READ ALONGSIDE THE SOURCE
Fort Walton Beach Council agenda — 05-08-2007 regular agenda — reading text
Part 41 of 47. These parts divide the reading text for browsing; they are not the source document's page numbers.
Machine-extracted text — fwb-13449-original.pdf
Machine-extracted OCR text · Review label: Machine produced / unreviewed
Compare this copy with the preserved source. Review labels describe the recorded status of this file; they do not guarantee that the text is error-free. Spacing and line breaks are retained, with long lines wrapped to fit the screen.
for any costs incurred by
the proposer in connection with such interviews/ presentations ( i.e., travel,
accommodations, etc.).
Purchasing Department Page: 5
Engineering! Consulting Services, Stonnwater Utility Study Request for Proposa 1 07 -113
5.3 Request for Modification:
The City reserves the right to request that the proposer modify his proposal to more fully
meet the needs of the City.
5.4 Request for Additional Infonnation:
The proposer shall furnish such additional infonnation as the City of Fort Walton Beach
may reasonably require. The City reserves the right to make investigations
of the
qualifications of the proposer as it deems appropriate.
5. 5 Acceptance/ Reiection/Modification to Proposals:
The City reserves the right to negotiate modifications to proposals that it deems
acceptable, reject any and all proposals, and to waive minor irregularities in the
procedures.
5. 6 Proposals Binding:
All proposals submitted shall be binding for ninety (90) calendar days following opening.
5. 7 Alternate Proposals:
5. 7. 1 An alternate proposal is viewed by the City as a proposal describing an approach to
accomplishing the requirements of the Request for Proposals which differs from the
approach set forth in the solicitation.
5. 7.2 An alternate proposal may also be a second proposal submitted by the same proposer
which differs in some degree from its basic or prime proposal.
5. 7. 3 Alternate proposals may address the technical approach, or other provision or
requirements set forth in the solicitation.
5. 7.4 The City will, during the initial evaluation process, consider all alternate proposals
submitted.
5. 8 Addendum and Amendment to Request for Proposals:
If it becomes necessary to revise or amend any part of this Request for Proposal, the
Director of Purchasing will furnish the revision by written Addendum to all prospective
proposers who received an original Request for Proposals.
5. 9 Economv of Preparation:
Purchasing Department Page: 6
Engineering / Consulting Services, Stonnwater Utility Study Request for Proposa 1 07 -113
Proposals should be prepared simply and economically, providing a straightforward,
concise description of the proposer' s ability to fulfill the requirements of the Request for
Proposal and should not exceed 100 pages in length. Copies of plans, specifications or
other engineering reports shall not be accepted.
5. 10 Proprietary Information:
5. 10.1 In accordance with Chapter 119 ofthe Florida Statutes ( Public Records Law), and
except as may be provided by other applicable State and Federal Law, all proposers
should be aware that Request for Proposals and the responses thereto are in the public
domain. However, the proposers are requested to identify specifically any
information contained in their proposals which they consider confidential and/ or
proprietary and which they believe to be exempt from disclosure, citing specifically
the applicable exempting law.
5. 10.2 All proposals received from proposers in response to this Request for Proposal will
become the property of the City ofF art Walton Beach and will not be returned to the
proposers. In the event of contract award, all documentation produced
as part ofthe
contract will become the exclusive property of the City.
5. 11 Proposer' s Certification:
By submitting a proposal, the proposer certifies that he has fully read and understands the
proposal method and has full knowledge ofthe scope, nature, and quality of work to be
performed.
6. INFORMATION REQUIRED OF PROPOSER:
In order to insure a uniform review process and to obtain the maximum degree of comparability,
it is required that proposals be organized in the manner specified.
6. 1 Title Page:
Show the name of proposer' s agency/ firm, address, telephone number, name of contact
Services,
person, date and the subject: Request for Proposals - Engineering / Consulting
Stormwater Utility Study, RFP 07- 113.
6.2 Table of Contents:
Include a clear identification of the material by section and by page number.
Purchasing Department Page: 7
Engineering / Consulting Services, Stonnwater Utility Study Request for Proposal 07- 113
6. 3 Letter of Transmittal
Limit to one or two pages.
6. 3. 1 Briefly state the proposer' s understanding of the work to be done and make a positive
commitment to perfonn the work.
6.3.2 Give the names of the persons who will be authorized to make representations for the
proposer, their titles, addresses and telephone numbers.
6.4 General Infonnation:
6.4. 1 Name of business
6.4.2 Mailing Address/ Phone Number/Fax NumberIW eb Site/ E- mail Address
6.4. 3 Names of persons to be contacted for infonnation of services if different from the
name of person in charge.
6.4.4 Business hours of business.
6.4. 5 State if business is local, national or international and indicate the business legal
status ( corporation, partnership, etc.).
6.4. 6 Give the date business was organized and/ or incorporated, and where.
6.4.7 Give the location of the office from which the work is to be done and the number of
professional staff employees at the office.
6.4. 8 Indicate whether the business is a parent of subsidiary in a group of finns/ agencies.
6.4. 9 State ifthe business is licensed, pennitted and/ or certified to do business in the State
of Florida and attach copies of all such licenses issued to the business entity.
6.4. 10 Finns submitting proposals as a joint venture shall submit to the City, as a part of
their proposal, a copy of joint agreement.
6. 5 Requirements:
the
Proposers must provide documentation, which demonstrates their ability to satisfy all of
minimum qualification requirements outlined below. Proposers who do not meet the
minimum qualification requirements or who fail to provide supporting documentation shall
not be considered for award.
6. 5.1 Capabilities of Finn:
A statement of proposer' s qualifications to serve as a consultant for the services
required, including a listing of all key project personnel, Proposers shall also provide
a description of in house professional and technical support as well as outside
or
subcontracted consulting services. Qualification statements shall include detailed
evidence or proposer' s ability to perfonn Engineering/Consulting services.
Purchasing Department Page: 8
Engineering / Consulting Services, Stonnwater Utility Study Request for Proposal 07- 113
Determination of proposer' s successful ability to perform will be at the discretion of
the City of Fort Walton Beach. Key personnel who will comprise the team to serve
the City' s project( s) should be identified by name and credentials. Resumes ofthe
individuals who will perform the required tasks shall be provided.
6. 5.2 Past Performance:
Each proposer shall provide proof of a minimum of five ( 5) years experience with
similar work along with a detailed description of the three ( 3) most recent projects
similar in scope including point of contact and telephone number.
6. 5. 3 Willingness affirm to work within budget and time constraints:
Describe willingness of proposer to work within the City' s budget and time
constraints and manner in which the proposer will work with the City to ensure
requirements of the scope of work are met. A statement of disclosure certifying the
bidder or
proposers bears no relationship, past or present, with any potential
contractor, which may hinder, impede or in any way compromise efforts to perform
complete, unbiased and objective services for the City.
6. 5.4 Firm' s ability to furnish services:
This criterion relates to the " Willingness ofthe firm to work within budget and time
constraints." The City will evaluate whether the firm can meet the City' s required
timetable for the City project( s) and whether it can provide for the special and unique
requirements of the project( s), including a projected timeline of activities from
project start through project completion. Proposers shall submit a detailed project
plan and schedule that shall demonstrate how the firm anticipates meeting the
aggressive schedule set for completing this study, drafting an ordinance, and
developing and implementing the stormwater utility by November 30, 2007.
6. 5. 5 Experience ofthe firm with regard to Municipal or similar type services:
A listing of all stormwater utility studies accomplished for other government entities.
A brief description of the project( s) and/ or highlights of services performed.
State whether the firm has ever had to defend an ordinance related to a stormwater
utility and, if so, the outcome of the defense.
Purchasing Department Page: 9
Engineering / Consulting Services, Stonnwater Utility Study Request for Proposal 07- 113
6. 5. 6 Minority Business Enterprise ( MBE)
The City will
