READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 09-08-2009 regular — reading text
Part 7 of 29. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-24079-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
roadways,
waterways, recreational facilities, and natural amenities were all heavily impacted.
Hurricane Ivan has made it both easy and difficult for this plan to identify means of
mitigation against future hurricane impacts. Much of what would have been included
2009 LMS Update for BCC Page 4 of 14
18-
in this plan has been previously documented in many ways because of past
hurricane strikes. However, no hurricane has created such a massive impact to the
area since 1928. In 1928, County had little coastal development.
Okaloosa
Hurricane Erin ( 1995) demonstrated the County's vulnerability to winds reaching near
100 MPH ( with particular emphasis on loss of energy, road blockage, and debris
impact). Hurricane Opal ( 1995) demonstrated coastal vulnerability due to a massive
storm surge. Hurricane Ivan took both of the demonstrations of Erin and Opal and
combined these problems into a single, large -scale event.
For the purposes of this section of the LMS Plan, Hurricane Ivan provides a recent
insight to what hurricanes, can do to the area. Prior to Hurricane Ivan, the LMS
Committee would have developed an analysis of impact and potential mitigation
actions mostly based upon knowledge obtained from Hurricanes Erin and Opal of
1995, and to a lesser extent earlier storms that had occurred during the past one
hundred years. This plan now has a vivid reminder of how both inland and coastal
communities are truly vulnerable to major hurricanes ( Category 3 -5).
The following are the primary methods of mitigation that could reduce the impacts of
hurricane impacts to Okaloosa County and its municipalities and are supported by
the LMS Steering Committee:
Building Construction and Flooding —Ensure all future buildings are
constructed to Florida Building Code standards and are built above the
established base flood elevations, or BFE' s, whether for zones
impacted by moving water ( velocity or N" zones or floodways on Flood
Insurance Rate Maps or FIRMS) or by rising water ( such as " A" and " B"
zones on FIRMS).
Flood Mapping — Ensure that maps accurately reflect the amount of
surge, wave and flood action that can occur during a major hurricane.
Flood Category Mapping — Ensure that various types of flooding
documented by a variety of sources ( storm surge due to being wind
driven, fetches within bays and sounds, riverine flooding, and low
area/ basin flooding) are all documented and that the public are aware
of the existence of such mapping services and products for planning
purposes.
Coastal Bridge and Highway Construction — Ensure roads are
designed and engineered for the amount of wind, surge, flooding and
debris that can be expected.
Building Construction and Wind — Ensure that all new buildings and
permitted rehabilitations /additions are secure in terms of wind
resistance and shuttering per mandates of the Florida Building Code.
Existing Building Mitigation in Flood -Prone Locations — Provide
opportunities for property owners to elevate existing structures, move
them to higher ground, or to have properties purchased by local
governments in order to reduce overall community vulnerability to surge
and flooding.
Availability of Public Sheltering — Ensure adequate and safe public
shelters are available in all locations in the County to prevent or reduce
2009 LMS Update for BCC Page 5 of 14
fig_
post -disaster homelessness, including adequate electrical supplies for
cooking and to maintain sanitary conditions.
Structural Soundness of Existing Local Government Centers —
Promote and support funding that allows for buildings to remain
functional before, during and after a hurricane event in order to support
the function of Okaloosa County Emergency Management's mandates
under Chapter 252 Florida Statutes. This includes support of the
formation of municipal emergency operations centers and protection of
both municipal and county infrastructure named in the County's or a
municipalComprehensive Emergency Management Plan and its
Emergency Support Functions ( including first response entities and
their supporting buildings).
Communications - Ensure mitigation activities are wind and electrical -
failure resistant to allow for 24/7 communications during the first 72
hours following a disaster. Communications can include radio,
television, telephone, Internet, and all other means of communications
systems.
Heavy Equipment — Ensure adequate equipment exists to remove
debris, clear roads, perform search and rescue functions, and otherwise
respond and recover from hurricane impacts.
Public: Agency Purchase of Undeveloped High Risk Flood /Surge
Areas — Promote the continued purchase of lands that are at high risk
of flooding, with proper considerations of private property rights and
constitutional requirements for just compensation, as appropriate.
Public, Awareness — Promote public awareness of hurricane hazards
and ways that private structure owners and landowners can mitigate
using governmental or private sector investment.
Additionally, ensure
that the business community is aware of the consequences of not
mitigating businesses for hurricane impacts.
Flooding
As identified in Section 4, flooding can be experienced during abnormally high
rainstorm events as well as during hurricanes and tropical storm. Concentration to
identify and analyze methods of mitigation for flooding will be similar to
recommendations that address flooding in Section 6. 3.A., however this section also
attempts to identify other areas that are specific to riverine, isolated basins, and dam
safety.
The following are the primary methods of mitigation that could reduce the impacts of
flooding impacts to Okaloosa County and its municipalities and are supported by the
LMS Steering Committee:
Building Construction and Flooding —Ensure all future buildings are
constructed to Florida Building Code standards and are built above the
established base flood elevations, or BFE' s, whether for zones
impacted by moving water ( velocity or N" zones or floodways on Flood
Insurance Rate Maps or FIRMS) or by rising water ( such as " A" and " B"
zones on FIRMS).
2009 LMS Update for BCC Page 6 of 14
20-
Flood Mapping — Ensure that maps accurately reflect the amount of
surge, wave and flood action that can occur during a major hurricane.
Flood Category Mapping — Ensure that various types of flooding
documented by a variety of sources ( storm surge due to being wind
driven, fetches within bays and sounds, riverine flooding, and low
area/ basin flooding) are all documented and that the public are aware
of the existence of such mapping services and products for planning
purposes.
Bridge and Highway Construction — Ensure roads are designed and
engineered for the amount of wind, surge, flooding and debris that can
be expected.
Existing Building Mitigation in Flood -Prone Locations — Provide
opportunities for property owners to elevate existing structures, move
them to higher ground, or to have properties purchased by local
governments in order to reduce overall community vulnerability to surge
and flooding.
Critical Public Buildings Away From Floodplains and Flood -Prone
Areas — Ensure that all public buildings that serve first response and
critical emergency /public needs, including record /data collection and
communication centers /infrastructure, are located outside of flood
zones or flood -prone areas.
NFIP and Community Rating System — Support efforts to gain
approval and /or to maintain status as CRS communities in all
municipalities and the County.
Land Development Code — Include design standards that require
detention and retention of stormwater runoff during critical design -hour
storm events.
Agricultural Flood Damage Prevention — Support efforts of the
Institute of Food and Agricultural Services ( IFAS /County Cooperative
Extension Service) and the Natural Resources Conservation Services
NRCS) as it relates to reduction and mitigation of flood hazards to
crops and silvicultural operations.
Dam Safety — Support efforts that document hazards and risks
associated with structural and earthen dams and upkeep. Support
efforts that create partnerships with property owners that promote the
overall goal of community -wide and stream valley safety.
Land Erosion
As identified in Section 4, land erosion can occur quickly, particularly during rainstorm
events such as hurricanes and tropical storms, and it can occur almost imperceptibly
over longer periods of time during typical weather conditions. Once in motion, land
erosion can be difficult to control. Both vegetative cover and structural controls are
necessary to gain control of erosion. Even where no development is present, natural
forces can erode vegetation and land away where high amounts of energy ( i. e.
waves and water) are present.
2009 LMS Update for BCC Page 7 of 14
21-
Since Hurricane Ivan, coastal erosion has emerged as a serious concern for coastal
areas.
This not only includes properties directly on the Gulf of Mexico, but also those
on bays and sound.3 ( due to high water and surge).
Additionally, soil erosion due to runoff, construction, agricultural /silvicultural
operations, and along roadways slowly but surely creates sedimentation problems,
