READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 09-08-2009 regular — reading text
Part 6 of 29. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-24079-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
July 21, 2009
Re: Local Mitigation Strategy Update
Background
Okaloosa County is threatened by a number of different types of natural hazards
that endanger the health and safety of the population of the county, jeopardize its
economic vitality, and imperil the quality of its environment. In compliance with the
Robert T. Stafford Disaster Relief Act ( 42 USC 5121 -5207) and the Disaster
Mitigation Act of 2000 ( 44 CFR 201) and in order to proactively address natural
disasters, Okaloosa County and its
municipalities have jointly adopted a Local
Mitigation Plan and Local Mitigation Strategy. The Local Mitigation Strategy and
Plan were developed by the county /municipalities' Comprehensive Plan Committee
created in 1990 which also serves as the Local Mitigation Strategy ( LMS)
Committee. The LMS committee meets regularly and is open to the public.
Through the LMS committee the private sector contributed substantially to the
development of the Local Mitigation Plan and Local Mitigation Strategy.
The Board adopted the Local Mitigation Strategy by Ordinance No. 99 -27 which
was amended by Ordinance No. 05 -39. This amendment was to update the LMS
for compliance with the Disaster Mitigation Act of 2000 ( DMA2K) as outlined in
44CFR, Part 201. Ordinance 06 -61 signed July 5, 2006 represents the final version
of the LMS which completes the update and meets the requirements of DMA2K.
For credit under the Community Rating System, this memo must be distributed to
the media and be made available to the public. It is being sent to the Northwest
Florida Daily News. Copies of this report and the of the LMS plan update are
available for review at the Okaloosa County Water & Sewer Administrative
2nd
Complex, 1804 Lewis Turner Boulevard, Floor, Okaloosa County Department of
Growth Management, Fort Walton Beach, Florida, or Okaloosa County Department
of Growth Management, 812 James Lee Blvd., Crestview, Florida.
2009 LMS Update for BCC Page 1 of 14
15-
LMS Plan Action Items
The Okaloosa County LMS Plan contains the compilation of the proposed mitigation
initiatives that are the result of -the earlier planning efforts by the LMS Committee.
This compilation serves to fulfill the requirements of 44 CFR Parts 201 and 206
Interim Final Rule in accordance with the Disaster Mitigation Act of 2000 ( DMA2K).
The compilation is provided in three sub -sections to directly address the four criteria
listed in § 201. 6( c)( 3):
1) Local Hazard Mitigation Goals: As directed in § 201. 6( c)( 3)( i), this
subsection shall include... " a description of mitigation goals to reduce or
avoid long -term vulnerabilities to the identified hazards."
2) Identification and Analysis of Mitigation Actions: As directed in
201. 6( c)( 3)( ii), this subsection shall..." identify and analyze a
comprehE.,nsive range of specific mitigation actions and projects being
considered to reduce the effects of each hazard, with particular emphasis
on new and existing building and infrastructure."
3) Implementation of Mitigation Actions and Multi- jurisdictional
Mitigation Actions: As directed in § 201. 6( c)( 3)( iii), this subsection shall..."
include an action plan describing how the actions identified in section
c)( 3)( ii) will be prioritized, implemented, and administered by the local
jurisdiction. Prioritization shall include a special emphasis on the extent to
which benefits are maximized according to a cost benefit review of the
proposed projects their
and associated costs." As directed in
201. 6( c)( 3)( iv) and pertaining to the multi -jurisdictional aspects of this plan
i. e. the inclusion of the County and its municipalities), this subsection
shall... " include identifiable action items specific to the jurisdiction
requesting FEMA approval or credit of the plan."
LMS Plan Goals
The LMS Plan includes the following goals that provide the broad range vision of
what is to be accomplished during the five -year planning period from 2005 through
2010 by the LMS Steering Committee:
Goal 1 — Continually provide mechanisms for local government jurisdictions
and the public: to accomplish mitigation activities in Okaloosa County.
Accomplish by:
Maintain bylaws that define membership and public participation
methods.
Holding regularly scheduled LMS Steering Committee and Working
Committee meetings. Steering Committee meetings will be held
quarterly at minimum.
Forming Working Groups for sub -regions, municipalities, or for specific
hazards named in the plan to reduce or eliminate vulnerability.
2009 LMS Update for BCC Page 2 of 14
16-
Maintaining a staffing presence to the LMS Steering Committee through
contract or through staff hire or appointment.
Providing communications to county and municipal contacts and
through media outlets to advertise opportunities to attend and
participate in mitigation functions, consistent with the Florida Sunshine
Law.
Holding meetings throughout the County and in various municipalities to
encourage local participation.
Goal 2 —Maintain communication between the LMS Steering Committee and
key County and Municipal departments to coordinate intra- and inter-
departmental mitigation activities among various jurisdictions, and with the
public.
Accomplish by:
Ensuring all interests of various departments are represented by the
appointed staff to the Steering Committee
Ensuring all interests are aware of Working Groups and a need to
represent their own interests concerning various geographical areas or
to address various hazards.
Maintaining up -to -date e -mail and postal addresses and phone
numbers to ensure communication.
Establishing a website on the County' s web server that discusses the
LMS program.
Goal 3 — Update the LMS plan, as necessary, to identify change to hazards,
vulnerability, goals, initiatives /priorities
accomplishments /withdrawal /additions /pending, update of funding sources,
current disaster declarations, and adoption of revisions.
Accomplish by:
Having the Steering Committee direct staff to update plan sections,
tables, maps, etc., based upon current activities, trends, or issues.
Providing LMS staff feedback that provides localized information that is
current.
Continually reviewing the comparing it to other planning
plan and
requirements ( emergency management plans, comprehensive land use
plans, community rating system plans) that contain mitigation provisions
or may otherwise help to assert or hinder mitigation initiatives.
Notifying staff to the committee regarding issues that arise that may
need their consideration or to solicit opinion.
Identifying and documenting potentially new hazards, including
technological and homeland security issues not otherwise analyzed as
a result of DMA2K.
Goal 4 —Assist property owners, residents, businesses, non -profits and others
in understanding and knowing of their eligibility for grants, loans and services
that may help to mitigate hazards that directly affect their interests,.
2009 LMS Update for BCC Page 3 of 14
17-
Accomplish by:
Working with existing programs within the County and Municipalities
building inspections, local Community Rating System /National Flood
Insurance Program, emergency management, chambers of commerce,
etc.) to connect mitigation to these efforts.
Being perceptive of and proactively engage new opportunities to
promote mitigation interests.
Developing a website that conveys updated information about
mitigation activities on a continual basis.
Staying abreast of available funding and service opportunities through
participation in meetings, conferences, seminars, and research.
Maintaining initiatives /priorities and contact persons lists to facilitate
rapid notification of assistance availability.
Goal 5 — Reduce or eliminate hazards identified to at risk locations in the
County and its municipalities.
Accomplish by:
Targeting mitigation efforts and activities towards areas where hazards
exist.
Working with agencies, professionals, and the public to develop the
best solutions for identified hazards.
Examining and implementing appropriate technologies to identify,
model, or otherwise simulate risks and zones of risk and incorporating
these Tinto the LMS iplan.
Analysis of Mitigation Actions
Each of the hazards identified hats various ways and methods of mitigation. Section
4 of the plan demonstrates that a wide variety of hazards and risks exist throughout
the County and in its municipalities. Section 5 provides an analysis of the potential
for damages to community -wide infrastructure ( including public and private sector
interests). Section 6 of the Local Mitigation Strategy Plan discusses the types of
known mitigating actions that can be taken to reduce or eliminate future losses
throughout Okaloosa County. The mitigation actions suggested here are not
exclusive, but instead should be viewed as a means of stimulating thought and
creativity towards creating a more disaster -resistant community.
Hurricane/Tropical Storm
The current LMS planning process was initiated prior to the landfall and subsequent
impact of Hurricane Ivan on September 15 -16, 2004. Okaloosa County was all
severely impacted by this Category 3 hurricane. All aspects of Okaloosa County
were impacted. Homes, businesses, governmental buildings, schools,
