Task Order No.
AVCON Project No, 2013.050.04
AVCON, INC., a Florida Corporation (hereinafter “CONSULTANT”) agrees to perform and
complete the following services (hereinafter “Services”) for Okaloosa